Plant Superviser
cooper industries
Total years of experience :19 years, 3 Months
I was assigned to work as a factory supervisor as Project engineer with more than 60 employees under me with different nationalities. This task gives me the opportunity to fulfill a leadership part at my career. I was handling 5 sections in the factory in which producing different types of materials. This position allows me to deal with different type of software’s such as SAP, Fingerprint and Timesheet. In addition, I was fulfilling gapes in between any absentees to get the work flow on reasonable manners.
Cooper Industries. Project Engineer
I was assigned to work as a factory supervisor as Project engineer with more than 60 employees under me with different nationalities. This task gives me the opportunity to fulfill a leadership part at my career. I was handling 5 sections in the factory in which producing different types of materials. This position allows me to deal with different type of software's such as SAP, Fingerprint and Timesheet. In addition, I was fulfilling gapes in between any absentees to get the work flow on reasonable manners.
Aramco KHURSANIYAH Gas Producing Facilities Div. Project
Site Superintendent Engineer III, April 18, 2009-June 5, 2012
Loop Folders Shooting, Functional Testing responsibility, Aramco Standers familiar. Loop Folders systematize, Instrument Installations verify, P&ID walkthroughs. Contractor site construction follow ups.
Fluor Arabia
Instrumentation Engineer II, October 18, 2007-March 31, 2009
Sipchem (Saudi International Petrochemical Company)
I was hired as Instrumentation Engineer III. However, I 'm assigned to review submittals, coordinate with the design contractor, conduct technical meetings providing solutions to numerals work issues, inspect the contractor work flow as the project progress, review RFI's, and preparing a leader work schedule procedure.
Al-Hugayet Company
Electrical Field Engineer, Aug 2003- Oct 2007
UPGRADE SANITARY WASTEWATER TREATMENT FACILITIES, DH/
BI 10-00466
In this project I was evolved in the early design stage to work along with the designer contractor office in designing this project. However, this experience gave me the opportunity to gain more knowledge of a flow of a project, plan through out the project, estimate the total cost of the project.
DH LAP R&D project/ BI 10-3313
I was involved with following up contractor's weekly progress. Moreover, reviewing technical submittals, advising contractor, writing daily reports, plan through out the project, and estimating the cost of the project, conducting meetings with contractor, vendors, designer and assuring safe and successful works.
ABQAIQ LAP/ BI 10-3420
I was working as Site Superintendent for Six months. Covering the place of Civil, Mechanical and Electrical Engineer. I gain the opportunity to deal with more electrical equipments such: 200KVA transformers, Stand-alone UPS's, and testing/commissioning electrical cables.
SUP (Security Upgrading Project) BI 10-00221
In this project, I was involved in providing Electrical power to the CCTV System, street lighting, Guard houses, and all associate (trenching, terminating, testing, and commissioning) . Thus, install new Electrical devices such as: Fiber optic Mesh, and Security Cameras around communities. However, this project increased my knowledge in coordination with other Aramco departments.
Schlumberger, June 2001- Nov. 2001
Working as MWD/LWD Engineer
• Oil Industry Production
Baker Hughes Intec, 2000-2001
• Drilling Oil wells
EDUCATI ON
1- FAS: (Facility Advance System) Trained to maintain and repair critical equipments such as UPS (Un-interrupted Power Source), rectifiers, inverters and soothe electrical equipment. Also, I'm trained to follow up with T.T. and S.O. that are related to facility unit at Bldg 840, Dhahran. Thus, maintaining the PM (Preventive Maintenance), assigning work to Sub-contractor for Bldg. projects. Moreover, had some courses while in facility unit such as: 1. DIP (Driving Improvement Program) at DH Driving School and pass with excellent grade. 2. Three days lecture about Aramco Ten roles and improvement set by Dr. Almushai (Communication and Technology VP) • Baker Hughes Intec A performance drilling engineer / Coring engineer, that's deals with vertical wells drilling and taking samples from layers of formations and calculate the Hydraulics Proposals. 1. (H2S) training on how to breathe and act under a leaking gas situation. • Schlumberger MWD (measurement while drilling) / LWD (logging while drilling) Engineer, this deals a lot with providing the client with the well logs and type of formation. Also reading the signals of radiations coming from the ground. 2. CPR training: Where we learned how to deal in situation of emergences or accidents or even body bums. 3. Basic Fire Fighting 4. Basic Medic First Aid REFRANCES Communication Dept (DH): Ismail, Ali J, Tell. 876-4363 or Email at ALI.ISMAIL. PMT Dept (East Park BI Projects) Darwish, Hilal H, Tell. 862-5431 or Email at HILAL. PMT (Mega Project KGP) Hamidaddin, Alradhi A Tell. 677-3247 or Email at ALRADHI. PMT (Mega Project RTDB2 &DR2) Balharith, Hammad Tell. 8621320 or Email at Hamad.balhareth.