Work Experience

Total years of experience :11 years, 6 Months

Mechanical Project Engineer at MIA Arabia
  • Saudi Arabia - Jubail
  • My current job since June 2020

 Scope consists of demolition work of boiler, stack, piping, civil foundations, electrical and instrumentation works and tie-ins of piping.

Project Engineer Mechanical at MIA Arabia
  • Saudi Arabia - Hofof
  • February 2020 to June 2020

Project: RTR Piping erection and civil works of foundations green and brown field at Hawiyah Gas Plant Expansion Project, KSA
Client: SNAMPROGETTI KSA, Ltd.

 Scope consists of civil foundations, manholes, electrical pull pits fabrication, RTR piping fabrication, erection and hydrotest of RTR lines for systems CSW, Fire Water, Drinking water, OWS line under the direct manpower supply to SNAMPROGETTI
 189 Tie-in Packages, more than 3500 joints and 540 hydrotest packages
 Studying tender documents and giving inputs to estimation department for preparing target budget.
 Site surveys and preparing project execution plan, manpower and resource planning, method statements

Mechanical Project Engineer at MIA Arabia
  • Saudi Arabia - Riyadh
  • May 2019 to January 2020

Project: BACS Riyadh Metro Project (Line-1 and Line-2), KSA
Client: Siemens Arabia Ltd.

 Scope consists of preparing shop drawings, procurement, and installation of REL Emergency Diesel generator exhaust line, cooling water lines, fuel lines and vent lines
 Studying tender documents and preparing BOQ, giving inputs to estimation department for preparing target budget.
 Leading the project from Initiation to shop drawing preparation, procurement, and Construction phase.
 Site surveys and preparing project execution plan, manpower and resource planning, method statement and Diesel generator shop drawings packages
 Focal person for project engineering, planning, and preparing project weekly reports, progress monitoring in real time, resources monitoring etc.
 Monitoring and preparing claim proposals for variation in scope of work, materials, delays, and extension of time.

Project Engineer (Aramco Approved) at Evergreen Contracting Est. Riyadh, KSA
  • Saudi Arabia - Hofof
  • August 2017 to August 2018

Project: BI-10-01256-Feul Gas Pipeline at Hawiyah Gas Plant, KSA
Client: SAGPD, COGEN/Renewable Energy Projects Unit, Saudi Aramco

 Leading the project from Initiation to Pre-Commissioning phase.
 Successful completion of project materials and services procurement, piping fabrication, painting, installation, cleaning, hydro testing and layup of 350 meter 14" on-plot piping and 1.5 Km underground 14" pipeline.
 Liaison with Inspection coverage departments; SAGFPIU (Southern area gas facilities project inspection unit, Udhaliyah, Saudi Arabia), PTSD (Pipeline technical services department).
 Civil/Structural works includes pipeline trench, anchor blocks and pipe supports foundations and erected structures.
 Procurement works includes; Preparation of MR(Aramco material requisitions) for valves, piping, FBE coating, anchor bolts, reinforcement bars, structure, pipe fittings and 14" API 600 valves and subsequent IAPs (Inspection Assignment package),
 Hot-tap, Tie-ins and hydro test packages and getting approval from SAGFPIU and PTSD.
 Reviewing and assisting in preparation of site material requests, project technical submittals and related correspondence logs, RFIs, weekly progress reports, weekly progress and quality MOM.
 56" split tee installation and vertical hot tapping activity package preparation for 56" HUG-1, Seg-2 pipeline to connect it with 14" pipeline
 Installation and testing of ICCP(Impressed current Cathodic protection) and Permanent SACP(Sacrificial anode CP) system.

Project Engineer at Evergreen Contracting Est. Riyadh, KSA
  • Saudi Arabia - Hofof
  • September 2015 to June 2017

Project: BI-10-00879-BTX Filtration systems in Hawiyah, NGL Plant, KSA
Client: SAGPD, Gas and Abqaiq Plants Projects Unit, Saudi Aramco

 Leading the project from Initiation to Pre-Commissioning, Commissioning and successful completion.
 Major works includes: Demolition of asphalt, excavation, laying up filter mat foundations, backfilling and compaction, asphalt roads and concrete paving, erection of ASME pressure vessels (14 meter height, 3.5 meter OD) and structural platforms, supports and process piping installation, conduit works of lights and instruments, instrumentation and KV and ZV installation.
 Working with SAPMT for project planning, site development and purchase specifications of materials
 Responsible for overseeing all project documentation including method statements, technical queries, JSA’s, As-built drawings and material approvals.
 Liaison with clients and subcontractors on regular basis to ensure that project is carried out in accordance with Aramco specifications with due respect to safety, operability and maintainability.
 Tracking of all project activities and dealing with day to day contract and site issues of construction.
 Checking all project drawings and vendor documents for quantity surveying for piping, structure, civil, equipment, painting, scaffolding, insulation, conduits and tubing works.

