Construction manager
ORASCOM for constructions
مجموع سنوات الخبرة :32 years, 6 أشهر
., MECHANICAL AND INSTRUMENTS) WITH ( INITEC ENERGIA )COM.IN GIZA NORTH
POWER PLANT 2250 MWATT COMBINED CYCLE P.P.
IM WORKING IN THIS SITE FROM JAN 2013 TILL DECEMBER 2014
IM RESPONSIPLE FOR INSTALLATION OF ELECTRIC SYSTEMS AND CABLES AND INSTRUMENTATIONS AS WELL
I PREPARE ALL THE SYSTEMS FOR COMMISSIONNING AND START UP
CHECK AND SUPERVISE ALL THE CABLES TERMINATION SCHEDULES WITH ALL PANELS
I FOLLOW UP CALIBRATION OF ALL INSTRUMENTS BEFORE INSTALLATIN AND PREPARE FOR START UP.
CHECK ALL ALLIGINMENT ALL THE PUMPS AND ROTAION GOOD AND NO VIBRATION AS WELL
PUT ALL THE SYSTEMS IN SERVICE MECHANICALY AND ELECTRICALLY WITH GOOD PERFORMANCE
Electrical engineer for construction and commissioning with
With (INTEC ENERGIA com.)in el tebbine thermal power plant. 350 M WATT
THE BOILER WAS ANSALDO 1200 TON /HR AND THE TURBINE WAS SEIMENCE 350 M WATT
I worked as an construction&COMMISSIONING electrical engineer with (initec energia)
My responsibilities were
Erecting of power transformers and erecting of gas insulated bus bars
for power plant and utility (COMMISSIONING FOR ELECTRIC, MECHANICAL &INSTRUMENT)
with
With
MECHANICAL. AND ELECTRICALLY)
With
MECHANICAL AND ELECTRICAL)
With
The Sanitary and Drainage of Great Cairo Authority.
Responsibilities:
Maintenance of electrical panels of pumps to 3150V.
Maintenance of vacuum circuit breaker up to 11 KV rating also 3150V.
Maintenance of LV and MV motors.
Maintenance of LV and MV transformers.
Protection measuring device maintenance and calibration.
Maintenance of movable generators from 50 KW - 75 KW up to 160 KW, also 850 KW like Rolls Royce, Caterpiller nibbon, etc
Achieve weekly and monthly work schedule including:
Cable extension, cable tray installation and conduit pipes.
Testing relays and cables.
the hydrolic power plant in upper Egypt with
shoubra power plant
Review all the drawings and the electric documents and also the contracte items for the contractors participate in the construction of the power plant it was a
Thermal Power Plant 4 X 350 MW, Natural Gas. Gas Turbine unit 1 X 45 MW FIAT
Ansaldo Co.in, Damanhour
Thermal Power Plant 1 X 350 MW, Natural Gas and Mazout Fired Boiler.
Responsibilities:
Preparation for start-up and operation of all units.
Coordination with Network Control Center for load adjustment, voltage and power factor, including increases and decreases in loads.
Operation of Gas Turbine during continuous operation.
Performance of mechanical and electrical routine maintenance on site.
shoubra El Khaima power plant its a
Thermal Power Plant 4 X 350 MW, Natural Gas and Mazout Fired Boiler.
El Khaima, Shoubra
Thermal Power Plant 4 X 350 MW, Natural Gas and Mazout Fired Boiler.
Responsibilities:
Preparation for start-up and operation of all units.
Coordination with Network Control Center for load adjustment, voltage and power factor, including increases and decreases in loads.
Operation of Gas Turbine during continuous operation.
Performance of mechanical and electrical routine maintenance on site.
in Damanhour.
Combined Power Plant, one module, one turbine, 1 X 85 MW Steam T.B. and four Gas Turbines 4 X 25 MW.
Responsibilities:
Preparation for start-up and operation of all units.
Coordination with Network Control Center for load adjustment, voltage and power factor, including increases and decreases in loads.
Operation of Gas Turbine during continuous operation.
Performance of mechanical and electrical routine maintenance on site.
Operation of demineralized water plant.
mechanical, elect. And instrument) with TECHINT CO . in power plant in damittah in north Egypt this power p. is combined cycle 1200 m watt FROM JUNE 2017 TILL NOW THERE ARE 4 GAS TURBINES EACH 250 M WATT AND STEAM TURBINE 250 M WATT SIEMENCE AS WELL
Installation of electric panels
Supervision for cable pulling (power, instrument cables)
Loop check for all cables
Installation of all kinds of cable trays & conduit pipes and check the termination of all medium &low voltage cable with the panels
FOR COMMISSIONING
Responsible for start up all systems
Review &check all mechanical &electrical circuits
Prepare work permits for subcontractors
Operation or all systems after finish commissioning
Prepare maintenance programs for the equipment's
Alignment for axial pumps and axial flow and centrifugal pumps
Make flushing for all the piping and lines and blow out before
Check and maintain all the pumps greasing , good rotation and good vibration
Check with construction people the hydro test for all the lines with the acceptable pressure
SUPERVISION THE OIL FLUSHING FOR THE STEAM TURBINE (SIEMENCE S.T. 250 M WATT )
SUPERVISE TURNNING GEAR OPERATION AND THEN ROLLING AND SPEED RISE TILL 3000 RPM AND SYNCHRONIZING AND CHECK OVERALL THE TURBINE BEARING TEM. AND VIBRATION AND ABNORMAL NOISE ETCC.
Construction &commissioning leader (mechanical, elect, &instruments ) in OHL INDUSTRIAL in AMMAN in Jordan in a project for storage the petroleum products
My responsibility is to start up the m. voltage breakers of switchgear and M.CCS and AC UPS and the batteries and check loop check and all D.C.S . Signals
PREPARE FOR ALL THE LINES AND FLUSHING AND PREPARE FOR START THE PUMPS AND CHECH THE PERFORMANCE AFTER WORKING