GHULAM NABI,  Electrical Engineer

GHULAM NABI

Electrical Engineer

First Gulf .co

Lieu
Arabie Saoudite
Éducation
Baccalauréat, Electrical/Electronic
Expérience
11 years, 0 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :11 years, 0 Mois

Electrical Engineer à First Gulf .co
  • Arabie Saoudite - Jizan
  • Je travaille ici depuis septembre 2022

Responsible for managing the projects for Installation, Testing, and Commissioning of LV panel board, LV MEDS
switch gears, MV Transformers, and ATS switches.
 Attend the project close-out meeting and be able to plan work well, organize, and be prepared for responsibility
and decision-making.
 Guided team members in resolving critical technical issues aimed at seamless implementation of the project
phases. Prepared and presented various status reports to senior management to enable effective decision-making.
 Identified and estimated the required tools and special PPEs for installations. Ensured compliance with various
HSE parameters of lifting MEDS panels and Transformers.
 Installation of MV, LV Switchgear, Distribution Board, and Capacitor Bank.
 Installation of VFD (Variable Frequency Drives).
 Construction and installation of 132KV TO 13.8KV & 6.6 KV Manholes and duct banks and substation equipment.
 LV & I& C cable tray and lighting system installation.
 Grounding and earthing protection work.
 AC to DC & DC to AC Backup power supply system installation.
 Underground HDPE, PVC, and SUBDUCT conduits installation.
 Installation of SOCK PITS, HAND HOLE & FOUNDATIONS

Electrical Engineer à NGMSA.CO
  • Arabie Saoudite - AlKharj
  • juin 2022 à août 2022

Project Engineering Planning and controlling projects from the conceptual phase to commissioning, including
managing scope changes, and identifying and resolving project problems.
 Responsible for execution of assigned projects from proposal to project closing. Responsible for ensuring that the
package for submittal to the client meets all client requirements.
 Responsible for timely completion of the assigned jobs and maintaining the project schedule. Coordinating with
Vendors / Clients to resolve quality and Construction Issues. Tracking and recording of RFI and work progress on
Site. Drive discipline best practices and standards.
 Updated project-related drawings, standards, documents, reports, etc. planned site activities related to the
baseline schedule
 Finalized material take-off of the project and obtained client approvals on project materials. Procured materials
from approved manufacturers through approved suppliers
 Involved in the identification and estimation of the required tools and special PPEs for installations
 Worked with HSE to ensure the availability of all JSA, MOS, etc. related to the scope of installation
 Participated in progress review/technical/coordination meetings, and interacted with the client for approval on
drawings and materials
 Maintained proper laydown/storage areas for all the materials including chemicals based on manufacturer
recommendation. Worked on the preparation of Site Technical Queries and redlines.
 FEC, (field equipment cabinet )VA camera, PTZ camera, Fixed camera, ANPR camera, Dome camera & RADAR
installation around the security fence and security building gate house areas.
 Erection of Road Blocker, Arm Barrier, Crash Beam, Turnstile, and loop sensing system at entrance and exit areas.
 Installation of Intrusion Detection System, Corner Sensor, Transmitters TX & Receiver RX across the fence.
 Installation of Sunshade CAM, Turnstile CAM & Dom CAM.

Electrical Engineer à Sepco Arabia.co (Power China)
  • Arabie Saoudite - Jizan
  • janvier 2021 à août 2022

Handled underground electrical cable installation services of 66KV, 230V medium voltage/low voltage), street
light cable, and existing cable protection with split duct below carriageway
 Monitored underground services like electrical cables (MV/LV), and telecommunication cables.
 Worked on electrical installation activities as per project planning schedule Updated redline drawings as per
required site executions.
 Observed HSE standards throughout the project execution
 Led the pre-commissioning and commissioning activities, prepared the procedure for installation testing &
commissioning including cable laying, marking, and termination
 Installation, loop checking, and function test of ACCU, AHU, CFU, BF, MD, PDT, TT, MT/TT, TH,
 MFSD, PDS, FD, etc.
 Testing of HVAC Super-heat Sub cooling system.
 Installation, loop check, and function test of MCP, MSP, LCP, and DSW for power & control system.
 Motors installation, its SOLO RUN test without load and with loads.
 Pre-commissioning and commissioning of complete HVAC system.
 Preparation of red line drawing for modification of the instrument's location.
 Inspection of devices and coordination with clients, vendors, and quality departments.
 Installation of cables, underground cable laying activity, installation of duct bank and precast duck bank installation,
cables test, cable glands, and their termination, installation of JB’s and terminals box.
 Panels phenolic tagging, ferrule, and location marking.
 Installation of welding receptacles in outdoor areas.
 MCC cable installation testing and inspection.
 Installation of devices and loop checking.
 Installation of instruments rack and panel.

