Fernando Bonganay, Team Leader/Supervisor

Fernando Bonganay

Team Leader/Supervisor

Seas Of Technology

Lieu
Arabie Saoudite - Khobar
Éducation
Baccalauréat, Electronics and Communications
Expérience
27 years, 6 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :27 years, 6 Mois

Team Leader/Supervisor à Seas Of Technology
  • Arabie Saoudite - Province de l'Est
  • Je travaille ici depuis février 2012

Seas of Technology,
Al-Khobar, Saudi Arabia
Feb, 2012 - Present
BI-0955 Team Leader
Huawei - Alerting & Teleconferencing Replacement at Saudi Aramco Kingdom wide. Authorize safety officer and certified permit receiver.
As an authorized safety officer, I made sure operational procedures that recognize hazards. To seek to minimize conflict between safety and production considerations and assess risk and propose workable solutions by making sure all movable materials and hand tools are on proper place every after every job completed. Make everybody responsible and practice for their own safety, carry out inspection, keep records and write reports.
From the issuance of work permit I made sure that I remind fellow worker on fire regulations by inspecting power cables and outlet of standard used, minimize noise, and removed hazardous substances, or occupational health hazard. And after every job done, insures that workplace is always free from unused materials and maintain good housekeeping
Saudi Electric Qurayyah Power Plant - Supervisor
Installation of 189 sets of Cortem Explosion proof lighting fixture in Qurayyah Power Plant.
BI-00246 Supervisor
Huawei - (VOIP) Replacement of Telephone System in Saudi Aramco central region area.
BI-12327-009 Haradh and Hawiyah Gas Plant - Supervisor
Converting Microcor wireless corrosion probe data collector on gas pipeline to wired connection and collect data through network via juniper.

Supervisor à Contracting
  • Philippines
  • février 2011 à novembre 2011

Supervisor
Contracting Self Employed,
Legaspi, Philippines
Feb, 2011 - Apr, 2011
Job Description:

Supervise and lead the ZTE-Smart Communication Wi-max Phase 2 2.5GZTE project implementation for 20 sites.
Oct. 2011 - Nov. 2011
Installed Ericsson mini link TN 6p at six deferent sites in Legaspi covered area for preparation of LTE infrastructure.
With personal Laptop installed mini link LCT and MSM tools.

Field Engineer à Smart Communication Inc.
  • Philippines
  • septembre 1996 à décembre 2010

GSM Operation and Maintenance
Work with NOKIA WBTS Flexi BTS 850 & 3G HSDPA and HSPA. Ericsson RBS 6201, 6102, & 2202
Projects accomplished (special project);
Lead a team during installation of base station including antenna and cable feeder of NOKIA 3G Supreme and NOKIA Flexi BTS 850. Conduct test call in each time slot of the transceiver and GPRS test designated time slot during expansion. Test also for services such as MMS, SMS, Hand-over, and Alarm simulation.
Also immediately restore blocked TRX radio resulting to 99% availability on voice and data channels. As advice by optimization group we do E1 expansion, ET cutover, BSC re-homing, and E1 activation and conduct test call and traffic monitoring.
Generate BTS checklists report and documentation during site audit.
Analyze network services request and conduct implementation.
Perform controlled testing environment as per request such as external alarms activation complete with testing. Alarms clearing, troubleshoot, isolate, diagnose and restore during network outage.

Transmission (Special Project Installation and O&M)
Accomplish installation, commissioning and testing of following vendors.
-SDH/PDH Ericsson Mini-link Traffic Node, Hi-Capacity, Mini-link E
Equipment installation of Ericsson Mini link C and E series radio, Mini link Cross Connect system (MXU) and DXX Basic Nodes.
- Full commissioning of Ericsson Mini link E & C series, Mini link Cross Connect System (MXU) and DXX Basic nodes creation and installation with end to end testing of 2Mb E1 from TN to DXX (ADM) to BSC.
-Knowledge in network building using DXX NMS R14 like creation of Nodes, trunks, circuits and definition of DCN with various NMS tools.
Upgrade for MINI LINK E and Traffic Node for broadband.
- Cut over / migration of RBS to newly installed Traffic Node transmission links.
Complete Installation with end to end testing of 2Mb E1 and finally Integrate to BSC.
Other vendors like Harris Micro star, Harris Stratex Eclipse, Siemens & Fujitsu STM1- SDH with ECI Multiplexer (100, 300, Fujitsu NFRX SDH, RTN 950 Huawei.
-Climb towers for all of the above function.

Power Plant
DC Power Plants which includes EMERSON POWER, NOKIA EM Power, Power One, PSSS, ZTE Rectifiers.
And other vendor supplied equipment.

Optimization
Conduct drive test with reference of other network provider data analyze and submit to the supervisor.

Éducation

Baccalauréat, Electronics and Communications
  • à Cebu Institute of Technology University
  • octobre 1986

Telecommunication studies

Specialties & Skills

Transmission
MDF, DDF, and fusion splicing, installed cat 5 and 6 data networks, phone system and also repaired

Langues

Anglais
Moyen

Adhésions

fiber optic association
  • Certified Fiber Optic Technician
  • August 2011

Formation et Diplômes

7420066 (Certificat)
Date de la formation:
August 2011
Valide jusqu'à:
August 2011
Wifi Broadband Installation and commision (Certificat)
Date de la formation:
April 2005
Valide jusqu'à:
April 2005
Fujitsu SDH Transmission (Certificat)
Date de la formation:
September 2006
Valide jusqu'à:
September 2006
operation and maintenance (Certificat)
Date de la formation:
March 2010
Valide jusqu'à:
March 2010

Loisirs

  • sports
    participate in companies sports activity