Total des années d'expérience: 8 Années, 5 Mois
juillet 2011
A novembre 2015
Senior Civil Engineer ( Design & Supervision )
à Rehily Office for Engineering Consultants
Lieu :
Arabie Saoudite - Médine
Prepare Design and Follow-up Projects Like :
•Structural design for commercial and private projects
•Coordinate overall drawings with Arch,
Elec and Mechanical Drawings
•Supervision of projects
• Preparing plans for executing projects
• Quantities survey and analysis pricing
• Organize works area between engineers
•Scheduling projects sheet, follow and update
• Solve technical problems with owners and contractors
• Action monthly reports to the Director General on the progress of works.
•Structural design for commercial and private projects
•Coordinate overall drawings with Arch,
Elec and Mechanical Drawings
•Supervision of projects
• Preparing plans for executing projects
• Quantities survey and analysis pricing
• Organize works area between engineers
•Scheduling projects sheet, follow and update
• Solve technical problems with owners and contractors
• Action monthly reports to the Director General on the progress of works.
août 2009
A juin 2011
Site civil engineer
à Golden House construction company
Lieu :
Arabie Saoudite - Médine
Construction of Governmental Buildings :-
(Ministry of Health + Ministry of Trade and Industry)
• Prepare Shop Drawing + Quantities Survey
• Infrastructure Works+ Time scheduling
• Concrete Works +Finishing Works
• Make Invoices for Subcontractors
• Site Works + Asphelt Works .
(Ministry of Health + Ministry of Trade and Industry)
• Prepare Shop Drawing + Quantities Survey
• Infrastructure Works+ Time scheduling
• Concrete Works +Finishing Works
• Make Invoices for Subcontractors
• Site Works + Asphelt Works .
juillet 2008
A août 2009
Civil Engineer
à Alex Construction-Talaat Mostafa Group
Lieu :
Egypte - Le Caire
Responsible for :
• Implementation 150 Units (Buildings&Villas)
• Quantities Survey + Organize The Tasks
• Make Invoices For Sub-Contractors .
• Prepare Shop Drawing .
• Implementation 150 Units (Buildings&Villas)
• Quantities Survey + Organize The Tasks
• Make Invoices For Sub-Contractors .
• Prepare Shop Drawing .
juillet 2007
A juillet 2008
Site Civil Engineer
à Al Misriya Construction Company
Lieu :
Egypte - Le Caire
Responsible for :
Implementation three open playgrounds projects
+ Sohag Stadium repair up to Ministry of Youth
• (Excavation Works + Asphelt Works
• Ground Water Tanks + Sewage Plant
• Implementing Concrete Buildings + Steel Frames
• Infrastructure Works + Prepare Weekly Reports .
Implementation three open playgrounds projects
+ Sohag Stadium repair up to Ministry of Youth
• (Excavation Works + Asphelt Works
• Ground Water Tanks + Sewage Plant
• Implementing Concrete Buildings + Steel Frames
• Infrastructure Works + Prepare Weekly Reports .
Sposition project Location Owner Cost
à 1Egyp
Site Engineer
à Sohag Stadium repair Egypt Ministry of Youth
Site Engineer
à Alex construction Talaat Mostafa Group
Ministry of
Housing + tatweer
12 pillion
Dollars
4Kingdom of Saudia
Arabia :
5
Project Manager Health Affairs Building Medina Ministry of Health
8 million
s.r
6Consultant
Housing + tatweer
12 pillion
Dollars
4Kingdom of Saudia
Arabia :
5
Project Manager Health Affairs Building Medina Ministry of Health
8 million
s.r
6Consultant
Engineer
Site civil engineer
à Alex construction-Talaat Mostafa Group
Responsible for :
Implement 150 unit in the project, prepare shop drawing,
quantities survey, organized the tasks for
different teams, make invoices for subcontractors
Implement 150 unit in the project, prepare shop drawing,
quantities survey, organized the tasks for
different teams, make invoices for subcontractors
Partager sur Facebook