Projects:
A. A. Rano Nigeria Limited (EPC) - $36, 556, 932.56:
Construction of 20, 000m3/2, 000tons Per Year Lubricant Oil/Grease Blending Plants
NNPC - Nigerian Gas Company (NGC) SODA Projects (EPC) - $49, 961, 714.46:
EPC Rehabilitation/upgrade of Sapele Gas Metering Station (Seflam SGL)
EPC Rehabilitation/upgrade of Oben Gas Metering Station (GC Parsons International)
EPC Rehabilitation/upgrade of Delta IV Gas Metering Station (Bablink Resources)
EPC Rehabilitation/upgrade of Ajaokuta Gas Metering Station (Morpol Engineering)
Major Achievements:
 Assembled a team of engineers for the completion of the Projects.
 Initiated the use of PMI for material identification of piping/vessels for the calculation of remaining service life and saved over $8M for NNPC.
 Provided basis for reduction/close-out of Contractors' Variations costs and saved over $4M for NNPC.
 Ensured prompt resolution of issues/challenges with strong attention to the Projects Schedule.
 Mobilised all four contractors to the Site for Site construction activities and supervised Site activities concurrently.
 Successful Phase 1 Shutdown and Start-up of all four Gas Stations as planned on schedule and zero LTI.
Responsibilities:
 Sourced a team of competent and experienced project management, Design, Construction, and Commissioning Engineers and the management/supervision of the Projects activities concurrently.
 Reviewed and approved the contractors' EPC MDRs, Schedules, and PMS.
 Ensured provision of a robust Interface Management between NNPC stakeholders and the EPC Contractors With their Vendors/OEMs/Subcontractors.
 Provided a detailed Projects-specific Work Breakdown Structure, identifying all elements of work activities with corresponding weightings that translate to progress percentages, which formed the basis for PMS for milestones completion Invoicing.
 Reviewed/approved EPC Contractors’ Project schedules and work programs and advised NNPC on any schedule variance, including mitigating actions.
 Reviewed/approved the Master Document Register and Deliverable Release Schedule of the EPC Contractors and prepare an overall Project Schedule for monitoring of the Projects to hand over.
 Reviewed/approved EPC Contractors’ deliverables, including but not limited to calculations, drawings, specifications, equipment register, material take-offs (MTOs), datasheets, Vendor queries, As-built drawings, operation and maintenance manuals, and spare parts list, to ensure alignment to specification and standards.
 Coordinated successful HAZOP, HAZID, and SIL Constructability Review workshops for all EPC contractors’ projects.
 Reviewed and tracked EPC Contractors’ procurement activities.
 Ensured the coordination of Short-down and Construction readiness workshops for all EPC contractors’ projects.
 Verification and validation of work done by EPC Contractors and approval of submitted invoices with recommendations to NNPC.
 Preparation and submission of PMC weekly and monthly reports to NNPC and review of the weekly and monthly reports of the EPC Contractors’.
 Identification, assessment, and management of project risk throughout the project life cycle including maintenance of a Risk Register along with mitigation plans and development of contingency plans.
 Supervision/approval of EPC Contractors’ construction, pre-commissioning, and commissioning activities to ensure compliance with the specified standards according to the EPC Contract Agreements.
 Provision of overall supervision of the various EPC Contractors’ Project teams in coordination with NNPC.
 Development of lessons learned on the Projects.
 Training of NNPC personnel in relevant project management courses.
 Preparations of SODA Projects close-out and hand-over reports.

