Site Engineer in
“Giza North Power Planet 1500MW Combined Cycle Power Project”
Responsibilities:
1. Installing and Maintenance of Construction Power System which consist from:
a. 2 feeder 11 KV to Switch Gear
b. 1 Switch Gear
c. 5 Transformer 11kv/380v (oil trafo)
d. 14 Distribution panels Lv
2. Installing Lighting System, Power System, Fire Alarm System, Paging System, Data show and sound System, Data Network System, HVAC System and PABX System In the following buildings:
Construction Building
Office Building
Lube oil storage area
HRSG of the 6 units
Gasoline station
Control Building
Electrical Building
Warehouse Building
Work shop Building
Pump House Building
Guard dormitory Building
Fire station Building
Main security office
3. Duct Bank in whole Project.
4. Grounding and Lightning Systems in whole Project.
5. Travelling water screens and trash rack control systems.
6. All underground embedded conduits.
Maintenance of all machines (Elec)
• Maintenance of machines
• Supervision on quality of product
• Supervision on production quantity
• Supervision on all employees