Gamal Badr, Resident Engineer, construction supervision

Gamal Badr

Resident Engineer, construction supervision

OTAISHAN CONSULTING ENGINEERS

Lieu
Egypte
Éducation
Baccalauréat, Bachelor of Civil Engineering from Faculty of Engineering, Alexandria University- Egypt .
Expérience
37 years, 4 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :37 years, 4 Mois

Resident Engineer, construction supervision à OTAISHAN CONSULTING ENGINEERS
  • Arabie Saoudite - Khobar
  • septembre 2013 à avril 2015

Construction supervision of procare Riaya Hospital Expansion project, my responsibilities were all construction supervision activities at site & office

Project Manager, Civil à OTAISHAN CONSULTING ENGINEERS
  • Arabie Saoudite - Riyad
  • juillet 2009 à février 2013

Project: construction supervision of CAD New API (active pharmaceutical ingredient ) facility at KKIA, Industrial area, Riyadh, Saudi Arabia.
My responsibilities were all construction supervision activities at site and office, such as;
approvals of shop drawings, materials submittals, RFI, construction schedule, payment certificates. Preparing the monthly reports, attending the progress & technical meetings, preparing/reviewing the handing over documents....etc.
For more details of the project, please see the attached CV.

PROJECT MANAGER, construction supervision à KHATIN & ALAMI, RIYADH, SAUDI ARABIA
  • Arabie Saoudite - Riyad
  • juillet 2008 à avril 2009

PROJECT TITLE: AL-WASEEL COMMERTIAL TOWER
AT KING FAHAD MAIN ROAD, RIYADH, KSA

• The project was constructed on land area of 5811 square meters with a built up area of approximately 60, 000 square meters. The project comprises of Four Basements (Parking areas, service rooms and mosque), Ground Floor ( reception, multipurpose hall, showrooms and cafeteria), Mezzanine Floor, 19 Floors (Offices) and Lower & Upper Roofs. The roof topped with artistic steel structure reaching the total height of the building to 163 m. In addition to the external works and the landscaping work. The Tower is equipped with eight elevators, fire detection and fire fighting systems, chilled water system A/C, IP-CCTV, BMS, and IP system. The external facades are curtain walls with Structural Glazing and Aluminum Composite Panels. The cost of the project is about SR. 160 Millions (without the offices finishes).

My responsibilities were all construction activities at site and office such as:
the approvals of shop drawings, material submittals, IR, payment certificates, construction schedule. Preparing the monthly progress reports; attending the progress and technical meetings; issue the handing over certificates, approving the closing out document.

Projects Manager (construction supervision) à DAR AL-OMRAN CONSULTANTS
  • Arabie Saoudite - Riyad
  • juin 2005 à juillet 2007

During this period I have supervised the construction of three New Model Branches for Arab National Bank in Dammam, Al-Khobar & Boraida.

Below is a brief description of Arab National Bank-Dammam Corniche Project:

The main building consists of two floors. The main elements of the project can be summarized as follows:

1. Internal Elements
Branch Elements:
- 24 Hours Zone (ATM Units).
- Customer Service Representative (CSR) (Greeter Station, Assistant Branch Manager Office, CSR Locations & Equipment Room).
- Cash Area (Tellers, Officers, Equipment Room, Safe Deposit Vault, Cash Vault, Clearance Booth & Data Room).
- Queuing and Men’s Banking Hall
- Golden Section (Branch Manager, Meeting Room and Offices)
- Investment Section @ First Floor (VIP Zone, Investment Center, Smoking Room, CSR and Equipment Room).
- Platinum Section @ First Floor (Teller, Officer and Small Meeting Room)
- Tea Rooms & Toilets

Ladies Section Elements @ First Floor
- Cash Area (Branch Manager, Tellers, Chief Teller, Equipment Room & Store)
- Queuing and Banking Hall (CSR Locations, Equipment Room and Waiting Lounge)
- Ladies Investment Center
- Tea Room & Toilets

2. External Elements
Parking Area, Drive up ATM, Pylon Sign, Electrical Room, SCECO Room and Generator Room, Water Tanks (Irrigation, Potable & Fire Fighting), Diesel Tank, Under Ground Pump Room.
The area around the building is landscaped. The building is equipped with central A/C package system, C.C.T.V system, Burglar Alarm System, Fire Alarm System and Fire Fighting System, Queuing System. The facades are of pre-cast panels and the entrances façades are clad in G.R.C panels.

