Hany Shawky, Document Controller Team Leader

Hany Shawky

Document Controller Team Leader

Orascom Construction Limited

Lieu
Egypte - Ismaïlia
Éducation
Baccalauréat, High Education Ministry
Expérience
24 years, 11 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :24 years, 11 Mois

Document Controller Team Leader à Orascom Construction Limited
  • Egypte - Port Saïd
  • Je travaille ici depuis août 2017

Security Aria for Port Said Tunnels (12 Building West site & 10 Building East site) with the gates
•Owner : Egyptian Armed Forces
•Consultant : Moharam Bakhom office ACE
•Contractor : Arab Contractor & Orascom Construction JV
•Location : West & East Port Said City & Cairo City

Description :
Work on both projects (Security Aria For The tunnels & Port Said Tunnels - East & Wast) with the same objectives and in parallel way. With a minor difference due to the difference of consultant background and requirements

Document Controller Team Leader à Orascom Construction Industries Company
  • Egypte - Port Saïd
  • Je travaille ici depuis avril 2015

Port Said Tunnels (2 Roadway - 1 Railway) under Suez Cannel
•Owner : Egyptian Armed Forces
•Consultant : Systra & Engineering Consultants Group ECG
•Internal Consultant : Vinci.
•Contractor : Arab Contractor & Orascom Construction JV
•Location : West & East Port Said City & Cairo City

Description :
1.Prepare the coding system for the project documents according to Aconex system after discuss with every team work.
2.Prepare the documents forms for the project (Letter in/out - Request for information (RFI) - Inspection Request (IR) - Meeting of Minutes (MOM) - Non-conformance report (NCR) - Submittal Cover).
3.Communicate with the consultant and the designer (Vinci - Sener - Amberg - ILF) and subcontractor (51 Vendors) to make them documents matching with our coding and forms.
4.Follow up the filling system (soft - hard), Aconex system, DC server and logs to be up-to-date.
5.Be sure to receiving all documents according to DC rules (Codes & stamp) and distributed it .
6.Follow-up the team to upload all documents on Aconex system and complete loge to be up-to-date.
7.Follow-up the team to use the stamps (Received - For Information - Canceled - Approved - Superseded).
8.Prepared weekly and monthly documents report to know last status for it with statistics charts.
9.Feedback the planning team with the final situation of the totally percentage of all (design drawing - shop drawing) with the code status.
10.Make training for all our foreigners and local users in Aconex documentation system.
11.Make power point presentation for Aconex training and documents situation in the monthly meeting.
12.Follow up the documents in all site sections (Quality - Quantity Survey - Technical Office - Safety - Segments Factory) in west and east site.
13.Prepare the close out for all project documents.

Senior Document Controller à Orascom Construction Industries Company
  • Egypte - Le Caire
  • décembre 2013 à mars 2015

Mars Egypt Factory Development Project
•Owner : Mars Company.
•Consultant : Engineering Consultants Group ECG
•Contractor : Orascom Construction
•Location : 6th of October City.

Description :
1.Prepare all documents to update logs and filling it soft and hard then upload it on Expedition system.
2.Send weekly Shop Drawing and Inspection Request report to management team.
3.Prepare the weekly & monthly reports with the planning team.
4.Prepare engineering updating schedule every two weeks with planning team to calculate the time impact report for the shop drawing works.
5.Prepare power point presentation with all technical event supported with all documents in / out to present it in monthly meeting between owner, consultant and contractor.

Senior Document Controller à Orascom Construction Industries Company
  • Egypte - Alexandrie
  • mai 2009 à novembre 2013

Abu Qir Thermal Power Plant Project - Unit 6&7 - 2x650MW Gas/Oil Fired Units (CP102 Contract)
•Owner : Egyptian Ministry of Electricity.
•Consultant : Power Generation Engineering & Services PGESCo.
•Contractor : Orascom Construction
•Location : Alexandria City & Cairo City.

