Jacobs Zate
مجموع سنوات الخبرة :13 years, 10 أشهر
Participate internal development meeting Participate with department
safety meeting.
Relevant Project Experience
New redundant pipeline from JNGLF to JNGLF Sea
Island process design to be installed in units R91 (Offshore facilities), R92
(Tankage) & R93 (Onshore facilities) for the Enhance LPG Piping
Network Project.
Responsibilities: collecting the required data from the P&ID’s, DBSP
and from site visit, update P&ID’s, prepare PFD, update piping spec,
update line list, check hydraulic line sizing, check Nitrogen calculation and
participate in HAZOP.
BI-10-00742 Ras Tanura Clean Fuels and Toluene, Ras Tanura
Refinery,
Support
Update P&ID’s, back check of material balance, back
check for LDT, and update pump calculation.
Install EIV at DHBP loading area,
Detail design upgrade of closed drain system for
Abqaiq Plants to restrict the release of flammable hydrocarbon liquids
and sour water into sewers and lift stations during normal operation and
turnaround and inspection (T&I) activities.
Responsibilities: collecting the required data from the P&ID’s, DBSP
and from site visit, draw new P&ID’s, update existing P&ID’s, Update LDT
BI-10-00742 Ras Tanura Clean Fuels and Aromatics project
Support Saudi Aramco’s corporate objective by
upgrading the existing Benzene and toluene unit FEED1.
Responsibilities: Benzene and toluene tanks PFD, interconnecting
P&IDs, Tie-in point list, equipment data sheets, LDTs, pump sizing and
Reciprocating compressor sizing verification.
Get new inqueries from client and search with our
suppliers and make a quotation to send for them to get approve to sale.
Client
from
,