• Site Area is 3150 m2
• Total Buildings Area is 1966 m2

Project Manager (construction supervision Department) à DAR AL-OMRAN CONSULTANTS
  • Arabie Saoudite - Riyad
  • novembre 2003 à juin 2005

I worked in the position of Project Manager for construction supervision of Riyadh Intercontinental Club Wing Renovation Project.

In addition to Riyadh Intercontinental Project, I have studied & analyzed contractors’ tenders for many major projects; and prepared the required evaluation technical reports.


Hereinafter is a brief description of Riyadh Intercontinental Hotel Project:

The works include refurbishment, renovation and maintenance of club wing of Riyadh Intercontinental Hotel, including civil works, finishes, decoration, furniture, electrical works, mechanical works including refurbishment of Air-Conditioning system, plumbing and low voltage systems.

The refurbished and renovated area includes:
1. 05 Royal suites
2. 09 Presidential suites
3. 01 Conversion of existing club lounge to presidential suite (156)
4. 09 Twin guestrooms
5. 41 King guestrooms
6. 06 Business rooms
7. All Guestrooms corridors (05 floors; 1st, 2nd, 3rd, 4th, 5th floor)
8. All guest elevator lobbies (05 levels)
9. Guest elevator cabins (03 cabins)
10. Club lounge at 6th level (New concept)
11. Link Bridge at first floor level between main lobby and club wing.
12. Garden entrance lobby
13. Club wing breakfast lounge

PROJECTS MANAGER AND COORDINATOR à ESSAM PROJECTS AND CONTRACTING Co.
  • Arabie Saoudite - Riyad
  • janvier 1996 à janvier 2003

Tasks and Duties:

• Projects study and pricing during bidding stage.

• Studying the project documents before bidding (Project Drawings, Specifications, Bill Of Quantities, General and Special Conditions of the Contract).

• Structural designs review.

• Preparation of construction schedule for project before execution; follow up work performance at the site; comparing achieved work(s) with target works; studying deviations causes from proposed construction schedule, if any; and setting up appropriate remedial solutions.

• Sites visits and follow up quality and cost control.

• Representing the company in periodical meetings with the consultant (s) and owner, periodical meeting with site Engineers, with their different specialties with a view to set up and coordinate with them construction schedule.

• Discussion of quotations and price list with sub-contractors and suppliers to finalize contracting procedures.

• Follow up and review of material submittals and shop drawings submittals.

• Monthly payment certificates follow up and review.

• Revision and follow up shop drawings, as built drawings, and operation and maintenance manuals.


Here are a list of the projects I managed during this period:

• SARA Vision Regional Office Building Project - Dammam.

• SARA Vision Regional Office Building Project - Jeddah.


• Engineering Information System Building project, at RSAF-HQ- Riyadh.

• Warehouse and Administration Building at Prince Sultan Air Base Project, at Al Kharj.

CONSTRUCTION SUPERVISION MANAGER à KATTAN CONSULT
  • Arabie Saoudite - Riyad
  • janvier 1988 à juillet 1995

I participated in construction supervision of all projects the office supervised and, at the level of responsible leadership. I also participated in meetings at the level of presidency of execution supervision in the head office in Riyadh. Moreover, I participated in some design projects designed by the office. Here is a summary of the projects I participated in:

* Construction Supervision of General Housing Project in Makkah with a cost of SR. 1, 664, 000, 000 (Only one billion and six hundred and sixty four million Saudi Riyals).

