Instrumentation & Control Engineer
abo-qir power station (west delta electricity company
Total years of experience :17 years, 11 Months
Instrumentation & Control Engineer at Abu-Qir Power Plan
I am responsible for the meticulous maintenance and calibration of instrumentation systems spanning five steam power plants.
Collectively generating 900MW, these include four units of 150MW each and one unit of 300MW.
Maintenance Planning and Execution.
Mark VI Turbine Control System.
Proficient working experience with: Toolbox, Cimplicity and Historian Including software changes, Adding/configuring I/O points, Forcing signals, Hydraulic Servos and LVDT Calibration, Testing of turbine steam valves, Hardware configuration, Trend Recorder and System Troubleshooting.
Bently Nevada
3500 Vibration system monitoring
Proficient working experience with software configuration, system software (3500
configuration utility and Data Manager™ 2000), all sensors installation and calibration (Turbine Measurements: Radial Vibration, Axial displacement, Case Expansion, Key Phasor, Seismic and Eccentricity)
Systems Maintenance for
Honeywell TPS DCS System
Siemens Step7 PLC
and
WinCC SCADA System
.
Allen-Bradley PLC
, RSLogix 500 slc&
SCADA system Factory Talk View
.
Responsibilities and Achievements:
System Integration and Testing:
Led the integration and testing phase for instrumentation systems.
Commissioning Planning:
Developed comprehensive commissioning plans outlining procedures, schedules, and resource requirements.
Troubleshooting and Optimization:
Played a key role in troubleshooting technical issues during the commissioning phase, minimizing downtime and optimizing system performance.
Documentation and Reporting:
Maintained detailed records of commissioning activities, including test results, system configurations, and troubleshooting steps.
Collaboration and Communication:
Worked closely with cross-functional teams, including electrical engineers, project managers, and technicians, fostering effective communication and collaboration.
Quality Assurance:
Enforced rigorous quality assurance protocols to guarantee that all instrumentation systems met or exceeded industry standards.
Attended an upgrade for
Electro chlorination Unit
from Jan 2014 to Aug2015 implemented by the
Italian Company De Nora
and running Siemens Step7 PLC and WinCC SCADA System.
Attended an upgrade for
Hydrogen Unit
from Sep 2012 to Aug 2013 implemented by
Egyption Maintenance Company
and running Siemens Step7 PLC System.
Attended an upgrade for
Polishing Unit
from Jan 2010 to May 2011 implemented by
El Sewedy
and running Allen-Bradley PLC, RSLogix 500 slc& SCADA system Factory Talk View
Attended an upgrade for
Water Treatment Unit
from Feb 2009 to Dec 2009 implemented by
el-gharably company
and running Siemens Step7 PLC and WinCC SCADA System.
in Seawater desalination plant (Harmony Makadi Bay Hotel in Hurghada)