1. Supply, Installation, Testing and Commissioning of CAT generator sets on various project sites.
2. Participate in Tender business, preparation of bid proposals, costing and budgeting for EPC/Turnkey Projects
3. Contributing in design reviews and technical clarification meetings with project consultants and stake holders.
4. Develop overall power plant layouts, P & IDs, prepare and review technical drawings of package genset and ancillary equipment for final Installation, Testing and commissioning.
5. Coordination with local and foreign vendors, project management and execution
6. Equipment inspection at sites, Technical report submission, preparation of installation guideline.
7. Network studies (Transient, Load flow and short circuit analysis) of Industries and self generation plants.
On- JobTrainings:
Attended the following traingings as organized by Caterpillar in their Dubai Training Center.

• Application and use of Caterpillar Global Petroleum & EPG Gensets
• Application and use of Double conversion UPS (Battery Type and Flywheel)

Project Achievements:
 Outstanding performance award on Fatima Fertilizer Project Management executed in Year 2008.
 Outstanding performance award for the year 2013
 Outstanding performance and dedication award for the year 2016.

Protection Engineer في Areva T & D Pvt Ltd.
  • باكستان - كراتشي
  • أبريل 2006 إلى أغسطس 2006

1. Installation, Testing and Commissioning of MV/LV switchgears on various project sites.
2. Testing and Commissioing of all type of Electrical Protetion Relays.

Project Achievements:
 Successfully Tested and commissioned PARCO White Oil Pipe line Project

Electrical Engineer في 157MW Combined Cycle Fauji Kabirwala Power Plant
  • باكستان - ملتان
  • فبراير 2004 إلى فبراير 2006

1. Plan, coordinate and resolve daily preventive maintenance activities during plant operation utilizing CMM system.
2. Prepare, plan and execute maintenance procedures for routine maintenance on Electrical machines and for scheduled plant minor and major overhaul / outage period.
3. Preparation of technical specification for contract works and under take technical supervision of contractors.
4. To order plant spares and set track stock level so as to avoid shortage of spares during major overhaul of the plant for increased plant availability
5. Preparation of budgetary proposals for assigned job
6. Responsible for Installation, Testing, Commissioning and trouble shooting of all Electrical equipments. (HV switchyard, Transformers, Generators, AC/DC drives, Protection Relays, MV/LV switchgears, Batteries, UPS etc)
7. Review and initiate Electrical design modifications for plant optimum performance.
8. Hands on experience of handling various Electrical Tools plant and equipment as listed below.

(a) Relay Secondary Injection Test equipment : Severker 760, Omicron and Pulsar
(b) Capacitance and Dissipation Factor CB100
(c) Battery Impedance Test and Ground Fault Locator Equipment.
(d) Cable Fault locator
(e) Circuit breaker Contact resistance Test Set.
(f)Transformer Winding Resistance Test Set.

Executive Engineer في Siemens Pakistan Engineering Co.Ltd
  • باكستان - كراتشي
  • سبتمبر 1999 إلى فبراير 2004

1.As project manager successfully executed Erection, Installation, Testing and Commissioning of Electrical equipments on various project sites.
2.Completed E & I works related to Gas conversion of 412MW combined cycle Rousch Power Plant
3.Completed E & I works during major outage of 600MW combined cycle Uch Power Plant.
4.Installation, Testing and commissioning of MV/LV switchgears, Protection Relays on various project sites.
5.Erection, Installation and commissioning of Miano -1 Gas Well development project at OMV Pakistan Exploration.
6.Supervision of Erection and Installation activities of 30, 000bpd Byco Pakistan Oil Exploration.
7.Management and supervision of technical staff employed on various project sites.

Project Achievements:

1. Outstanding performance certificate by Siemens Power generation on Gas conversion of 412MW combined cycle Rousch Power Plant. (Abdul Hakim - Pakistan)

الخلفية التعليمية

بكالوريوس, Electrical
  • في NED UNIVERSITY OF ENGINEERING AND TECHNOLOGY
  • أبريل 1999

72%

Specialties & Skills

Project Management
Electrical Maintenance
Power Generation
Electrical Engineering
Auto Cad
MS OFFICE
MS Project
Prima Vera

اللغات

الانجليزية
متمرّس
الأوردو
متمرّس

العضويات

Pakistan Engineering Council
  • Professional Engineer
  • May 1999