Project Engineer at Evergreen Contracting Est. Riyadh, KSA
  • Saudi Arabia - Hofof
  • January 2013 to July 2015

Projects: 1) BI-10-01202-Blowers upgrading project, Hawiyah Gas Plant, KSA
2) Installation of Turbocharger technology-HGP, KSA
Client: Hawiyah Gas Plant, Saudi Aramco

 Leading the project from Initiation to Pre-Commissioning, MCC, Commissioning and demobilization.
 DMW air blower’s installation in three Sulfur recovery trains, two in each and associated works of piping, civil, structure, electrical wiring, instrumentation and DCS/ESD.
 Installation of ERI technology generators and turbines in GT Area.
 Presenting the weekly project progress to Aramco PSU.
 Defining the procedures and plan of modification items relating to blower foundation, structural and piping systems
 Project time estimation, scheduling, execution and monitoring
 Preparing bill of materials for piping, civil and structural materials.

Mechanical Engineer at Evergreen Contracting Est. Riyadh, KSA
  • Saudi Arabia - Eastern Province
  • October 2012 to January 2013

Project: CHF project of ARAMCO, Manifa, KSA
Client: Tecnicas Reunidas

 Completed the piping and Ducts work of the area MACC-01 (Main air cooler condenser) in the COGEN area.
 Completed enormous test packages and reinstatement work of the Piping systems.

Mechanical Supervisor at Global Sources for General Contracting, Jubail, KSA
  • Saudi Arabia - Eastern Province
  • May 2012 to October 2012

Project: CHF project of ARAMCO, Manifa, KSA
Client: Saipem

 Supervising the pre-fabrication and installation of piping spool assemblies from material through to final review of test packs along with structural supports works.

Mechanical Supervisor at Kanooz Industrial Services, Jubail, KSA
  • Saudi Arabia - Jubail
  • April 2012 to May 2012

Project: Annual Turnaround of Petrokemya, Jubail, KSA
Client: SABIC

 Sand blasting and coating activities of pre-fabricated spools in the workshop.
 Dealing with the Maintenance activities of the piping systems.
 Dismantling of the structures for miscellaneous maintenance activities.

Assistant Mechanical Engineer at Arab Iron and Steel Company, Dammam, KSA
  • Saudi Arabia - Dammam
  • January 2012 to April 2012

Project: Construction Phase of Arab Steel, Dammam, KSA
Client: Al-Tuwairqi Holding

 Dealing with Electric Arc Furnace piping drawings, Quantity surveying, MTO extraction, fabrication and erection.
 Construction of isometric drawings from plan drawings for site.

Education

Bachelor's degree, Metallurgical & Materials Engineering
  • at University of Engineering & Technology, Lahore
  • October 2011

Bachelor of Engineering in Metallurgical & Materials Engineering

High school or equivalent, Engineering
  • at Govt. Civil Lines College
  • June 2007

Intermediate in Pre-Engineering

High school or equivalent, Metric (Science)
  • at BISE
  • May 2005

Metriculation in Science

Specialties & Skills

Job Planning
English speaking
Project Management
Team Leadership
Construction Project Management
Project Management
International Standards
Auto Cad
Microsoft Project 2007
MS Office
Construction Project Management

Languages

English
Expert
Urdu
Expert
Arabic
Beginner

Memberships

Saudi Engineering council
  • Materials Engineer
  • July 2016
Pakistan Engineering council
  • Metallurgical and Materials Engineer
  • November 2011

Training and Certifications

Saudi Aramco Approval for Project Engineer (Certificate)
Date Attended:
May 2017
Primavera P6 (Certificate)
Date Attended:
June 2011
Valid Until:
August 2011
Turbocharger Technology Hawiya Gas plant, Appreciation certificate (Certificate)
Date Attended:
May 2015
Valid Until:
January 9999
Blowers Upgrading project Appreciation certificate (Certificate)
Date Attended:
May 2015
Valid Until:
January 9999