Project Engineering Manager في GCA Energy
  • نيجيريا - Lagos
  • سبتمبر 2017 إلى فبراير 2019

Projects:
Construction/Installation of Gantry and JIB Cranes - SPDC Bonny Terminal ($655, 737.71)
Dynamic Main Production Umbilicals and SIV/RIMS Umbilical Pigtail Hook-up - Egina FPSO (N150M)
Emergency Lifeboat Upgrade and commissioning - EA Sea Eagle FPSO (N194, 035.46)
Fiscal Oil Metering System Modifications/Recertification Campaign - Akpo FPSO ($38, 150)
S35 Compact Prover refurbish and upgrade in Aberdeen - IKM Aberdeen ($62, 434)
Achievements:
 Prepared and implemented project budgets and ensured close monitoring of the project’s finances and contractual relationships.
 Conducted feasibility studies of client requests to estimate project materials, schedule, labour costs, and risks into tenders/bids for successful delivery.
 Ensured that project progress status is accurately reported and controlled within budget.
 Reviewed projects design requirements/plans and led the engineering, construction, installation, and commissioning activities.
 Prepared negotiated & analysed costs for tenders and contract work packages and identified contractual issues while valuing completed work for payments.
 Discussed project specifications/requirements with clients/stakeholders, developed project cost estimates, schedules, and SOW, and ensured that the project team understands the tasks to be carried out clearly.
 Prepared specifications, methods statements, and detailed work procedures for project execution activities, and ensured that the safety of personnel and assets are adequately considered.
 Managed project site execution activities and ensured compliance to Design Specifications, HSE, and adequate reporting for escalation/corrective actions.
 Managed engineering resources/interfaces and achieved successful delivery of the projects.
 Provided Technical support for Fabrication activities and prepared erection/construction sequence/method statement.
 Ensured that only technical documents approved by Clients are available for Fabrication and Construction.
 Supported business development unit on project opportunities for technical and commercial close-out.
 Ensured schedule of engineering is linked to procurement and fabrication activities for supply.
 Coordinated the preparation of technical/commercial Bid packages and negotiated contract terms with clients and set up new partnerships for EPC projects bids and execution.
 Developed, deployed, and implemented plans that ensured the best utilisation of assets as well as supervised and gave guidance on the maintenance of all assets.
 Managed the development and maintenance of engineering staff competence training on professional grounds.
 Compiled the overall engineering deliverable list and ensured that engineering design personnel understood the projects' scopes and their tasks.
 Managed change order processes and attended the projects' technical meetings with clients.
 Developed lessons learned for the projects' best practices that promoted continuous improvement, safety, integrity, compliance with project requirements, and reduced risks.

Engineering Manager في Energia Nigeria
  • نيجيريا - Lagos
  • أغسطس 2015 إلى سبتمبر 2017

