farid sedky riad riad, Electrical Supervisor

farid sedky riad riad

Electrical Supervisor

Red Sea Company Engineering & Constructor

Lieu
Egypte - Le Caire
Éducation
Diplôme, Industrial high school
Expérience
20 years, 7 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :20 years, 7 Mois

Electrical Supervisor à Red Sea Company Engineering & Constructor
  • Afghanistan
  • juillet 2008 à juin 2010

Full supervision of all electrical works Management of more than 120 electrical technicians Management of work groups, quality monitoring and application of engineering specifications according to the US Engineers Corps Finish the work according to the schedule and the required quality with all the professional safety instructions In all stages of the work from the beginning through the stage of the installation of the crisis for the work of electricity from steel pipes, PVC pipes and Cable Tri and then pull cables and wires and then installation of accessories and finishing and decoration of quality with a few notes

electric super vaisur à Contrack International
  • Afghanistan
  • décembre 2004 à juin 2008

• Electrical installations
• Cable trays installations
• Wiring communication systems
• Fire control system
• Control systems
• Site Utility System
• Termination High-tension.

electric super vaisur à Contrack International
  • Egypte - Le Caire
  • décembre 2004 à novembre 2005

• Electrical installations
• Cable trays installations
• Wiring communication systems
• Fire control system
• Control systems
• Site Utility System
• Termination High-tension.

electric super vaisur à Contrack International
  • Egypte - Le Caire
  • décembre 1989 à novembre 2004

• Electrical installations
• Cable trays installations
• Wiring communication systems
• Fire control system
• Control systems
• Site Utility System
• Termination High-tension.

electric super vaisur à Contrack International
  • Irak - Bagdad
  • mars 2004 à novembre 2004

* March 2004 - Nov. 2004
Contrack International
Project: Air port at Iraq

electric super vaisur à Contrack International
  • Egypte - Le Caire
  • janvier 2000 à février 2004

• Electrical installations
• Cable trays installations
• Wiring communication systems
• Fire control system
• Control systems
• Site Utility System
• Termination High-tension.

electric forman à Contrack International
  • Egypte - Le Caire
  • janvier 1999 à décembre 1999

*• Electrical installations
• Cable trays installations
• Wiring communication systems
• Fire control system
• Control systems
• Site Utility System
• Termination High-tension.

electric forman à Orascom Construction company
  • Egypte - Le Caire
  • janvier 1991 à décembre 1999

• Electrical installations
• Cable trays installations
• Wiring communication systems
• Fire control system
• Control systems
• Site Utility System
• Termination High-tension.

electric forman à Orascom Construction company
  • Egypte - Le Caire
  • janvier 1997 à décembre 1998

* Jan 1997 - Dec 1998
Orascom Construction company
Project: Hyundai exhibition at Cairo - alx highway, Egypt

electric forman à Contrack International
  • Egypte - Le Caire
  • janvier 1995 à décembre 1996

* Jan 1995 - Dec 1996
Contrack International
Project: Hyundai exhibition at AL ma, ady, Egypt

electric forman à Orascom Construction company
  • Egypte - Le Caire
  • janvier 1991 à décembre 1994

* Jan 1991 - Dec 1994
Orascom Construction company
Project: EL Darassa water treatment plan

Projects Experience
• Electrical installations
• Cable trays installations
• Wiring communication systems
• Fire control system
• Control systems
• Site Utility System
• Termination High-tension.

electric forman à Orascom Construction company
  • Egypte - Le Caire
  • janvier 1991 à décembre 1994

• Electrical installations
• Cable trays installations
• Wiring communication systems
• Fire control system
• Control systems
• Site Utility System
• Termination High-tension

Éducation

Diplôme, Industrial high school
  • à Secondary Technical School
  • juin 1986

The study of engineering drawings, identification of technical terms, identification of electrical circuits, detection of faults, how to fix them, how to conduct business in the field, prioritizing work, start-up and dealing with project implementation stages, managing work groups, coordination between different disciplines, In the field of electricity

Specialties & Skills

Communication Systems
Site Server
PowerPlant
Waste Water Treatment
Control M
COMMUNICATION SYSTEMS
CONTROL SYSTEMS
DESIGNING WASTE
FIRE CONTROL
WATER TREATMENT

Langues

Arabe
Langue Maternelle
Anglais
Expert

Adhésions

Dyn Corp International
  • supervision
  • July 2008

Formation et Diplômes

supervision (Formation)
Institut de formation:
United States Army Corps of Engineers
Date de la formation:
April 2004
Durée:
16 heures

Loisirs

  • Reading, and football
    Reading modern scientific books and playing football with friends and colleagues after work and days of rest