Muhammad إدريس,

Muhammad إدريس

China National Logging corporation

البلد
باكستان
التعليم
ماجستير, GEOLOGY
الخبرات
5 years, 5 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :5 years, 5 أشهر

في China National Logging corporation
  • باكستان
  • يوليو 2013 إلى مايو 2014

July 16, 2013 - Present: China National Logging corporation (CNLC) Iraq.

Position Mud logger
Project.
Halfaya Iraq.
Client.
Petro China
.

في Shengai, shenkai Petroleum Science & Technologies Company Ltd
  • يناير 2012 إلى يوليو 2013

January 2012 to July 2013: Shengai, shenkai Petroleum Science & Technologies Company Ltd.

Position Mud Logger

Duties & responsibilities:
As a mud logging geologist I have good knowledge and experience in monitoring of drilling operations, installation and calibration of sensors and trouble shooting. I
have valuable experience: • Sample description and marking the Formation Tops.
• Analysis of Formation Cuttings for Gas & Oil shows.
• To Handle Coring and packed them systematically.
• Master log.
• Engineering report.
• Hydraulic report and swab and surge reports.
• Daily operations summary.
• Fairly well aware of all types of well site geologist's responsibilities including
daily, weekly and final well reports writing and Well operations.
• Observed Wire line Logging in Opened/Cased Hole and learnt Quick look
• Litho logical description of flush cuttings and cores.
• Preparation of Master Log.
• Preparation of Trip Sheet.
• Monitoring of different drilling, mud and geo pressures parameters.
• Sensors Calibration and other electronic gauge of mud logging unit.To prepare different kinds of reports and chart.

Trainee Mud Logger في Shengai, shenkai Petroleum Science & Technologies Company Ltd
  • يناير 2009 إلى يناير 2012

January 2011, 2009 to 2012: Shengai, shenkai Petroleum Science & Technologies Company Ltd.


• Position Trainee Mud Logger


Sampling: Collection of drilled samples at specified lagged intervals Washing, sieving and drying followed by packing and labeling.
Monitoring pumping data (SPM, SPP, Lag time, Lag strokes) during kick circulations and necessary operations. Identify probable cause of kick and recommending actions to prevent further occurrences.
Monitoring Mud (Mud vol, Mud wt., Mud Temp, etc), Gas and drilling parameters (ROP, WOB, RPM, SPM, SPP, Hook load and torque etc.)

الخلفية التعليمية

ماجستير, GEOLOGY
  • في Bahria University Islamabad
  • مارس 2008

1) Master in GEOLOGY. (CGPA. 3.18) 2) B.sc in GEOLOGY. (CGPA. 3.08) Education History, Qualifications & other additional information Level of Education: Master

Specialties & Skills

Structural Geology
CALIBRATION
COLLECTION
GEOLOGIST
OPERATIONS
PACKING
SAMPLING
SENSORS
PROBLEM SOLVING
LOGGING

اللغات

الانجليزية
متمرّس

الهوايات

  • resding book, palying cricket