Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Hamza Nisar, Electrical Site Engineer

Hamza Nisar

Electrical Site Engineer·Roya Motamiza For Fire Safety Equipment Co

Saudi Arabia

Master's degree, Electrical Engineering

Work experience

Total years of experience: 3 years, 8 months

Electrical Site Engineer

April 2025 - Present

Roya Motamiza For Fire Safety Equipment Co

Riyadh, Saudi Arabia

April 2025 - Present

Working in the Electrical and Fire Safety Systems Maintenance Department, performing routine preventive maintenance, Troubleshooting, and ensuring compliance with safety standards. Performing Preventive Maintenance of the complete Fire Safety System, covering 220 kW motors, 2000 GPM inline Centrifugal pumps, water Piping networks, mechanical valves, Sprinklers, Fire Hose Cabinets, Fire Extinguishers,
FM200 suppression system, Aerosol suppression system, fire Hydrants, and Fire Department Connection (FDC), ensuring operational readiness and compliance with safety standards

Company industry:
Metro & Rail Passenger Transport
Job role:
Engineering

Electrical Engineer

June 2022 - June 2024

Fauji Cement Company Limited

Attock City, Pakistan

June 2022 - June 2024

• Engaged in the Electrical and Centralized Planning Department.
• Thermography of Electrical Components including the following, MV & LV Motors Bodies, Power Transformer
Bodies, and HT & LT sides Bushings. MV & LV Panels, WHRPP Steam Turbine Generator, Carbon Brushes
Chamber, Preheater Cyclones (C1 to C5) & Smoke Chamber, Kiln Main Body.
• Performed Oil Dielectric Strength (BDV) tests, moisture content analysis to ensure transformer oil quality met
international standards (IEC/IEEE).
• Conducted the Dehydration and filtration process for Transformer Oil to remove moisture and contaminants,
ensuring optimal dielectric performance and prolonging equipment life
• Ensured proper implementation of safety procedures, lock-out/tag-out (LOTO), and use of calibrated test instruments
during all testing activities.
• Assisted in fault diagnosis and root cause analysis (RCA) of abnormal transformer behavior, overheating, and partial
discharge issues.
• Supported field services and commissioning teams in site-based Transformer Inspection including HT side bushing
inspection, earthing verification, and connection validation.
• GIS Grid Station Preventive maintenance through 4S Inspection strategy.
• Condition Monitoring (Vibration Data Collection) of Main Gearboxes and Main MV Motors of LOSCHE / Gebr.
Pfeiffer Vertical Mills, impact/hammer Crusher, Kiln Main drive.
• Air Audit of Compressors Lines, Shock Blasters, and Bag House/Bag Filter compressed air chamber.
• Inspection of the following electrical equipment through a 4S approach: MV & LV panels, MV & LV induction
motors, power transformers, and WHRPP steam turbine generators.
• Measuring the wear of carbon brushes in MV Motors & WHRPP Generators.
• Daily Dashboard Report creation from SAP, including. Tracked and updated daily inventory movements to maintain
real-time stock accuracy.
• Performed cost analysis and product output tracking to support efficient production planning and budgeting.
• Monitored and analyzed fuel costs—including local and imported coal—as well as electricity consumption expenses
to support cost control and budgeting efforts.
• Utilized Power BI to create interactive dashboards for project progress, KPIs, and maintenance reporting.
• Shutdown planning on Primavera P6 and Microsoft Project.
• Developed and maintained baseline schedules using Primavera P6, aligning with project scope and contractual
milestones.
• Generated S-Curve reports for progress tracking, forecasting, and executive reporting.
• Preventive Maintenance plans for mechanical and electrical systems, follow-ups, and execution.
• Data monitoring of renewable energy resources, including an 11.2 MW solar power plant and a 24 MW waste heat
recovery power plant (WHRPP).

