Mechanical Project Engineer
MIA Arabia
Total years of experience :11 years, 6 Months
Scope consists of demolition work of boiler, stack, piping, civil foundations, electrical and instrumentation works and tie-ins of piping.
Project: RTR Piping erection and civil works of foundations green and brown field at Hawiyah Gas Plant Expansion Project, KSA
Client: SNAMPROGETTI KSA, Ltd.
Scope consists of civil foundations, manholes, electrical pull pits fabrication, RTR piping fabrication, erection and hydrotest of RTR lines for systems CSW, Fire Water, Drinking water, OWS line under the direct manpower supply to SNAMPROGETTI
189 Tie-in Packages, more than 3500 joints and 540 hydrotest packages
Studying tender documents and giving inputs to estimation department for preparing target budget.
Site surveys and preparing project execution plan, manpower and resource planning, method statements
Project: BACS Riyadh Metro Project (Line-1 and Line-2), KSA
Client: Siemens Arabia Ltd.
Scope consists of preparing shop drawings, procurement, and installation of REL Emergency Diesel generator exhaust line, cooling water lines, fuel lines and vent lines
Studying tender documents and preparing BOQ, giving inputs to estimation department for preparing target budget.
Leading the project from Initiation to shop drawing preparation, procurement, and Construction phase.
Site surveys and preparing project execution plan, manpower and resource planning, method statement and Diesel generator shop drawings packages
Focal person for project engineering, planning, and preparing project weekly reports, progress monitoring in real time, resources monitoring etc.
Monitoring and preparing claim proposals for variation in scope of work, materials, delays, and extension of time.
Project: BI-10-01256-Feul Gas Pipeline at Hawiyah Gas Plant, KSA
Client: SAGPD, COGEN/Renewable Energy Projects Unit, Saudi Aramco
Leading the project from Initiation to Pre-Commissioning phase.
Successful completion of project materials and services procurement, piping fabrication, painting, installation, cleaning, hydro testing and layup of 350 meter 14" on-plot piping and 1.5 Km underground 14" pipeline.
Liaison with Inspection coverage departments; SAGFPIU (Southern area gas facilities project inspection unit, Udhaliyah, Saudi Arabia), PTSD (Pipeline technical services department).
Civil/Structural works includes pipeline trench, anchor blocks and pipe supports foundations and erected structures.
Procurement works includes; Preparation of MR(Aramco material requisitions) for valves, piping, FBE coating, anchor bolts, reinforcement bars, structure, pipe fittings and 14" API 600 valves and subsequent IAPs (Inspection Assignment package),
Hot-tap, Tie-ins and hydro test packages and getting approval from SAGFPIU and PTSD.
Reviewing and assisting in preparation of site material requests, project technical submittals and related correspondence logs, RFIs, weekly progress reports, weekly progress and quality MOM.
56" split tee installation and vertical hot tapping activity package preparation for 56" HUG-1, Seg-2 pipeline to connect it with 14" pipeline
Installation and testing of ICCP(Impressed current Cathodic protection) and Permanent SACP(Sacrificial anode CP) system.
Project: BI-10-00879-BTX Filtration systems in Hawiyah, NGL Plant, KSA
Client: SAGPD, Gas and Abqaiq Plants Projects Unit, Saudi Aramco
Leading the project from Initiation to Pre-Commissioning, Commissioning and successful completion.
Major works includes: Demolition of asphalt, excavation, laying up filter mat foundations, backfilling and compaction, asphalt roads and concrete paving, erection of ASME pressure vessels (14 meter height, 3.5 meter OD) and structural platforms, supports and process piping installation, conduit works of lights and instruments, instrumentation and KV and ZV installation.
Working with SAPMT for project planning, site development and purchase specifications of materials
Responsible for overseeing all project documentation including method statements, technical queries, JSA’s, As-built drawings and material approvals.
Liaison with clients and subcontractors on regular basis to ensure that project is carried out in accordance with Aramco specifications with due respect to safety, operability and maintainability.
Tracking of all project activities and dealing with day to day contract and site issues of construction.
Checking all project drawings and vendor documents for quantity surveying for piping, structure, civil, equipment, painting, scaffolding, insulation, conduits and tubing works.
Projects: 1) BI-10-01202-Blowers upgrading project, Hawiyah Gas Plant, KSA
2) Installation of Turbocharger technology-HGP, KSA
Client: Hawiyah Gas Plant, Saudi Aramco
Leading the project from Initiation to Pre-Commissioning, MCC, Commissioning and demobilization.
DMW air blower’s installation in three Sulfur recovery trains, two in each and associated works of piping, civil, structure, electrical wiring, instrumentation and DCS/ESD.
Installation of ERI technology generators and turbines in GT Area.
Presenting the weekly project progress to Aramco PSU.
Defining the procedures and plan of modification items relating to blower foundation, structural and piping systems
Project time estimation, scheduling, execution and monitoring
Preparing bill of materials for piping, civil and structural materials.
Project: CHF project of ARAMCO, Manifa, KSA
Client: Tecnicas Reunidas
Completed the piping and Ducts work of the area MACC-01 (Main air cooler condenser) in the COGEN area.
Completed enormous test packages and reinstatement work of the Piping systems.
Project: CHF project of ARAMCO, Manifa, KSA
Client: Saipem
Supervising the pre-fabrication and installation of piping spool assemblies from material through to final review of test packs along with structural supports works.
Project: Annual Turnaround of Petrokemya, Jubail, KSA
Client: SABIC
Sand blasting and coating activities of pre-fabricated spools in the workshop.
Dealing with the Maintenance activities of the piping systems.
Dismantling of the structures for miscellaneous maintenance activities.
Project: Construction Phase of Arab Steel, Dammam, KSA
Client: Al-Tuwairqi Holding
Dealing with Electric Arc Furnace piping drawings, Quantity surveying, MTO extraction, fabrication and erection.
Construction of isometric drawings from plan drawings for site.
Bachelor of Engineering in Metallurgical & Materials Engineering
Intermediate in Pre-Engineering
Metriculation in Science