* Project of designing Medical College and University Educational Center, Malaz in Riyadh (with a cost of almost SR. 57 millions).

* Project of designing and supervision of execution of two branches for the National Commercial Bank in Riyadh (al-Rouda branch, and Ghobeira branch).

* Managing Construction of a private housing palace with a total cost of SR. 15 millions in Riyadh.

* Preparing consulting reports for Saudi-Cairo Bank in the field of evaluating work progress for many major construction projects funded by the bank, and working out technical recommendations to remedy problems and disadvantages facing execution of the project. Of these projects are constructing training centers and schools with a total cost of SR.186 millions, and E2-Bisha Road project with a total cost of SR. 243 millions.

* Study and pricing many projects. Of these projects is Petromin Housing Project (Luberef-ll- Yanbu) with approximate total cost of SR. 300 millions.

PROJECT MANAGER à KATTAN CONSULT
  • Arabie Saoudite - Riyad
  • juillet 1986 à décembre 1987

construction supervision of the National Commercial Bank in the Diplomatic Quarter (Drive-in Bank) My position was a "Project Manager". Hereinafter is a description of the project:

The building consists of a basement and two floors with an area of 1200 m2 for a single floor. The project area is almost 6000 m2. The ground floor includes (9) counters for cashiers, a main vault and a safe deposit room, bank hall and a group of luxuriously finished offices - suspended false ceiling; Marble floors, painting and wooden and metal doors. It also has toilets, tea rooms and the guard's room.

The first floor is a group of offices for employees, toilets and telex and telephone room. The basement contains a car park equipped with automatic control gate barrier system at the entrance and exit. It also has electricity room, the guard's room; and equipped with pumps room and sump pit to drain underground or washing water.

The area around the building is provided with drive-in stalls and outstanding banking services. In minutes, and while still inside his car, the customer can finish all his banking dealings through four automatic drive-in customer units equipped with screens, microphones and loud speakers and cameras through which a customer can talk and see cashiers inside and finish his bank dealing in minutes, then goes out in his car from the bank's exit.

Also, the area around the building is landscaped and all works of irrigation system equipped with computerized irrigation controllers. The areas around the building are also provided with a car park with fiber glass louvers and steel beams shed. The building is also equipped with central air-conditioning package system, C.C.T.V. monitoring systems, fire and security alarm systems. Outer facades are clad in marble and painted plaster (machine sprayed texture paint).

PROJECT MANAGER à KATTAN CONSULT
  • Arabie Saoudite - Dammam
  • avril 1983 à juin 1986

Supervising the Construction of the National Commercial Bank building and AL-Danah Shopping Mall in Dammam. My position was "Project Manager". Hereinafter is a brief description of the project:
In this project the dewatering system was used by means of well points system. Shoring of excavation sides was executed by piling steel I-beams (size 30x30 cm and 12 m. length /depth), and fixing wooden ribs between the steel beams. Lowering the ground water level (dewatering) by using the system was continued during the period of executing the foundation until casting the basement roof slab. It is worth mentioning here that the underground water level was 1.0 M deep, and the excavation was 5.0 m deep.

The National Commercial Bank building consists of a ground floor and four upper floors in addition to services basement. The area of the floor is almost 1100 sq. m. The ground floor includes the bank hall equipped with thirteen counters for tellers, a main safe and a computer room. The basement has (2) vaults one of them for safe deposits boxes. It also has services rooms which are: water tanks and fire water tank room, electricity room, central water heaters room and the car park.

The building is equipped with automatic C.C.T.V. monitoring systems and chilled water air condition system. It is also equipped with two elevators for customers and employees. All the building floors are finished luxuriously- suspended ceilings, marble floors, marble walls, Painted gypsum plaster and the outer facades of the building is clad in marble. The building was handed over on 12/1/1985.