Company industry:
Industrial Production

Electrical Trainee Engineer

August 2020 - October 2020

ASEA The Technology People

Muzaffarabad, Pakistan

August 2020 - October 2020

• Performs all supervisory duties of the project and able to manage a project work package with minimum supervision.
• Contributed to the successful Installation and Commissioning of a 14.4 MW Hydropower plant as part of a
multidisciplinary team.
• Grid station setup with a 16 MVA, 11/132 kV step-up transformer, 132 kV transmission line, protection
systems, and MV/LV switchgear.
• Participated in the setup and commissioning of a 132 kV AC Double-Circuit Transmission line.
• Assisted in the installation and commissioning of a 14.4 MW Grid Station (132/11 kV)
• Ensure all testing for main panels and Earthling test should be done.
• Supervised the foundation alignment and positioning of an impulse Turbine.
• Assembled and connected 11 kV Switchgear panels, ensuring proper integration with the electrical system.
• Monitored S-curve constraints to track project progress and ensure timely job completion in alignment with planned
schedules.
• Managed team workflow and task allocation based on the availability of workers and technical staff to ensure efficient
resource utilization and uninterrupted project progress.
• Participate in all project safety and design reviews as necessary.
• Installed cable trays and trenches, power and control cables, connectors, and complete Earthing and Lightning
protection systems in compliance with project specifications and safety standards.
• Conduct inspections and quality checks on electrical installations and materials.
• Managing and allocating all Machinery related to external area excavation for installation of underground cables and
Transformer pits.
• Assisting, Project manager in professional manners by reporting him site conditions for the betterment of project and
handling the contractual matters.

Company industry:
General Engineering Consultancy

Electrical Internee Engineer

July 2019 - August 2019

Defense Housing Authority Islamabad

Islamabad, Pakistan

July 2019 - August 2019

• Employed in the technical and Engineering department, which encompassed responsibilities such as:
• Managing the street lighting system.
• Overseeing the underground power distribution system.
• Installing new three-phase meters.
• Installation of new 50KVA, 100KVA, 250 KVA Transformers.
• Part of the team which troubleshooting and problem-solving for the entire electrical distribution system of
DHA Phase-2.
• Completed the installation of underground power cables within scheduled timelines, coordinating the work
between foundation completion and the start of assembly installation to ensure uninterrupted workflow.
• Supervised 11 kV power cable jointing activities in coordination with linemen and the technical team to
ensure safety, quality, and compliance with industry standards.
• Undertake the detailed short-term planning and co-ordination at site in accordance with the master program.
• Managing all Machinery for external area excavation for installation of underground cables and Transformer pits.

Company industry:
Construction & Building

Education

COMSATS University Islamabad,Wah Campus

June 2024

June 2024

Master's degree, Electrical Engineering

Pakistan

GPA (point): 3.16 out of 4

GPA (point): 3.16 out of 4

Thesis Title: Optimizing Energy Efficiency in Cement Industry Through Load Scheduling.
View attachment

University Of Wah

July 2021

July 2021

Bachelor's degree, ELECTRICAL ENGINEERING

Pakistan

GPA (point): 3.08 out of 4

GPA (point): 3.08 out of 4

FYPD: Conversion of Conventional Air Conditioner into Inverted Air Conditioner.
View attachment

Skills

SAP
Expert
SAP
Expert
Inspection
Expert
Inspection
Expert
Testing
Expert
Testing
Expert
Commisioning
Expert
Commisioning
Expert
Planning
Expert
Planning
Expert
ELECTRICAL ENGINEERING
Intermediate
ELECTRICAL ENGINEERING
Intermediate
PREVENTIVE MAINTENANCE
Intermediate
PREVENTIVE MAINTENANCE
Intermediate
COMMISSIONING
Intermediate
COMMISSIONING
Intermediate
ENGINEERING MANAGEMENT
Intermediate
ENGINEERING MANAGEMENT
Intermediate
CONSTRUCTION
Intermediate
CONSTRUCTION
Intermediate
PLANNING
Intermediate
PLANNING
Intermediate
MULTIDISCIPLINARY RESEARCH
Intermediate
MULTIDISCIPLINARY RESEARCH
Intermediate
IMPLEMENT PROJECTS
Intermediate
IMPLEMENT PROJECTS
Intermediate
COMPLIANCE REQUIREMENTS
Intermediate
COMPLIANCE REQUIREMENTS
Intermediate
SAP ERP (PM & MM Module)
Intermediate
SAP ERP (PM & MM Module)
Intermediate
Primavera P6
Intermediate
Primavera P6
Intermediate
TEAM MANAGEMENT
Intermediate
TEAM MANAGEMENT
Intermediate
PROJECT COORDINATION
Intermediate
PROJECT COORDINATION
Intermediate
Thermographic Inspections
Intermediate
Thermographic Inspections
Intermediate
Project Scheduling
Intermediate
Project Scheduling
Intermediate
S-Curves
Intermediate
S-Curves
Intermediate
Power BI
Intermediate
Power BI
Intermediate
Microsoft Excel
Intermediate
Microsoft Excel
Intermediate
Electrical & Mechanical Installation
Intermediate
Electrical & Mechanical Installation
Intermediate

Languages

English
Intermediate
Arabic
Beginner

Training and Certifications

Certifications
CPR
First Aid
Confined space
LOTO Lock out, Tag out
Primavera P6
Industrial Automation PLC/SCADA/HMI
C++