مجموع سنوات الخبرة :16 years, 7 أشهر

Lead Planning Engineer في Dutco Balfour Beatty
  • الإمارات العربية المتحدة
  • أشغل هذه الوظيفة منذ أغسطس 2015

Contracts Management, Planning and scheduling, clains management. specializing in forensic planning. working across 4 divisions.

TUNNEL ENGINEER في IMPREGILO S.P.A
  • الإمارات العربية المتحدة - أبو ظبي
  • يناير 2012 إلى أغسطس 2014

Strategic Tunneling Enhancement Program (STEP)
• Deep Sewer Tunnel :
It consists of 5 launching shafts and 5 access shafts and 25 km of total tunneling by 5 EPBs of dia. 6.35m.

• Responsibilities as Tunnel Field Engineer: Execution of all tunneling works with TBM. Checking and Updating the material stock and consumption. Coordinating with other departments (electric and mechanical). Preparation of look ahead schedules and daily reports. Preparing crack mapping in segments. Responsible for Grouting in Tunnel.
Responsible for implementation of safety in tunnels. Guiding TBM operator to drive within specified parameter. Responsible for Cutter head intervention.
Preparing daily weekly and monthly telemetry reports for issuing. Checking and ordering material, maintaining stock of all the tunnel consumables, for production and services. Checking the segments for defects in segment yard. Planning and assigning work to shift supervisors, assisting project management in executing decisions on site. Assisting the planning department with ready data from site and monitoring targets.
Checking the operation of CPL shutters, casting vault 5 m dia, with embedded geo-membrane, in line with the design parameters, of tolerances and clearances, keeping track of and handling material, ordering all the consumables for the permanent works, responsible for Safety and technical supervision.

Achievements: Hold the record for maximum production in a shift, in a day, in a week and in a month. Breaking all previous records of production.

Promoted to office as a Tunnel Engineer for over all co-ordination of the project.
Responsible for all the co-ordination work for planning for Corrosion protection concrete lining. For execution and material supply and planning.
Monitoring 3 sites from surface, and troubleshooting their query.

PLANNING ENGINEER في STRABAG
  • الهند
  • يوليو 2010 إلى ديسمبر 2011

• Rohtang Pass Highway Tunnel Project:
It is an 8.8 Kms long worth Rs 1500 crore Highway Tunnel Project that connects Dhundi to Sissu bypassing Rohtang Pass. The Project is executed by NATM (New Austrian Tunneling Method, ) D&B.
• Responsibilities as Planning Engineer: Preparation of L1, L2, L3 & L4 baseline schedules in co-ordination with the project’s staff including timeframes, resources, equipments, submittals, cost loading and budgeting.
• Preparation of updated programmes and mitigation programmes.
• Incorporating FIDIC contract in the programme, and programming techniques as and when required.
• Conducting site visits on a regular basis and acquiring the necessary data required for projected progress and work scheduled completion.
• Performing weekly fortnightly and monthly updates to follow up the progress and implement preventive / corrective as and required.
• Analyze project resources and leveling according to availability and concentrated area.
• Responsible for recording and monitoring project costs including raising invoices, agreeing variations in scope of services and monitoring third party costs.
• Continuous monitoring costs as planned vs as budgeted vs as incurred.
• Providing feed back to project managers in case of projected over - or under run in disbursements. In comparison of project budgets and plans.
• Providing continuous onsite support to onsite staff and clarifying details pertaining to the work plan.
• Earned Value Analysis / EOT Claims/ Time Impact Analysis as Planned Vs as Built Analysis /Preparation of Variations in light of FIDIC contract.
• Ability to steer and control the project till the handover phase.
Assisting the project team in the inspection and commissioning of each of the respective elements of the project to ensure compliance with the contract.

PLANNING ENGINEER في MSK PROJECTS (I) LTD
  • الهند
  • أكتوبر 2009 إلى يوليو 2010

• EPCC-12A “Construction of Non- Plant Buildings-Naphtha Cracker Plant Panipat” : Responsible for Project Tracking, Preparation of daily weekly and monthly programs for Engineering, Procurement and construction, Site co-ordination, inter-department co-ordination, co-ordination with contractors and vendors, attending meetings with the client and PMC, Resource Planning, Preparation of Presentations, generation of Daily progress reports, Weekly Progress Reports & Monthly Progress reports.
• Additional responsibility: Estimation and BOQ, BBS, Reconciliation of cement, steel, shuttering, formwork and various consumables. Generation of Running bills for supply, services, excise, VAT etc. Quality control.
• Execution of various buildings, from setting out of works to completion, concreting, piping works etc
• EPCC-15 “ Construction of Polishing Pond-Naphtha Cracker Plant Panipat” : Responsible for Project Tracking, Preparation of daily weekly and monthly programs for Engineering, Procurement and construction, Site co-ordination, inter-department co-ordination, co-ordination with contractors and vendors, attending meetings with the client and PMC, Resource Planning, Preparation of Presentations, generation of Daily progress reports, Weekly Progress Reports & Monthly Progress reports. Clients/Parties involved:
• Indian Oil (Client)
• Engineers India Limited (PMC)

CIVIL ENGINEER في Lahmeyer International India, Gurgaon, Haryana
  • الهند - دلهي
  • يوليو 2008 إلى أكتوبر 2009

• Project 3 x 250 Mw SARIR GTPP Libya: Responsible for detailed engineering (designing and preparation of various deliverables) for multiple structures and co-ordination with client as well as with different departments of the firm.

