Guillermo Marcondes Zambrano, Project Architect

Guillermo Marcondes Zambrano

Project Architect

Arab Engineering Bureau

البلد
قطر
التعليم
ماجستير, Master in Design
الخبرات
7 years, 0 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :7 years, 0 أشهر

Project Architect في Arab Engineering Bureau
  • قطر - الدوحة
  • فبراير 2015 إلى أغسطس 2016

Projects :
- VVIP Luxury Villa in the Pearl Qatar

- New Port Project Of Qatar

- VVIP Beach Palace of His Highness, Sheikh Jassim Bin Hamad Al Thani

- Sidra village staff housing at Qatar Foundation.

- Club 61 at Kempinsky Hotel Qatar

- VVIP Privet Museum of Cars

Accomplishments:

• Evaluated subcontractors proposal value in accordance to project's budget and commercial

demand for: Elevators, ID subcontractors, swimming pools, landscape and hard cape.

• Draft of weekly and monthly reports to be presented to the client.

• Coordinated technical meetings between contractor and consultant.

• Coordinated technical meetings between contractor/subcontractors and designer.

• Assisted in the daily project management coordination tasks such as review of inspections and project coordination.

• Reviewed all project correspondence and drafted action proposals to be evaluated and answered by the project manager, such as project delays and actions to be taken/ways to reduce it, contractors and subcontractors appointing and contract awarding, material value engineering for the project.

• Reviewed of contractor’s progress of work and prepare actions to be taken from the

consultant side and evaluated by the project manager.

• Coordinator of a cross disciplinary team of Civil, Structural, Mechanical and Electrical

engineers to solve queries raised on site.

• Assist the Project Manager preparing weekly and monthly reports to notify the client on the

progress of work.

• Coordinate site progress meetings and technical meetings between contractors, consultant

and design team, and addressing relevant issues on site.

• Fit out coordinator for the high end finishing of the project.

• Review material submittals, shop drawings of all the architectural components of the project.

• Fit out coordinator for all the interior and exterior architectural finishes of the project

• Project architect for the 1200+ apartment units built for the Staff of Sidra hospital.

Site Architect inspector في KEO international consultants
  • قطر - الدوحة
  • ديسمبر 2010 إلى ديسمبر 2012

Projects:

 Hamad International Airport Qatar: VVIP Emiri Terminal, Passenger terminal, control

tower, substations, control rooms, Hotel, mosque, car parks

• Responsible for managing an array of activities including handling site team of architects, engineers and technicians to install fire sealants in the mechanical and architectural fire protection elements in line with UL systems and engineering judgments Installed in the VVIP Emir Terminal building, Mosque and Main Passengers terminal.

• Attend fire door testing of Hamad International Airport as a consultant and reporting the results to the client and contractor.

• As a site architect designed technical solutions to solve complex construction cases of fire sealant installation in the Emiri terminal, Mosque and Car park.

Architect في PAD Studio
  • كولومبيا
  • أغسطس 2007 إلى نوفمبر 2010

• Assisted the project manager with coordination tasks such as site inspections and liaising with the national Authorities
• Assumed the role as architect inspector for the projects that were being developed by the company.
• Worked as Assistant Project Development for new business acquisition and new clients.
• Assisted with the design consultancy for third party projects in partnership with other companies.
• Designed, Developed and implemented Virtual Driver Reports on completion of work of all changes made on the
• image of Ecopetrol, the biggest oil company in Colombia.
• Worked as Assistant Architectural Designer for different retail, housing and office spaces projects.
Specialists’ Clinic of Amazon, Jun 2007 - Aug 2007 / Jun 2008 - Aug 2008
Managed all activities as Architect inspector for the 2000 m2 construction site in compliance with Colombian codes of hospital and IBC.

•Worked as inspector of the foundations and the finishings of the project in accordance to the clients requirements the Colombian hospital codes and NFPA 101.

• Instrumental in identifying and managing new clients to the Studio, implementing new research projects and ran these with little to no senior supervision.

Architectural Designer Assistant. في EMBT enric miralles & Benedetta Tagliabue
  • أسبانيا
  • يوليو 2009 إلى ديسمبر 2009

• Worked extensively as Virtual Site Architect Assistant and completed the construction works in the pavilion including structural painting, architectural finishes and wicker panel installations.
• Collaboratively worked as Solutions Assistant Architectural Designer of the cables and connectors for 8000+ wicker panels that shaped the project’s façade attached to the metallic structure.
• Successfully managed all the activities as Solutions Assistant Designer of the pavilion’s doors requiring airplane system for it’s weight and design.
• Instrumental in identifying and managing new clients to the Studio, implementing new research projects and ran these with little to no senior supervision.

الخلفية التعليمية

ماجستير, Master in Design
  • في NABA Nuova Accademia di Belle Arti Milano
  • يوليو 2014

Candidate for MFA in Design with specialization in industrial design at the renown School of arts and design NABA in Milan

دبلوم, Specialization in Marketing Strategies
  • في Istituto Europeo di Design
  • يونيو 2013
بكالوريوس, Architect
  • في Pontifical Xaverian University
  • يونيو 2010

Specialties & Skills

Architectural Design
Product Design
Interior Design
Creative Work
Urban Design
Photoshop
Ilustrator
Autocad 2d & 3d

اللغات

الاسبانية
متمرّس
البرتغالية
متمرّس
الانجليزية
متمرّس
الفرنسية
متوسط
الايطالية
متمرّس
العربية
مبتدئ

الهوايات

  • Photography, Languages and traveling.