Projects: (Kwale Flow Station - Onshore)
Installation and commissioning of 12inch x 52km export pipeline from Umusadege Injection Hub to Eriemu SPDC Trans-Forcados pipeline.
Installation of eroded section of 6inch x 8.5km export line from Ebendo flow station to Umusadege Injection Hub.
Procurement, construction, installation, and commissioning of flow lines from production Wells to gathering manifold with its associated fitting and valves.
Procurement, Installation, and Commissioning of 750kva gas generator.
Construction of 30, 000bbl tank with ancillary structures, piping, and pipelines.
Engineering, procurement, construction, installation, and commissioning of Fire hydrant Piping/Pipeline system expansion with associated valves/pumps/head stations.
Work-over preparation activities and commissioning of Wells 4, 6, 8 & 9 flow lines.
Replacement of Crude oil export pump on 12inch export pipeline.
Procurement, Installation, and commissioning of MCC Feeder Cables.
Engineering Upgrade/Reliability Studies of the Flow station to 20, 000bopd.
Detailed Engineering Design of Topping Plant (Modular Refinery).
Procurement, Installation, and commissioning of 20kva Inverter batteries.
Construction of flow station Warehouse and emergency exit Staircase.
Upgrade of flow station metering system for crude oil and gas production.
Procurement of Material Spares for the Flow Station & G.G.F.
Construction of Car Park at Kwale Flow Station.
Fabrication and installation of Flow station Production Chemical Storage Shades.
Construction and Fencing of Ebendo North Location Access Road.
Achievements:
 Effectively managed Contracts and Contractors to ensure compliance with projects' standards/specifications and accomplishment of the objectives of the projects.
 Managed cost planning and commercial management of projects throughout the entire life cycle of projects.
 Prepared contracts, including details regarding quantities of required materials and ongoing cost analysis of maintenance and repair works.
 Assessed and projected future works, allocated works to contractors, and analysed completed works for payment approvals.
 Ensured the development and implementation of an effective flow station preventive maintenance program.
 Developed Assets Integrity Monitoring Scheme and Risk and Reliability Based Inspection Strategy for Pipeline Integrity Management.
 Conducted pipeline integrity of 6inch export line selected for the investigation.
 Proactively planned for unpredictable scenarios (backup plans in place); anticipates future challenges and engaged legal and risk management departments as required.
 Developed/reviewed SOW/procedures, and project execution plans in line with relevant specifications and industry codes for effective job safety analysis.
 Developed Project work budget with estimate and scope and managed cash flow on a weekly/monthly basis with Accounting Staff.
 Supervised Field Engineers on-site and reviewed Daily Job Report (DJR) to ensure that POS, WBS codes, material usage, Tasks completed/forecasts activities, and challenges are being accurately recorded.
 Ensured monthly reviews, updates, and analysis of spare parts stock to optimise maximum cover at minimum cost to the company.
 Lead commissioning activities to safety, and quality, within schedule and budget.
 Developed and maintained healthy relationships with JV partners, stakeholders, and contractors.
 Carried out assets integrity investigations on changes and modifications to piping/pipeline systems for flow station upgrade to improve production.
 Implemented Safety and Quality Control System as a priority.
 Carried out a review and effectiveness of approved safety procedures in reducing hazards on the flow station.
 Liaised with flow station base manager and his crew to follow up on reported challenges, proposed solutions, and execution for closeout.
 Trained project management team on the use of project Tracking Tools.

Senior Project Engineer في Worleyparsons - Nigeria
  • نيجيريا - Lagos
  • أكتوبر 2013 إلى يونيو 2015

Projects:
Egina FPSO Detailed Engineering Design - Offshore Forcados
Yokri Integrated Project (FYIP 2) Detailed Engineering Design - Offshore
Achievements:
 Enhanced project performance by managing operational efficiencies, schedule management, project plans, and required documentation.
 Managed and coordinated multidiscipline engineering activities to ensure projects are executed in a safe, efficient, cost-effective, and timely manner.
 Managed and coordinated HAZOP and what-if review sessions, documented comments, and ensured implementation by lead discipline engineers.
 Coordinated requirements gathering sessions with discipline leads to clearly define/document project requirements and deliverables plans.
 Conducted Bid clarification meetings for vendors and provided answers to RFQs.
 Prepared project documents and weekly project status reports and supported project management phases - planning, execution, and monitoring.
 Prepared briefing materials for bi-weekly project review engagement meetings, which aided leadership with high-level decisions to ensure successful implementation of project execution plans.
 Interfaced with Process and Piping leads to resolution of issues and ensured application of legislation and standards across deliverables.
 Collaborated with project managers to define, implement, and enforce WorleyParsons project governance and project management processes.
 Assisted in the management of project financials such as invoice tracking, forecasting, and project budgets vs. actual expenses.
 Managed the interface of topsides (piping) with modules and packages.
 Provided technical approval of all Process/Piping Work pack deliverables and report progress against project plans, escalating areas of concern and identifying corrective actions.
 Identified appropriate resource requirements for Work pack engineering in accordance with agreed project plans.
 Performed project engineering functions involving monitoring of deliverables progress, preparation of Project Management documents, documentation of communications and meetings, and identification/evaluation of project issues.
 Provided technical, ethical, professional leadership, support, and mentoring to project colleagues.
 Identified and evaluated issues/events that may affect project quality, scope, cost, or schedule.
 Mentored staff trainees and ensured they have the right training, learning environment, and competencies required in their choice of discipline based on NCMB policy.

