Farid Ullah Khan, Resident Engineer SCADA &Telecomm

Farid Ullah Khan

Resident Engineer SCADA &Telecomm

NTDC, WAPDA (Water & Power Development Authority)

Location
Pakistan - Peshawar
Education
Master's degree, Master in Business Administration
Experience
23 years, 10 Months

Share My Profile

Block User


Work Experience

Total years of experience :23 years, 10 Months

Resident Engineer SCADA &Telecomm at NTDC, WAPDA (Water & Power Development Authority)
  • Pakistan - Peshawar
  • My current job since June 2012

I am responsible for Installation, Commissioning and fault rectification of various teleprotection & telecomm equipments: OPGW (Optical Power Ground Wire) FOX-515, PLC (Power Line Carrier), Exchanges and Remote Terminal Unit.

Maintenance of Fiber Optics, telecomm, SCADA and Teleprotection equipments.

Fault rectification of SCADA and telecom system.

Preparation of monthly and annual progress reports.

Preparation of daily fault report for onward submission to the higher office.

Staff under control:

5 No. Sub engineers.
14 No. Super visor.

Number of Grid Stations/Power Houses under control:

No. of 500 kV Grid Station: 1
No. of 220 kV Grid Station: 3. No. of 132 kV Grid Station: 15
No. of 66 kV Grid Station: 3. No. of Power Houses: 2.

Types of Equipments:

Exchanges: DCX-5, DCX 600, ECSFX, ECSFD.
PLC Types: FOX 515, ZAP-51, ZAP-52, ZAP-01, ETI-21, ETI-101, ETL-81, ETL-540, MICOM T390. Teleprotection: NSD-60, NSD-61, NSD-50, NSD-550, DIP 5000.

SCADA & Telecomm Engineer at Lahmeyer International
  • United Arab Emirates - Abu Dhabi
  • April 2011 to April 2012

- Worked as SCADA & Telecomm Engineer, I WAS responsible to manage the project with project time schedule and local cost budget. Was managing the assigned project teams and activities. Was organizing and coordinating regular project meetings with Contractor and subcontractors. Ensure timely and accurate internal project reporting and controlling.
- Was adjusting the complete schedules for the testing period and weekly test schedules. Was coordinating and supervising the work of all testing & commissioning activities. Was coordinating all the activities with Client within schedules. Was Arranging all documents and records of the project (O&M manuals, specification, factory test results, site test results, approved drawings … etc). Was monitoring the progress of the testing period and Preparation of weekly and monthly progress reports for onward submission to the higher authorities. Technical support and supervise the testing/commissioning activities. (My designation shows that I am capable of working on both, Managerial as well as Technical side.)
- Was Responsible for Commissioning and Witnessing of various Telecommunication equipments:

Under Ground Fiber Optic cables.
OLTE SDH (STM-4/1) ABB MUX FOX 515
Commissioning and Supervision of SCADA Closed Loop test.
48V DC system
Remote Terminal Unit RTU (ABB RTU560).
Teleprotection (ABB NSD570). Teleprotection End To End test.

- Projects:
132kV Naimiyah S/S (AJMAN), 132kV Sawan S/S (AJMAN ), 132 kV Ajman PS S/S (AJMAN)
132 kV Ajman Main S/S (AJMAN), 132 kV Umm Al Quwain MS S/S (SCC), 132kV Water Tower, 132kV Shaggi Main S/S (RAS AL KHAIMA), 132kV Zawra Main (AJMAN),
132 kV Fujairah Main (Fujairah), 132kV Ghurfa Main (Fujairah), 132kV Shariya (Fujairah), 132kV Masafi Main (Fujairah), 132kV Dhaid Main, 132kV Dibba Main (Fujairah), 132kV New Rifa (Fujairah), 132kV Qusaidat Main (RAS AL KHAIMA), 132kV New Nakheel Old Town (RAS AL KHAIMA), 132kV Ras Al Khaima Main (RAS AL KHAIMA),

Senior Commissioning & Services Engineer (SCADA & Telecomm) at Saudi Electricity Company “Commissioning & Services Department”, Jeddah, KSA.
  • Saudi Arabia - Jeddah
  • June 2008 to March 2011