Description :
1.Prepare the coding system for the project, documents forms and DC logs works.
2.Prepare separate DC work for the contract specification and updating it.
3.Received, stamped, filing, record and distribute the documents.
4.Follow with the team the logs updating and the filling system.
5.Be sure to be use the stamp on all documents before filling (Master -Construction - Superseded - For Information - Canceled).
6.Linked all change notes with its drawing and MIR (internal & external).
7.Prepare the weekly and monthly report with the quality department.
8.Make training for all new users in the site to know how to use the documents system.
9.Be sure that all documents take the suitable stamp with date and cade then scanned for filling.
10.Dispatch all documents to each project groups
11.Prepare the as built and close out documents soft and hard with stamp.

Document Controller à EDF ( Electricité de France )
  • Egypte - Port Saïd
  • décembre 2003 à avril 2009

Notes : This company was subordinate to the mother french nationality company EDF ( Electricité de France ) until 31st December 2005 and now was sell to malaysian nationality company Power Tec ( Kuasa Nusajaya ).

Description :
1.Prepare a big documentation library (DCC) for all the plant documents (hard & soft).
2.Make lay out for the DCC standardization as (Unit - Column - Shelf) and the filling in it made based in alphabetical category of documents and then by chronological.
3.Prepare a log for all documents (Design - Engineering - Operation - Maintenance - HR - Logistic - Direction).
4.Linkup with anther subordinate libraries in the site to update documents.
5.Recording all documents on Taurus & MP2i program and gave filling code (Date out or in - Serial number - the location filling in reference library).
6.Be sure that all documents suitable stamp (Master Documents - Copy - Cancel).
7.Check up all drawings inside the files after employees using to repair and recopying the consumer documents.
8.Follow up to get back the documents was borrowing out the reference library through the borrowing logbook.
9.Give an update list every end of the month to all managers.

Document Controller à Manufacturing Commercial Vehicles Company (MCV)
  • Egypte - Le Caire
  • juillet 1999 à novembre 2003

Description :
1.Preparation and printing the inspection logbooks for every bus or minibus one inspection logbook to record in it all inspection remarks for all station production and delivery it to the quality control inspector.
2.Renewal the inspection logbooks and reckon remarks and change that for numbers to make collecting excel data sheet and calculation the short spare parts or perishable tools.
3.Filling the inspection logbooks by number and delivery bus date with serial number and client name.
4.Make weekly and monthly finishing line reports with statistic charts.
5.Filling all department documents each one includes kind of documents (soft & hard).
6.Using two stamps (outgoing - coming) for documents and three stamps (Master Documents - Copy - Cancel) for drawings design.
7.Recording the documents (Serial number - date - Subject - For - From - Remarks) on access database.
8.Prepare QC certificate by serial number, date, and signature with department stamp after finalize the Vehicles
9.Addressing by E-mail all intended department by last situation when the quality control department give the buss (O.K Quality) and send it to store department.
10.Filling the inspection logbooks by bus number and delivery bus date with serial number and client name with all modification and copy form quality control certificate to close this job to send it to the customer delivery department.

Éducation

Baccalauréat, High Education Ministry
  • à Higher Institute Social Work
  • mai 1997

Studying The Human Being, The Community, Society And How Affect Each One On The Other.

Specialties & Skills

Document Control
Document Design
Construction Documents
Coordinated between the documents
Teaching and training others
Documentation System
Microsoft Office

Langues

Arabe
Langue Maternelle
Anglais
Expert

Formation et Diplômes

First Aid Fire & Fighting and Safety Tools (Formation)
Institut de formation:
Primary Health Care
How to manage the documents (Formation)
Institut de formation:
Targed
Windows 2000 Fundamentals (Formation)
Institut de formation:
IBM
Aconex Document system (Formation)
Institut de formation:
Aconex Company & Orascom
ISO 9001- QMS (Quality Management System). (Formation)
Institut de formation:
Targed
ISO 14001 - EMS (Improvement Management System). (Formation)
Institut de formation:
Targed
ISO 18001 - OHSAS (Quality Healthy and Safety Arrangement System). (Formation)
Institut de formation:
Targed
Office 2003 - 2007 - 2010 (Formation)
Institut de formation:
IBM & internal company
Windows XP Provincial (Formation)
Institut de formation:
IBM

Loisirs

  • Traveling
  • Music
  • Reading
  • Drawing