Project Engineer في Shell Petroleum Development Company
  • نيجيريا - Lagos
  • نوفمبر 2012 إلى أكتوبر 2013

Project:
Forcados Yokri Integrated Project (FYIP 1) Pipeline - Onshore
Forcados Yokri Integrated Project (FYIP 2) Pipeline - Offshore
Achievements:
 Coordinated preparation of reports, calculations, drawings, and other technical documents to ensure accuracy, completeness, and applicability to the project requirements and compatibility with the equipment to be utilised on the projects.
 Carried out Pipes integrity verification by visual.
 Prepared Engineering Requests, and Technical Queries, tracked and recorded all Technical queries, actions, deviations, variations, and key decisions made during each phase of the project, and ensured they were implemented following due process within the agreed decision space.
 Developed and coordinated Platform hook-up and installation work pack plans and activities.
 Reviewed and revised the project phase-2 SOW, Technical/Commercial tender bid packages, and participated in the evaluation of the bids.
 Liaised with SPDC engineering and Subcontractors to ensure timely delivery of reports, calculations, drawings, and other required technical documents for the project.
 Coordinated requirements gathering and Risk assessment review sessions with discipline leads to clearly define and document project requirements and risk mitigation plans.
 Provided technical liaison to contractors and supervised incorporation of comments into technical deliverables as required.
 Coordinated HAZOP/PDMS review sessions and managed design change orders while interpreting details from Isometric drawings, GAs P&IDs, and Pipe Support drawings during execution.
 Ensured errors and discrepancies in drawings and specifications are reported and resolved when discovered.
 Coordinated the development of quality plans, ITPs, and other quality-related documents with the QA/QC department.
 Monitored and ensured compliance to DEP specifications with project technical drawings, documents, and procedures.
 Supervised and coordinated activities of Field Engineers providing offshore support to construction personnel on the equipment spread.
 Organized meetings and managed vendors to ensure that deliveries meet agreed project requirements.
 Prepared project documents and status reports, and supported project management phases - planning, execution, and result monitoring.
 Reviewed pipeline alignment sheets, demolition/modification drawings, and approved Redline drawings.
 Created and managed the project plans and schedules, and monitored project activities, progress, and milestones.
 Managed the project interface team with joint venture partners between other SPDC project activities and those of the Contractors.
 Ensured that recommendations from the reports of Environmental Impact Assessment, operational quality, safety, and environmental systems are implemented.

Project/Pre-commissioning Engineer في West African Ventures - Sea Truck Group
  • نيجيريا - Lagos
  • مايو 2010 إلى أكتوبر 2012

Projects:
Escravos Gas Phase 3A (EGP 3A Phase II) Pipeline Project. - Offshore
Escravos Gas Phase 3A (EGP 3A) Pipeline Project. - Offshore
Achievements:
 Prepared the project SOW, Technical and Commercial ITT packages and evaluated the Bid package submissions from subcontractors.
 Coordinated and supervised all Pre-commissioning activities (Flooding, Cleaning, Flushing, Gauging, Dewatering, Drying, Swapping, and Packing) of subsea spool piece between the pipeline and the PLEM, the UFR, and flow lines to the CALM buoy.
 Assisted in the Development of installation procedures for offshore pipelay and subsea construction activities.
 Developed the Pipeline Integrity Monitoring Scheme (Inspection intervals) and coordinated Platform hook-up and installation work pack plans and activities.
 Coordinated and supervised the coating of line pipes and coated pipes load-out from Intels, Onne to the work site.
 Acted as point of contact for CNL/subcontractor site representatives for resolution of issues.
 Developed equipment foot-print deck plans for pipelaying vessel preparation and mobilisation.
 Ensured technical and commercial issues are resolved and that execution complies with all client and standard statutory requirements.
 Assisted in the preparation of the Equipment list to be procured/rented for the project and controlled all project pre-commissioning materials.
 Coordinated and carried-out pre-commissioning activities of the pipeline and its risers.
 Prepared project scope of work for operational procedures and subcontractors' ITT packages.
 Lead teams of engineers and subcontractor engineers and reported project daily progress to the project manager and construction manager.
 Managed projects’ interfaces with other projects and facilities and liaised with operations personnel to ensure that requirements are met.
 Implemented recommendations from Environmental Impact Assessment report and ensured that operational quality, safety, and environmental systems are implemented.
 Coordinated bid clarifications meetings with bidders, answered RFQs/TQs, approve waivers and resolve issues as they arise.
 Carry out all activities associated with the construction and pre-commissioning of the facilities (e.g., preparation of construction drawing/documents, site construction, and installation, hook-up, pre-startup audits, as-built drawings).
 Evaluated subcontractors’ technical and commercial bid packages and selected preferred bidder for subcontract award.
 Prepared Project close-out and lessons learned reports.

