Senior engineer
Arab contractors (Osman Ahmed Osman)
مجموع سنوات الخبرة :7 years, 9 أشهر
➢Working at Arab contractors as a senior site engineer at construction of segmental jahraa overpass project-Kuwait since 4/2012 till now
Owner: Ministry of public works state of Kuwait
Consultant: The Louis Berger Group in joint venture with Pan Arab consulting Engineers
Budget: 264 Million Kuwait Dinars
Gained good experience at executing of Pile caps and Piers, erection of segmental bridges, Internal and external post tension prestressing and grouting
Role: • Responsible for daily construction activity of the site, coordinating with Construction Manager, Consultants, subcontractors and all concerned departments
• Responsible for checking the method statements in consultation with Construction Manager and same should approved by Consultant for execution of work.
• Supervise the activities of the Site Engineer/ Foreman/ General Foreman and assist them to perform effectively
• Monitoring progress of work against construction programmers and submission of required site reports in accordance with project reporting plan.
• Monitoring, controlling, and coordinating the works of different trade subcontractors and to report on their progress and delays to Construction Manager
• Responsible for providing full support to the Project Manager with regular feedback of all information relating to project status
➢Worked at Arab contractors (Bridges department) as a senior site engineer at Ameria waste water pumping station (1, 600, 000 m3/day) since 9/2008 to 4/2012
Owner: Ministry of Housing and Utilities (Authority of potable and waste water projects)
Consultant: consultants engineers (Dr.Ahmed Abd El Warith)
Budget: 400 Million pounds
Gained good experience at executing of 60m Diaphragm walls depth for circular shafts with inner diameter 40 m, using chemical plug resisting uplift, using slip form as a one side and double side shuttering
➢Worked at Arab contractors (Bridges department) as a site engineer at EL_Giza vehicle
Tunnel with total length 380 m including 80 m covered Box section since 1/2008 to 8/2008
Owner: Ministry of Housing and Utilities (Greater Cairo development organization)
Consultant: Arab consultants (Moharam_Bakhom)
Budget: 70 Million Pounds
Gained good experience at executing of secant piles as a side supporting system, Deep well dewatering system, Different types of isolation systems, steel fixing and formwork including one side shuttering walls
➢Worked at Arab contractors (Bridges departement) as a site engineer at El_kurimatt power station since 4/2006 to 2/2008
Owner: Ministry of Power and Electricity
Consultant: Pgesco (joint venture of Bechtel and Ministry of Electricity)
Budget: 400 Million Pounds for civil works
Gained good experience at executing of Different types of side supporting systems, dealing with on/off shore mass concrete structures, coordination between civil, electrical and piping works
B.Sc. Civil engineering 2005 Mansoura University - Overall Grade: Good - Graduation Project: Strength of material - Project grade: Excellent - Project Management Professional (PMP) course attendant Field Training ➢Extension of grain berth No (13) Damietta port (Samsung _ Arab contractors J.v) ➢Mansoura University medical center (Arab contractors_ north delta Branch)