construction assurance Engineer
Louisberger
Total years of experience :22 years, 0 Months
Inspection and Approval of Pile and pier casting, segment casting and Segment Erection, PT and Bearing works, and Station and At Grade Structural work
Inspection Report making and Documentation work
January 2007 To septembr 2015
Employer: M/S, VSL INDIA PVT LTD
Designation: Assistant Gantry Manager.
Project Project Details & Responsibilities
Supervision of stressing using VSL
ZPE460/31 Multi Jack,
Bangalore Hosur Elevated Supervision of grouting using VSL Twin
highway project Drum Grout pump
Management of Labors - including daily
supervision, work allocation and
performance review. Preparation of
stressing calculation, Reports & Daily
working schedule.
Pre casting yard PT Profiling & Checking
January2004 To December 2006.
Hwaseung Auto parts India pvt ltd
Sriperumbudur, Chennai.
Designation: Maintenance Engineer.
Project Projects Details & Responsibilities
Car Leather product Hydraulic press machine
Hydraulic cutting machine and etc
All machine Maintenance
Total 13 years (08 Years in Segmental Bridges)
January 2008 - Till date
Employer: VSL India PVT. LTD
Designation: Senior Engineer.
Projects Projects Details & Responsibilities
Working as a site shift In- charge, taking
Bakthiyarpur And Tajpur Ganga care of gantry erection, mould erection,
River Project. segment casting,
(NAVAYUGA)
(Precast segmental erection with Bridge length is 5.5 km, 2 carriage way, 45
Launching gantry) spans, 125 span lengths, max segment
weight 160T, balance cantilever method with gantry
Projects Projects Details & Responsibilities
Working as a site shift In- charge, taking
Devanalli Hebbal Elevated care of gantry erection, span erection, and
Expressway Project. PT works.
(NAVAYUGA) Authorized permit holder & Responsible for (Precast segmental erection with gantry Launching work
Launching gantry) Whole bridge is being constructed using two
115 m long Launching gantries, long main
truss equipped with chine drive launching
system comprising of UCB, LCB, ULRS, SLB,
CB & Hydraulic system
Projects Projects Details & Responsibilities
Working as a site shift In- charge, taking
care of gantry assembly, erection, span
Chennai Metro Rail Project. erection, and PT works.
(SOMA) Authorized permit holder & Responsible for (Precast segmental erection with gantry Launching work
Launching gantry) Whole bridge is being constructed using
two Launching gantries of 87.6m long main
truss equipped with Hydraulic jack launching
system comprising of UCB, LCB, ULRS, SLB,
CB & Hydraulic system.
Total segment being erected 1368
Projects Projects Details & Responsibilities
Shift In- charge, taking care of all gantry
activities, responsible for Launching works.
Whole bridge is constructed with 1 no of
Vizag Vessel Project Having experience of preparation of QA/QC
(India's first nuclear submarine documents.
project) Dimensional inspection works.
May 2002 To December2003.
Sri Vengateswara Spare parts.
Chennai.
Maintenance & Quality Engineer.
Project Projects Details & Responsibilities
Maruthi-800 bearing bush production
Car Spare parts Production Turnning, Milling, Drilling Machine,
maintenance and Quality checking
Bangalore- Nelamangala launching gantry of 96m long main truss
Elevated Highway project. equipped with chain drive launching system
(NAVAYUGA) comprising of UCB, LCB, ULRS, SLB, CB & Hydraulic system.
(Precast segmental erection work with Launching gantry.) Achieved 28hour Erection cycle for 28m
span, 36hours for 37.5m span
Casting yard were under operation for
casting of around 1484 segments (Max
segment wt. 92T)
Project Projects Details & Responsibilities
Approximately 9.6Km length 4 lane viaduct
is constructed using precast segmental
technique with Quarter to Quarter 8 span
continue construction method..
Bangalore Hosur Elevated
highway project Whole bridge is constructed with 3 nos.
launching gantries having 88m long main
(Precast segmental erection work truss equipped with chain Drive launching with Launching gantry.) system comprising of UCB, LCB, ULRS, SLB,
CB & Hydraulic system.
Total 3 nos. of casting yards were in function for casting of around 3000 segments (Max
segment wt. 92T) for consortium of SOMA,
NCC, MAYTAS.
January 2007 To December 2007
Employer: M/S, KSK Engineers
(Under VSL India pvt ltd)
Designation: Trainee Engineer.
Project Project Details & Responsibilities
Supervision of stressing using VSL
ZPE460/31 Multi Jack,
Bangalore Hosur Elevated Supervision of grouting using VSL Twin
highway project Drum Grout pump
Management of Labors - including daily
supervision, work allocation and
performance review. Preparation of
stressing calculation, Reports & Daily
working schedule.
Pre casting yard PT Profiling & Checking
January2004 To December 2006.
Hwaseung Auto parts India pvt ltd
Sriperumbudur, Chennai.
Designation: Maintenance Engineer.
Project Projects Details & Responsibilities
Car Leather product Hydraulic press machine
Hydraulic cutting machine and etc
All machine Maintenance
January 2003 to November 2004
Employer: L&T ECC division
Work under Aditya Engg Works
Position: QC Inspector.
Projects Projects Details & Responsibilities
Name Of The Academic Year % of Class Institute or Month Mark Kumaran Diploma In polytechnic First class Mechanical collage 2000-2002 79.4% with honours Engineer (DME) Tiruvannamalai Govt. Hr Sec
HSC (+2) School. 1999-2000 Second class 52.9% Mallavadi ADDITIONAL QUALIFICATION: Windows 98, MS office 2000, ACADR14 INDUSTRY TRAINING AND PROFESSIONAL DEVELOPMENT: FIRST AID Training Program Risk Assessment Training Program Chennai Metro Rail Project Chennai Metro Rail Project Devanalli Hebbal Elevated Expressway Project. Bangalore- Nelamangala Elevated Highway project Bakthiyarpur And Tajpur Ganga River Project Bangalore Hosur Elevated highway project