E&I Engineer à Sepco Arabia .Co (Power China)
  • Arabie Saoudite - Jizan
  • juillet 2019 à décembre 2021

Reviewed design drawings and monitored the schedule and quality of materials and Electrical equipment
 Analyzed project SLD, Building DBs all power and control drawings
 Worked with various tests like CT testing, Energy Meter testing, Relay testing, Insulation resistance @ 1kV, Ducter
test, Torque test, Hi-Pot test 2kV Dielectric test, etc. Implemented Trip Test of Cassette Type Breaker, MCCB,
and MCB according to manufacturer trip time.
 Determined cable routing, design & sizing of the underground cabling duct banks/manholes for MV/LV & Control
cables, together with the stub-ups and installation details
 Worked on the installation of Lighting Control Panels and Manual Transfer Switches Maintained records,
inventory of materials.
 Checked existing electrical systems to explore energy-saving opportunities and suggested solutions for the safest
operation & long life of electrical equipment
 Executed the electrical installations as per contract scope, IFC drawings, specifications, and BOQ of the project.
Obtained approvals on shop drawings from clients.
 Installation of instruments rack and panel.
 Monitoring daily instrument installation and testing activities and verifying that it complies with the project
specification.
 Redlining the drawings, Termination schedules, Instrument Loop Diagram (ILD), Datasheets, etc., as per the
modifications made on-site.
 Worked with DCS and performed loop checking as well as new loop connection troubleshooting from field to field via
DCS.
 Inspection and testing of loops from field instrument to control room DCS signal working as per database checked the
alarms conditions and stroke checked for the MOV control valves.

E&I Engineer à Project Build Company.co (PBC)
  • Arabie Saoudite - Yanbu
  • avril 2017 à février 2019

Review Project drawings and apply Contract Codes, Standards, and specifications.
 Responsible for the inspection of the installation of Instruments, Conduits, and fittings (above and below ground),
Cable trays/ladder racks perforated and trunk type of tray Cables, Junction Boxes, Control Panels, Consoles,
wiring termination, and impulse tubing as per the project specification.
 Electrical/Instrumentation construction program inspection.
 Preparing daily documentation of the work progress
 Inspection of Low voltage cables, their type wiring and voltage rating, meggering and continuity test of cables.
 Monitoring the pre-installation of equipment trench preparation for foundation, Backfilling, Compaction & FDT test
of the layers.

Electrical Engineer (Shutdown ) à Tamimi Global.co
  • Arabie Saoudite - Yanbu
  • avril 2017 à mai 2017

Speed test of motors against the different AC frequency levels.
 Involved in FAT inspection of LV, and MV cables testing as per the standards of MESC &SAUDI cables.
 Testing of UL13, UL-2250, IEC60502-1, IEC60331, UL2250& SES X08-SO1 instruments, power, and
communication cables.
 Monitoring of instrument performance, and troubleshooting existing devices to ensure that effective repairs &
installation.
 Confirming that the Calibration of the instruments matches the specifications in the Instrument Data Sheet.
 Review of P & ID, Instrument Specification Sheet (ISS), Instrument Data Sheet (IDS), Instrument Installation
Sheet (IIS), Wiring Diagram, Tubing Hook up.
 Inspection and testing of loops from field instrument to control room DCS signal working as per database
checked the alarms conditions and stroke checked for the MOV control valves

E&I Engineer à SEPAM.CO
  • Arabie Saoudite - Yanbu
  • juin 2015 à mars 2017

Installation of combustible gas and Hydrogen Sulfide Air Detection system installation, calibration, and testing.
 Testing and installation of Fire Alarms, Beacon lamps, Sounder, LED, Manual Pull Stations, Heat Detectors, flame-able Gas Detector devices, and their JB and panels.
 Installation of CAT, MI, Fiber Optics, and communication cables.
 Testing of UL13, UL-2250, IEC60502-1, IEC60331, UL2250& SES X08-SO1 instruments, power, and
communication cables
 Coordination of monthly Safety meetings including setting agenda, taking minutes, tracking follow-ups

Electrical Associate Engineer à Ministry Of Science & Technology
  • Pakistan - Islamabad
  • octobre 2009 à janvier 2012

Internship Program, National Institue Of Electronics.

Éducation

Baccalauréat, Electrical/Electronic
  • à Sarhad University Of Science And Information Technology
  • octobre 2013

Specialties & Skills

Presentation Skills
Site Planning
Team Leadership
Recruitment
Multisim
CONTROL PANELS
INSTALLATION
INSTRUMENTATION
AGENDA (MEETING)
CLOSING (SALES)
COMMISSIONING
CONSTRUCTION
DATASHEETS
MANAGEMENT
TORQUE (PHYSICS)

Profils Sociaux

Site Web Personnel
Site Web Personnel

Le lien a été supprimé pour non-respect des conditions d'utilisation. Veuillez contacter l’équipe d'assistance pour plus d'informations.

Langues

Anglais
Expert
Hindi
Expert
Urdu
Expert

Formation et Diplômes

Driving License (Certificat)
Date de la formation:
August 2017
Valide jusqu'à:
March 2032
Life Saving Rules (Formation)
Institut de formation:
HSE Dept.
Durée:
2 heures
First Aid Training (Formation)
Institut de formation:
SCFHS institute
Date de la formation:
July 2022
Durée:
4 heures

Loisirs

  • Talk shows & Global awareness