Al Danah Shopping Mall consists of two floors and a basement with an overall area of twenty-one thousand square meters. The ground and first floor contain 69 commercial shops with luxurious finishing in addition to the public areas, offices and toilets. The building has two escalators as well as a lift for goods. The basement is a car park with a total capacity of 250 cars. This car park is equipped with automatic control systems. The basement also includes water tanks room, and an electricity room with a stand-by power generator. The building is equipped with central air-conditioning using chilled water system. It is also equipped with fire alarm and fire fighting systems as well as C.C.T.V. monitoring system. The main front façade is clad in luxurious Italian marble and the back façade plastered and machine-sprayed textured paint. The public areas are finished by false ceiling of aluminum strips and the floors are finished with marble and quarry tiles. Shop windows are clad in Italian luxurious marble 3 cm thick and have aluminum show windows and doors. The project was handed over 1st July 1986 and its cost is almost SR. 100 millions.

project manager à kattan consult
  • Arabie Saoudite
  • avril 1981 à mars 1983

. During this period, I supervised the construction of Al-Artaweia New Clinic Project (Client: Ministry of Health) - as a Project Manager. The project was a Health/Medical Center Building containing examination rooms, operations room, delivery room, a pharmacy, a dentist's room, reception halls and registration offices etc. The project included a housing building for families and another for singles, car garage, transformer's room in addition to their necessary facilities and external utilities.

SITE ENGINEER à MOHAMMED SALEH AL-LAHEEB EST.
  • Arabie Saoudite - Riyad
  • février 1980 à avril 1981

During this period, I executed residential multi-storey buildings as well as offices and exhibitions buildings including all kinds of luxurious finishing.

Designer/site Engineer à R.M. SALAM CONSULTING ENGINEERS OFFICE
  • Egypte - Alexandrie
  • mai 1978 à février 1980

Worked with Consulting Engineers Office, Proprietor Consultant Engineer Rifaat Sallam (Alexandria, Egypt) as a supervisor engineer for executing major industrial projects in Kafr El-Dawaar (expansion project of the Fourth Spinning and Weaving Unit in Kafr El-Dawwar factories and Spaghi AL-Baidaa Expansion Project).

In the project of the fourth Spinning and Weaving unit in Kafr El-Dawaar Factories, I supervised the execution of foundation and huge/big reinforced concrete works. In this project, foundation were executed by using piles of Fibro company, then pile caps were cast and, above them, concrete columns. The main concrete frame was arch rib with a tie. It consists of two spans each of it is 23m. length. These supporting frames are repeated at equal distances. The project also had flat slabs suspended on hangers.

Designer/site Engineer à R.M. SALAM CONSULTING ENGINEERS OFFICE
  • Egypte - Alexandrie
  • janvier 1975 à janvier 1978

Worked with Consulting Engineers Office, Proprietor Consultant Engineer Rifaat Sallam (Alexandria, Egypt) in the field of design and supervision of executing multi-story buildings and industrial structures.

Éducation

Baccalauréat, Bachelor of Civil Engineering from Faculty of Engineering, Alexandria University- Egypt .
  • à ENGINEERING
  • novembre 1974

Bachelor of Civil Engineering from Faculty of Engineering, Alexandria University- Egypt in 1974(The Graduation project was reinforced concrete structure). Certified Consultant Engineer in Engineers Syndicate, Arab Republic of Egypt in the field Of Civil Projects Management under No. 1809/1. Certified Construction Management Consultant in Saudi Council Of Engineers under No.20368. Engineering Syndicate membership No.2798/3 (Civil Engineering Branch) in Egypt. Certified Arbitrator (Class A) in the Arbitration Chamber of the Regional Center of the Federation of Engineering Institutions Of Islamic Countries, under number "66".

Specialties & Skills

Bidding
Arbitration
Design Review
Planning
Construction Supervision
PLANNING AND SCHEDULING BY USING " PRIMAVERA"

Langues

Arabe
Langue Maternelle
Anglais
Expert

Loisirs

  • SWIMMING & READING