george farag, SECTION ENGINEER

george farag

SECTION ENGINEER

ALJABER GROUP

Lieu
Émirats Arabes Unis - Abu Dhabi
Éducation
Baccalauréat, Civil Engineering
Expérience
9 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :9 years, 8 Mois

SECTION ENGINEER à ALJABER GROUP
  • Émirats Arabes Unis - Abu Dhabi
  • janvier 2011 à février 2017

• Project: Maintenance for Western Area Zone 3 From 1 January 2011 - Till now:
Client: DOT. Consultant: Mouchel.
In this project I am responsible of Maintenance for the Western Area Roads including The infrastructures works such as: Asphalt damaged layers, Fixing guard rail, Rope rail, Protection of existing utilities, road crossing ducts, New Sewerage and Storm water networks, Fixing signboard, Road marking and New spillways.

SECTION ENGINEER à ALJABER GROUP
  • Émirats Arabes Unis - Abu Dhabi
  • mai 2010 à janvier 2011

• Project: Infrastructure For Emirati Housing Community Phase1 From 20 May 2010 to 1 January 2011:
Client: Royal Group. Consultant: Professional Arabian Consulting Engineers.
In that project I was responsible for sewerage and storm water networks including: Excavation and laying pipe line including fixing manholes, Arrange the equipment for back filling the pipe line layer by layer, Doing all test for sewerage pipe line ( Water test, Air test, Deflection test), revising design shop drawings for approvals and calculating the required quantities on site.

Senior Site Engineer à at ALJABER GROUP
  • Émirats Arabes Unis - Abu Dhabi
  • juin 2008 à mai 2010

• Project: Construction of Internal roads Al Shamkha area Stage 3 From 18 June 2008 to 20 May 2010:
Position: Senior Site Engineer. Client: Abu Dhabi Municipality. Consultant: HYDER Consulting Middle East.
In that Project I was responsible for ( Storm water and irrigation) pipe line including Fixing manholes, Street light pole foundations, Road layers with protecting for all utilities, Future crossing ducts, Road marking, Traffic Signals. My duties also included overseeing the work on site, ensuring that it is carried out in accordance to the specifications and overcoming any obstacles encountered on site.

Site Engineer à Al_Shrouk Company
  • Egypte - Assiout
  • août 2007 à juin 2008

★ 25 August 2007 - 18 June 2008 Site Engineer Al_Shrouk Company.

Client: Government of Egypt. Consultant: Hospital engineers.
Working as Site Engineer for Maintenance & Repair for El Qasr El Eny hospital building (Egypt)
I was responsible for Finishing works (Fixing Marble on walls and Floors, Tiles, Plaster, Painting, Fixing fake
Ceiling, Bricks walls), Reparation for reinforced (ceiling, columns and beams), calculating the quantity of materials needed, preparing the daily, weekly and Monthly Reports and interim payments.

Site Engineer (Trainee) à Al Mokawlon El Arab Company
  • Egypte
  • juillet 2007 à août 2007

★ 25 July 2007 - 25 August 2007 Site Engineer (Trainee) Al Mokawlon El Arab Company.

I worked as Road Site Engineer with Al Mokawlon El Arab Company at Cairo - Hurghada Highway Within this role; I built a high degree of relationship and communication skills with colleagues and various departments, Working in a pressurized environment, I built excellent prioritization and teamwork skills Hence I was offered the position.

Éducation

Baccalauréat, Civil Engineering
  • à Asyut University of Engineering
  • juin 2007

• Asyut University of Engineering 2002-2007 B.Sc. Civil Engineering with Overall Degree (good) Project Type: Foundation with special difficulties with degree (Excellent) • The Graduation Project: Preparing a Full design for Building & mosque with Analyzing for the Soil. • Studying a wide variety of hands-on modules such as surveying engineering lab, Pavement design lab • Materials of Construction lab, Soil mechanics lab, Fluid & Hydraulics lab, Geology lab. Memberships and and achievements

Specialties & Skills

Civil Works
Infrastructure Projects
Drainage
AutoCAD 2006 2D
International computer Driving License (Icdl)
Community First Aid
earth , asphalt , infrastructure , pipe line works
FINISHING
IRRIGATION
MAINTENANCE
MANHOLES
Basic Fire Fighting

Langues

Arabe
Expert
Anglais
Moyen

Adhésions

of Egyptian Engineers Association (E.E.A)
  • Member
  • August 2007

Formation et Diplômes

Training for Engineering projects Management (Certificat)
Date de la formation:
February 2006
Valide jusqu'à:
February 2006
AutoCAD 2006 2D (Certificat)
Date de la formation:
July 2006
Valide jusqu'à:
July 2006
International computer Driving License (Icdl) (Certificat)
Date de la formation:
May 2008
Valide jusqu'à:
May 2008