- Worked as Senior Commissioning & Services Engineer, I was responsible for adjusting the complete schedules for the testing period and weekly test schedules. Was coordinating and supervising the work of all testing & commissioning activities and keep all people under safety conditions and monitor final completion of the work, coordinating all the activities with Client within schedules. Was arranging all documents and records of the project, Monitoring the progress of the testing period and Preparation of weekly, monthly and annual progress reports for onward submission to the higher authorities. Technical supporting and supervising the testing/commissioning activities.
- Commissioning and Supervision on:
OPGW (Optical Ground Wire Testing)
Under Ground Fiber Optic cables.
OLTE SDH (STM-16/4/1) Siemens SDH hit7050CC, SDH hit7060CC and ABB SDH FOX 515X and MUX FOX 515
Commissioning and Supervision of SCADA Closed Loop test.
48V DC system
PLC (Digital Power Link)
Remote Terminal Unit RTU (Siemens SICAM ERTU, SAT AK1703 ACP and ABB RTU560).
Teleprotection (Siemens SWT3000 and ABB NSD570). Teleprotection End To End test.
Power Cables (FAT as well as site testing of 380kV overhead lines, 110/13.8 kV underground cables)
Switch Gear 13.8 kV Tests (Metal clad switch Gear).
Control Panels (Fault Recorder, Sequence Event Recorder, Annunciation panel, MW & MVAR, Mosaic, Transducer, ABTS & AVR/AVC panels.
Protection Relays.
FAT & SAT
- Projects:
380 kV Rabigh-2 S/S (Jeddah)
380/110 kV Thowal S/S (Thowal)
380/110/13.8 kV Kandara S/S (Jeddah)
380/110 kV Wadi Jaleel S/S (Makkah)
110/13.8 kV Ajwad S/S (Jeddah)
110/13.8 kV Nuzha S/S (Makkah)
110/13.8 kV Nawariah S/S (Makkah)
110/13.8 kV ICY-4 S/S (Jeddah)
110/13.8 kV KM-14 S/S (Jeddah)

Commissioning & Services Engineer (SCADA & Telecomm). at Saudi Electricity Company “Commissioning & Services Department”, Jeddah, KSA.
  • Saudi Arabia - Jeddah
  • June 2006 to June 2008

- Worked as coordinator, I was responsible for the distribution of engineers at different substations; also was arranging engineers according to the announcements. Preparation of weekly, monthly and annual progress reports for onward submission to the higher authorities. (My designation shows that I am capable of working on both, Managerial as well as Technical side.)
- Was responsible for Design review, Commissioning and Witnessing of various telecomm, Switch Gears and Protection equipments:
OPGW
Under Ground Fiber Optic cables
OLTE SDH (hiT7050CC, MXS19)
PLC (Digital Power Link)
Remote Terminal Unit (SICAM eRTU).
Teleprotection (SWT3000, TEBIT).
Protection Relays.
FAT & SAT


Projects:
380 kV JAMIA S/S (Jeddah)
110/13.8 kV AL HARAJ S/S (Jeddah)
110/13.8 kV AL SALAMA S/S (Jeddah)
110/13.8 kV DHAHBAN S/S (Jeddah)
110/13.8 kV AL TANEEN S/S (Makkah)
110/13.8 kV Shoqiyah S/S (Makkah)
110/13.8 kV Bawadi S/S (Jeddah)
110/13.8 kV Rehab S/S (Jeddah)
110/13.8 kV Rawas S/S (Jeddah)

Resident Engineer SCADA &Telecomm. at NTDC, WAPDA Ghazi Barotha Power House, Ghazi Barotha Attock, Pakistan
  • Pakistan
  • April 2005 to June 2006

- Were responsible for Installation, Commissioning and fault rectification of various teleprotection & telecomm equipments: OPGW (Optical Power Ground Wire) FOX-515, PLC (Power Line Carrier), Exchanges and Remote Terminal Unit.
- Maintenance of Fiber Optics, telecomm, SCADA and Teleprotection equipments.
- Fault rectification of SCADA and telecom system.
- Preparation of monthly and annual progress reports.
- Preparation of daily fault report for onward submission to the higher office.
Staff under control: 6 No. Sub engineers.
11 No. Super visor.
- Number of Grid Stations/Power Houses under control:
No. of 500 kV Grid Station: 1
No. of 220 kV Grid Station: 1.
No. of 132 kV Grid Station: 5
No. of 66 kV Grid Station: 3.
No. of Power Houses: 1.
1450 MW power station, 5 Nos power generating units.
Types of Equipments:
Exchanges: DCX-5, ECSFD.
PLC Types: FOX 515, ZAP-51, ZAP-52, ZAP-01, ETI-21, ETI-101, ETL-41, ETL-540 .
Teleprotection: NSD-60, NSD-61, NSD-50, NSD-550.

