Govind singh, Asst Manager- Risk services (Electrical)

Govind singh

Asst Manager- Risk services (Electrical)

Cholamandalam MS Risk Services Limited

Lieu
Inde - Chennai
Éducation
Baccalauréat, Electrical & Electronics
Expérience
15 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :15 years, 10 Mois

Asst Manager- Risk services (Electrical) à Cholamandalam MS Risk Services Limited
  • Inde - Chennai
  • Je travaille ici depuis mars 2012

To conduct detailed electrical system study on new or existing system to enable client to build or expand their electrical system and help them to achieve improved efficiency, reliability and safety in operation. Secondly implementing the project execution right from Design concept to client handover.

JOB RESPONSIBILITY:

1. Network modeling which includes Field Data collection & Single line diagram generation.
2. Power System analysis which includes short circuit analysis, equipment evaluation, load flow analysis, Protective device coordination, Relay co-ordination and selectivity, Power cable sizing, voltage drop calculation, Transformer sizing and Arc Flash analysis.
3. Cable engineering for above package, which includes cable tray layout, cable routing and Cable Schedule etc
4. To conduct Electrical infrared thermography using FLIR P65 and Fluke Ti32 thermal camera and generation of thermography report with respective software.
5. Responsibility for project implementation at site, which involves coordination with clients and contractors for execution of project with quality and in scheduled time.
6. Knowledge of statutory rules and National / International codes (IEEE 1584-2002, NFPA 70E NFPA 70B, IEC 60909, 61363, Indian standard 1646 and National Building code 2005).
7. Attending weekly site meeting & coordinating work at site.
8. Electrical Engineering Software used ETAP Automation and SKM System Analysis 6.5.

Project Engineer à Rajdeep Electrical Pvt Ltd
  • Inde - Delhi
  • mai 2010 à février 2012

Project on Lux Level Improvement include installation of High Mast, Flood Light, Well- Glass Light, Lighting Pole, Motors & LT panels with protective device.

Objective: Project from inception through to project completion and client handover.

JOB RESPONSIBILITY.
1. Responsible for preparing single line drawings, and layouts for wiring and cables.
2. Perform the task of evaluating vendor quotation and preparing list of material required for the project.
3. Responsible for coordinating with project team in handling technical matters and in preparing project cost.
4. Handle the task of inspecting and troubleshooting electrical systems.
5. Perform responsibilities of preparing "as built" drawings under the guidelines of senior project Manager.
6. Co-ordination with M/s IOCL & other sub vendor responsible for Target date work.
7. Receipt of material at the site.
8. Preparation measurement sheet / certificate of material received at site.
9. Responsible for Network planning & Project Development.
10. Entire site execution & etc.

Project Executive in Delaval à A tetra Laval group
  • Inde
  • juillet 2008 à mai 2010

2. Worked as a Project Executive in Delaval (A tetra Laval group) from July 2008 to May 2010. Posted in Haryana. Looking over project as well as commercial client within Haryana & Punjab.

JOB RESPONSIBILITY
➢ Managing the complete range of project activities right from conceptualization, resource mobilization and manpower deployment.
➢ Planning and scheduling various site activities to ensure completion of the project within the time and budgetary parameters and for optimizing resource utilization. Creating and expansion sites.
➢ Practicing quality standards, identifying areas of quality failures with key emphasis on improving quality by taking necessary action to rectify the system.

Éducation

Baccalauréat, Electrical & Electronics
  • à Sikkim Manipal Institute of Technology
  • janvier 2007

❖ B.Tech (Electrical & Electronics) from Sikkim Manipal Institute of Technology, Majhitar, Rangpo, Sikkim (S.M.I.T) (2007), Percentage: 64.13%.

Etudes secondaires ou équivalent,
  • à D.A.V Kapildev Public School
  • janvier 2002

❖ Class 12: D.A.V Kapildev Public School, Ranchi, Jharkhand Percentage: 62% in 2002.

Etudes secondaires ou équivalent,
  • à D.A.V Kapildev Public School
  • janvier 2000

❖ Class 10: D.A.V Kapildev Public School, Ranchi, Jharkhand Percentage: 71.2% in 2000

Specialties & Skills

Electrical Engineering
Electrical Maintenance
Design Engineering
Project Engineering
Project Evaluation
ETAP Automation software,SKM Software,Autocad,Electrical Project Management
ELECTRICAL ENGINEERING
ELECTRICAL SYSTEMS
ENGINEER
ENGINEERING DESIGN
LIGHTING
MAINTENANCE

Langues

Hindi
Expert
Anglais
Moyen