HSE Manager
Tamami PEB
Total years of experience :15 years, 3 Months
Project:
AMAALA TRIPLE BAY CONSTRUCTION VILLAGE PROJECT
Amaala Triple Bay Construction site is located within the AMAALA project site, almost 70 km North of Al Wajh. The overall AMAALA site covers an area of approximately 6, 700 hectares, village built on potable type modular which can accommodate 15500 residences at a time
Projects:
CRPO No. 6510797896 (OOK), 6510797893 (IK) BI-10-00909 (5) PIPELINES REPLACEMENT AT BERRI FIELD Aramco Offshore Department
Subsea Installation and demolition (Riser & Riser-guard demolition & installation, including clamps, Subsea spools installation and Sleepers /Mattresses Installations). Job scope with Saudi Aramco platforms TP1, TP2, TP3, 58/63, 95/100, 52/57
Berri Field 5 Pipelines Replacement Project (CRPO-3648, Aramco Offshore Department
Berri Field 5 Pipelines (22Km) Replacement Project:
36-inch pipeline, 24 Inch pipeline, 16-inch pipeline by using Derrick pipelay barge Lanjiang Vessel.
DSV Vessel diving support vessel (BE 806 Vessel) for demolish the existing pipeline.
Backhoe Dredger Ijzeren Hein vessel for 4.5 Km trenching at shore site.
4.5 KM beach pull activity with Derrick pipelay barge.
Anchor Block inside the GOSP 5 Abu Ali Plant
Aramco Offshore Department
Marjan-Zulf, Safaniya, Abu safa, Karen, GOSP, TP-09.
(Successfully completed Fabrication of 34 offshore platform topsides & 17 Platform Jackets)
•Company: SADARA Petrochemical Plant, Saudi Arabia
Saudi Aramco & Dow project
SDL Building Projects;
Construction of Buildings, Infrastructure, Power/Warehouses, Security control, Emergency Response buildings inside SADARA Plant (Including all MEP systems)
SDL Pipeline Projects;
05 Km Pipeline from Sadara Petrochemical Plant to Saudi Aramco Facility Jubail II.
•Company: AlSaif Engineering
Projects:
MAF Construction Phase III:
Construction of Houses Buildings
Projects:
Asian development Bank program:
RCC construction of 5 bridges (span 240 M Each)
(pass)