Assistant Director SCADA & Telecomm. at NTDC, WAPDA NPCC National Power Control center, Islamabad, Pakistan
  • Pakistan - Islamabad
  • November 2002 to April 2005

-Were Responsible for Installation, Commissioning and fault rectification of various telecomm equipments: PLC Power Line Carrier, Exchanges, Radio equipments and Remote Terminal Unit.
-Maintenance of 60 Microwave Channels connecting the control centre, telecomm & SCADA System.
-Fault rectification of SCADA and telecom system.
-Preparation of daily fault report for onward submission to the higher office.
Types of Equipments:
Exchanges: DCX-600, DCX-5, ECSFX, PLC Types: Analogue Microwave 60 channels, Radio equipments, Speech Plus Terminals units, ZAP-51, ETL-41, and ACE-32 (Digital PLC).
SCADA: Front-end computers, modems of RTU’s, Subscription data links with regional control centre (south).
Work On Different Projects Under WAPDA.
- Chasma Hydro Power Plant
Capacity: 180 MW, Details of Circuit: 4 circuits of 132KV each.
I worked as a client with Chasma Group of Consultants. I was primarily responsible for SCADA and telecommunication work. I worked in coordination with the consultants in installation, commissioning and testing of the RTU (Collector 400) and Digital Exchanges.
-220 KV Grid Station Peshawar Road Islamabad
Contractor: M/S Ganish Turkey responsible for SCADA and Telecommunication Works.
I worked in coordination with the contractor in the installation, wiring up of RTU, commissioning and testing of the RTU. Also worked on the installation and commissioning of the Digital Exchanges.
-Ghazi Barotha Power House
Capacity: 1450 MW, Contractor: M/S Alstom, Sub Contractor: M/S ABB, Details of Circuits: 2 nos circuits of 500KV presently extendable to 4 nos circuits of 500KV in future.
I worked as a client and was primarily responsible for coordination regarding installation of fiber optics for Power House, Switchyard and tail barrage. Installation of FOX 515, ECSFD exchanges, teleprotection, remote terminal unit (collector 400), commissioning, final testing and inspection of the above equipments.

Assistant Manager (M.I.S) at A.J Textile & Spinning Mills pvt Ltd, Peshawar (NWFP), Pakistan.
  • Pakistan - Peshawar
  • May 2000 to September 2002

- I was supervising the complete network (LAN) of the organization.
- My task was to look after the complete network and provide the best possible service of computers to the managerial staff of the organization.
- My designation shows that I am capable of working on both, Managerial as well as Technical side.
- It was a good experience of coupling management skills with my basic Technical knowledge.

Education

Master's degree, Master in Business Administration
  • at Abasyn university
  • January 2019

Human resource management

Bachelor's degree, Communication
  • at NWFP University Of Engineering & Technology
  • March 2000

Specialties & Skills

Project Work
Internal Reporting
Team Management
Project Reporting
- I have experience in using Microsoft platforms and applications (Operating Systems: MS DOS, Window

Languages

English
Expert

Memberships

Member of Pakistan Engineering Council.
  • ELECT/17640
  • December 2001

Training and Certifications

(Certificate)
Date Attended:
February 2014
(Certificate)
Date Attended:
April 2014
- SIX Months Certificate Course of Fiber Optic, CET, Islamabad. (Certificate)
Date Attended:
August 2004
Valid Until:
February 2005
- Basic Technical course from WAPDA Staff College, Islamabad. (Certificate)
Date Attended:
April 2003
Valid Until:
May 2003
- Basic Management course from WAPDA Staff College, Islamabad. (Certificate)
Date Attended:
March 2003
Valid Until:
April 2003

Hobbies

  • Social Welfare Works
    Member of Blood Organization University of Engineering & Technology, NWFP, Peshawar, Pakistan since 1998.