• Project 2000 Mw Sabiya Power Project Kuwait:
Responsible for proposal engineering and estimation of man hours for the entire project. Preparation of Overall Project schedule and update it on Primavera. Additionally responsible for preparing presentations for meeting with client.
Project 2 x 660 Mw TPP Adani Power Limited Phase III:
Responsible for review of deliverables & co-ordination both with the client as well as inter-department. I was also responsible for assigning various tasks to my team and project progress tracking. Preparing presentations for the client.

• Project 3 x 660 Mw TPP Adani Power Limited Phase IV:
Same as above
• 1 x 63 Mw TPP IndBharath Power Genco. Tutticorin:
Responsible for construction monitoring of the project facilitating the bank to plan their various draw-down schedules and tracking project on Lender’s behalf. Preparation of various S curves and there analysis Clients/Parties involved:
• Ministry of Electricity, Govt. of Libya (Client)
• Hyundai Corporation(Contractor)
• ASESCo (Consultant)



Clients/Parties involved :
• Ministry of Electricity & Water,
Govt. of Kuwait (Client)
• Siemens(Contractor)
• Al-Ghanim (Sub-contractor)

Clients/Parties involved :
• Adani Power Limited (Client)
• SEPCO III (Contractor)
• Paharpur (Cooling towers subcontractor)
• Simplex (Chimney)


Clients/Parties involved :
• Adani Power Limited (Client)
• SEPCO III (Contractor)
• Paharpur (Cooling towers subcontractor)
• DCPL (Chimney)

Clients/Parties involved :
• Ind-Bharath Power Genco. (Client)
• Greenosol (Contractors)
• Lenders ( UKO Bank)

JR. ENGINEER في Nirmanotech Consulting Services
  • الهند - دلهي
  • ديسمبر 2003 إلى يوليو 2005

Maintenance and renovation of concrete pavement for a functioning oil gantry for Bharat Petroleum Corporation Ltd. located at Banthra Village Shajahanpur (UP)

Key Responsibilities:
• Preparing logistics charts for active tankers using the gantry are while under maintenance.
• Quality Control
• Construction Monitoring &Supervision
• Preparation of Daily & Monthly Progress Reports for different statistics
• Estimation of Quantities and Preparation of BOQs
• Construction of canteen building for the truck drivers.
• Work forecasting
• Work place and Fire safety
• Survey of Bowser Gantry for Indian Air Force Base Sirsa (Haryana) using theodolite as a survey aid.
• Preparation of Isometrics and Piping Layout for the Airplane Filling Gantry including Plans Elevations and Sections.

Analysis and Design for an Apartment complex Constructed at Abul Fazal Enclave.

الخلفية التعليمية

بكالوريوس, CIVIL ENGINEERING
  • في JAMIA MILLIA ISLAMIA
  • أبريل 2008

Projects and Seminars Specialized Courses Project: “Seismic analysis of a G+14 Multistoried structure with Shear walls” • Major Project in the final year of Engineering. Project: Construction and finishing of a G+4 shopping at Aligarh • Industrial training for a period of 4 weeks w.e. f [24/05/2007 to 28/06/2007] under the division ALIGARH BUILDERS. • Active participation in seminars and conferences (GEOTECHNICAL ASPECTS OF EARTHQUAKE ENGINEERING 2007), which were organized at college/ Institutional/ Inter-institutional and national level. Computing in Civil Engineering (Finite Element and AutoCad-2007) Lead jointly by Fachhochschule Erfurt University of Applied Sciences and Jamia Millia Islamia University (Faculty of Engineering and Technology). • Introduction into Basics of Finite Element Method • Truss and Beam Elements: Equilibrium Equations, Constitutive Equations, Interpolation Functions, Stiffness Matrix, Load Vector. • Assembly: Boundary Conditions, Band Width, Skyline, Redundancy • Secondary Analysis: Beam forces, Support forces, sub matrices. • Application: Steel Structures • Introduction into the 3 dimension computer aided design (3-D) • Certificate Awarded jointly from: FACHHOCHSCHULE ERFURT University of Applied Sciences, Bauingenieurwesen and Faculty of Engineering and Technology Jamia Millia Islamia. Awards and Scholarships • Attended a workshop on AIDS organized by N.S.S. • Participated in INTER FACULTY CRICKET TOURNAMENT and got good reviews. • Attended camp on GREEN ENVIRONMENT organized by N.S.S. • Certificate of Recognition as Editor in the editorial board of the faculty magazine “TECH TIMES” of Engineering Department.

Specialties & Skills

Microsoft Office
Primavera P6
MS Project
AutoCAD
Ms Visio
CONSTRUCTION CO-ORDINATION
MS OFFICE
CONSTRUCTION SUPERVISION
PRIMAVERA
MS PROJECTS
PLANNING
Forensic Planning

اللغات

الانجليزية
متمرّس
الهندية
متمرّس
الالمانية
مبتدئ
الأوردو
متوسط

الهوايات

  • Basketball, Music (Playing Guitars)
    Played basketball for school and collage teams and competed in inter university tournaments. Played guitar with backing vocals at several gigs