Project Engineer في Field Offshore Design Engineering
  • نيجيريا - Lagos
  • يونيو 2005 إلى أبريل 2010

Projects:
 Commissioning of Hydro cyclone Desanders at SPDC Olomoroh-Oleh, Kokori, and Ogini flow stations. - Feb. 2010. (Project Engr.)
 Installation/Commissioning of Ebocha 10” Bi-directional Prover Loop/4-way diverter valve Project for Addax petroleum at Ebocha field Oil Centre - Oct. 2009 (Project Engineer).
 Escravos 10 Ton Incinerator (EIP) DED project for CNL. - May 2009 (Senior. Piping/Pipeline Engr.).
 Escravos Tank Vent Management (TVM) FEED Project for CNL - Feb. 2009 (Senior. Piping Engr.).
 Escravos Integrated Pipeline Corridor (IPC) DED Project for CNL - Sept. 2008 (Int. Pipeline Engr.).
 Turbine meter and Prover Loop calibration services of ESSO West London, ESSO Heathrow, and ESSO Birmingham Terminals - June 2008. (Metering Engineer). - Onshore
 Prover Loop calibration services of Bonga FPSO for SNEPCO - Jan. 2008. (Metering Tech.).
 Calibration of Erha FPSO Non-Custody Transfer Packages and Prover Loop for ExxonMobil - June 2007 (Metering Engr.)
 Prover calibration services of Bonga FPSO Vessel for SNEPCO - Jan. 2007. (Metering Tech).
 FEED studies of Escravos Export system (EESP) Project for CNL - Nov 2006. (Int. Piping Engr.).
 FEED studies of EGP3B for CNL - May. 2006. (Int. Piping Engr.).
 FEED studies of FPSO BOSI Project for EEPNL - Oct. (Piping Engr.).

Safety Engineer في Oil Industrial Services
  • نيجيريا - Lagos
  • يناير 2004 إلى مايو 2005

Projects:
 Corrosion Prevention/Painting Project CTNL OKAN Production Platforms at Okan Field. - Deep Offshore
 Chevron Texaco Nigeria Limited Robert Kiri Production Platform (Offshore) Corrosion Prevention/Painting Project.
 Corrosion Prevention/Painting Project of OKAN PPF for CTNL - May 2005 (Safety Engineer)
 Corrosion Prevention/Painting Project of Robert Kiri PPF for CTNL - Jan. 2005 (Safety Engineer) Prevention/Painting Project CTNL OKAN Production Platforms at Okan Field. - Deep Offshore

الخلفية التعليمية

ماجستير, Process Engineering
  • في University Of Lagos
  • ديسمبر 2017

Specialties & Skills

Construction Engineering
Engineering Design
Site Engineering
Project Management
Cost Engineering
Oral and written communications skills
Professionalism and strong work ethic
Critical thinking and problem solving
Leadership
Staying positive and aiming high
Self-management
Teamwork and collaboration
Computer
Marketing
Microsoft Office
Project management

اللغات

الانجليزية
متمرّس