• Engaged in the Electrical and Centralized Planning Department.
• Thermography of Electrical Components including the following, MV & LV Motors Bodies, Power Transformer
Bodies, and HT & LT sides Bushings. MV & LV Panels, WHRPP Steam Turbine Generator, Carbon Brushes
Chamber, Preheater Cyclones (C1 to C5) & Smoke Chamber, Kiln Main Body.
• Performed Oil Dielectric Strength (BDV) tests, moisture content analysis to ensure transformer oil quality met
international standards (IEC/IEEE).
• Conducted the Dehydration and filtration process for Transformer Oil to remove moisture and contaminants,
ensuring optimal dielectric performance and prolonging equipment life
• Ensured proper implementation of safety procedures, lock-out/tag-out (LOTO), and use of calibrated test instruments
during all testing activities.
• Assisted in fault diagnosis and root cause analysis (RCA) of abnormal transformer behavior, overheating, and partial
discharge issues.
• Supported field services and commissioning teams in site-based Transformer Inspection including HT side bushing
inspection, earthing verification, and connection validation.
• GIS Grid Station Preventive maintenance through 4S Inspection strategy.
• Condition Monitoring (Vibration Data Collection) of Main Gearboxes and Main MV Motors of LOSCHE / Gebr.
Pfeiffer Vertical Mills, impact/hammer Crusher, Kiln Main drive.
• Air Audit of Compressors Lines, Shock Blasters, and Bag House/Bag Filter compressed air chamber.
• Inspection of the following electrical equipment through a 4S approach: MV & LV panels, MV & LV induction
motors, power transformers, and WHRPP steam turbine generators.
• Measuring the wear of carbon brushes in MV Motors & WHRPP Generators.
• Daily Dashboard Report creation from SAP, including. Tracked and updated daily inventory movements to maintain
real-time stock accuracy.
• Performed cost analysis and product output tracking to support efficient production planning and budgeting.
• Monitored and analyzed fuel costs—including local and imported coal—as well as electricity consumption expenses
to support cost control and budgeting efforts.
• Utilized Power BI to create interactive dashboards for project progress, KPIs, and maintenance reporting.
• Shutdown planning on Primavera P6 and Microsoft Project.
• Developed and maintained baseline schedules using Primavera P6, aligning with project scope and contractual
milestones.
• Generated S-Curve reports for progress tracking, forecasting, and executive reporting.
• Preventive Maintenance plans for mechanical and electrical systems, follow-ups, and execution.
• Data monitoring of renewable energy resources, including an 11.2 MW solar power plant and a 24 MW waste heat
recovery power plant (WHRPP).
- Company industry:
- Industrial Production