Quality Control Supervisor
Punj Llyod
Total years of experience :18 years, 5 Months
Instrument
Project Specifications, IEC and ISO 9001:2000 Standards
Job Profile:
Preparation of Quality Procedures and ITP for Electrical and Instrumentation as per IEC Requirements. Managing Area Wise Quality Inspectors and Attending Client Co-ordination Meetings and Replying to Violations and NCRs. Preparation and revision of Documentation. Submission of Dossiers, Sub-system folders for the Final Completion as per IEC Engineering Standards, Project Specifications. Clearing Punch List, NCR and Conducting Walkthroughs for client Representatives.
Project: Increase East West Pipeline Project (Cross-country Pipeline)
Job Profile:
Preparation and Review of Quality Project Procedures and ITP as per Aramco Requirements. Maintaining NCR and Logbook Book Entry ad timely Close out.
Managing Area Wise Quality Inspectors and Attending Client Co-ordination Meetings and Replying to Violations and NCRs Raised by Aramco Project Inspection Department. Area wise checking of Sub-system Folders Inspected by Area Inspectors and submission, handover of documents to Aramco for final acceptance. Efficiently issued Non-Conformance & Site Inspection Reports for non-compliance activities against the approved quality procedures, inspection test plans, codes & standards and closed out on satisfactory corrective / preventive actions. Representing the company in final walkthrough, Generation of Punch lists, expedite timely close out as per A, B and C categories. Close out of system, Sub-system folders
Star Yard, King Abdul Aziz Port (Dammam) for Oil Platforms Construction Onshore (Aramco Project)
Shutdown and Maintenance Project in DAS Island
OAG Gas Plant (Offshore associated Gases), LNG Gas Plant Das Island.
Job Profile:
Preparation of ITP, Check sheets, Quality Procedures and Drawings for the Shutdown. Maintaining Supervision on Inspectors for proper Inspection of Instrument’s, Valves and Electrical Equipment’s for damage, corrosion and malfunctioning. Surveillance of Instrument Re-calibration, Loop check for Instruments and Valves from field to DCS. Area wise checking of Sub-system Folders Inspected by Area Inspectors and submission, handover of documents to Adgas Quality Inspection Dept. for final acceptance.
6) COMPANY: QCON for ADGAS UAE Abu Dhabi (LNG GAS PLANT)
Shutdown and Maintenance Project in DAS Island LNG Gas Plant.
Job Profile:
Preparation of ITP, Check sheets, Quality Procedures and Drawings for the Shutdown. Maintaining Supervision on Inspectors for proper Inspection of Instrument’s, Valves and Electrical Equipment’s for damage, corrosion and malfunctioning. Surveillance of Instrument Re-calibration, Loop check for Instruments and Valves from field to DCS. Area wise checking of Sub-system Folders Inspected by Area Inspectors and submission, handover of documents to Adgas Quality Inspection Dept. for final acceptance
EPC for Gasco 4th NGL Train Project Ruwais) 2.5 billion Dollar Project
Designation: QA/
Instrumentation/ Electrical)
Project Specifications/Standards followed: KNPC Engineering Standards
Job Profile:
Preparation and Review of Quality Project Procedures and ITP as per KOC requirements. Attending Client Co-ordination Meetings and Replying to Violations and NCRs raised by KOC Project Inspection Department. Managing Area Wise Quality Inspectors. Reviewing Inspection test plans, codes & standards and closed out on satisfactory corrective /preventive actions. Representing the company in final walkthrough, Generation of Punch lists, expedite timely close out as per A, B and C categories. Close out of system Sub-system folders for final handover to KOC.
8) COMPANY: SAIPEM (ENI GROUP) MOROCCO.
Samir Oil Refinery Upgrade Project (Green Field and Brown Field Areas)
Morocco (Mohammedia
QA/QC Inspection Activities, as per Oman LNG Engineering Standards. Maintaining Logbook Book Entry for RFIs E & I. Supervision of Quality Inspectors witnessing inspection of Cable Trench, Cable Pulling, Duct Banks, Grounding, Cable Trays. Installation of Instruments, Inspection of Electrical and Instrument Panels, Junction Boxes, Motor Pumps, Chillers, Air Blowers, Cable Meggering & Continuity check, Cable Glanding. Preparation of Documentation and Submission of Dossiers for the Final Mechanical Completion as per Project Specifications, IEC, ISO 9001:2000 and Oman Engineering standards
EPC-Technip for ADCO (Abu Dhabi Oil Company) NEB-Phase 1 (700 million US$ Project)
Liquefied Natural Gas Train 3 Project (Having Green Field and Brown Field Areas) with Chiyoda & Foster Wheeler as Consortium (700 million US$ Project)
Qatif Gosp-1 (1.2 Billion US $ Project) Jubail 2
Designation:
Project Specifications, IEC and ISO 9001:2000 Standards.
Job Profile:
Preparation of Quality Procedures and ITP for Electrical and Instrumentation as per IEC Requirements. Managing Area Wise Quality Inspectors and Attending Client Co-ordination Meetings and Replying to Violations and NCRs. Preparation and revision of Documentation. Submission of Dossiers, Sub-system folders for the Final Completion as per IEC Engineering Standards, Project Specifications. Clearing Punch List, NCR and Conducting Walkthroughs for client Representatives.
Course on Calibration of Temperature, Humidity & Pressure from Electronics Regional Test: Lab (West) Government of India
. (
Physics, Chemistry, Math’s, Biology
Course on Calibration of Temperature, Humidity & Pressure from Electronics Regional Test: Lab (West) Government of India