Test Engineer
Maxim Integrated
Total years of experience :25 years, 9 Months
Maintain production test systems to its optimum operation:
- troubleshoot system electronics in real time
- Calibrates test system in accordance to OEM specifications
- Maintain source/s of spare parts for plug and play operation
Mentor new technicians
- Creates training manual suited to its role in the maintenance
- Provides in-house training
Collaborates to test development in test production improvement in yield and cycle time
a. Handled different systems. Ensuring optimum operation of the test machine.
b. Troubleshoot system in real time to ensure uninterrupted production with minimal downtime
c. Improve system/program in collaboration to the counterpart in the other company site
d. Ensure availability of the parts for the systems. Buy and secure parts.
• Training and mentoring of new technician
- Create technical training base on the current job
• Maintain and assist setup of test product hardwares
- Perform troubleshooting offline on test hardware problem
- Maintain database of hardware status.
• Perform preventive maintenance and calibration of test systems.
- Perform bi-annual calibration of test system calibration board standard as per OEM specifications.
• Improve or develop process improvement on testing
- Suggested improvement that could help in improving test yield, maintenance cost or cycle time of testing.
• Attended different seminar on human development of the following: 1. Decision Making Seminar - Maxim Integrated, 2012
2. Presentation Skill Seminar - Maxim Integrated, 2013
3. Effective Communication Seminar - Maxim Integrated, 2012
1997 - Sept 2013
Technical Specialists
National Seminconductor / Fairchild,
FTZ, Bayan Baru, Penang Malaysia
• Maintain, support different types of tape and reel machines
- Conducted preventive maintenance
- Troubleshoot during line production problem
- Calibrated machine based on different specification of custormer.
• Trained technical operator on machine setup
• Worked with the other group on product testing improvement: - Pinned the root cause of customer complaint on inoperative device
- Improved the machine productivity by suggesting a re-design track eliminating the device stuck-up situtation
In-house training programs, Maxim Integrated Philippines
1. Decision Making Seminar - Maxim Integrated, 2012
2. Presentation Skill Seminar - Maxim Integrated, 2013
3. Effective Communication Seminar - Maxim Integrated, 2012
In-house training program, National Semiconductor / Fairchild
1. Statistical Process Control level 2
College
1. Technological University Of The Philippines -Taguig City
1994-March 1997
Test/Machine Technician
Allegro Microsystems Inc.
Marimar Village Bicutan Paranaque City
• Handled wire-bond machines
- Conducted preventive maintenance
- Troubleshoot problem during production
- Setup, calibrates machine based on customer's specification
• Handled product
- Validates low yielding products
- Performs benchmarking of product particular specification.
- Worked with USA base counterpart in improving the testing algorithm of the test program in satisfying the customer complaint on defective product
• Worked with other group in process improvement
- Re-engineered a process that improved the tool lifespan of a capillary from 3/day to 1/week.
1986-Jan 1994
Skills/Hobbies/Personal
Diploma in Electronics Engineering Technology, 1982 - 1985
Diploma in Industrial Electronics, 1980 - 1982
1. Can drive car (manual/automatic) and can do minor automotive troubleshooting.
2. Can analyze and troubleshoot consumer appliances.
3. Hobbies are karaoke singing, playing chess, reading technical books, travelling.
4. Personal Data:
Status: Married with 1 child