hasan nazzal, Resident Engineer

hasan nazzal

Resident Engineer

Arabtech Jardaneh

Lieu
Jordanie
Éducation
Etudes secondaires ou équivalent, Civil Engineering
Expérience
34 years, 8 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :34 years, 8 Mois

Resident Engineer à Arabtech Jardaneh
  • Jordanie
  • Je travaille ici depuis août 2009

• Verify and approve invoices of purchases
•Supervise the planning, coordination and implementation of construction projects.
•To ensure the projects adhere to all plans and regulations and that safety measures are appropriately taken.
•Leads projects and supervise staff,
•Inspect and assess the quality of materials being used for construction projects.
•Calculate the quantity of material, supplies and equipment needed for each individual Project.
•Oversee the work of field staff to ensure efficacy of work procedures
•Ensure compliance to project specifications
•Ensure availability of resources and materials at all times
•Provide recommendations for repair work and make sure that deadlines are compiled to
•Perform continuous evaluation on trends and ensure that preventative maintenance is managed at each stage of the project
•Make sure that all construction activities are being carried out in accordance to preset safety rules

Projects
•Resident Engineer at Hilton Dead Sea Resort & Spa Project, Jordan.
From 2014- up to date
Of an area of 34, 000 m2, located over land area of +300, 000 m
70 million Five Star Hotel, Remedy an upgrade
Phase of (20 million)

Project Manager à Emmar International
  • janvier 2011 à janvier 2014

JV -Unic-el Concord

Stage 2

- Project Manager: APEC
- Contractor: Arabtec Construction LL C

•Resident Engineer at Intelligent Prestigious Building in Amman (Centro Mall).

à The National Resources Investment & Development Corporation
  • mai 2007 à août 2009

Mawared Investment for Dead Sea Projects
Development and investment projects DIP for live investment for Dead Sea Projects
Responsibilities:
•Responsible for ensuring that the Company Quality Standards and plans and the
Technical Development Office guideline is implemented properly.
•In coordination with the Project Management Office is responsible to oversee planning
And allocating resources and workload to ensure proper distribution of work.
•Determine project feasibility and direct all resources to the site in a time efficient manner
•Provide technical advice to field staff in order to ensure that construction procedures are being carried out properly
•Identify construction constraints and plan and carry out measures to counter them
•Prepare public reports such as bid proposals and environmental impact statements
•Test sites to ensure appropriateness for construction project
•Prepare periodic reports and assessments for each project phase
•The discipline's technical reference point, responsible for resolving any technical conflicts that might arise in coordination with the Technical Development Principal Engineer and the relevant Subject Matter Expert.
•Responsible for ensuring that the Company Quality Standards and plans and the Technical Development Office guidelines are implemented properly.
•Coordinating production of Design Drawings, licensing procedures, tendering process and deliverables
•Monitoring All Design Development Production in line with Projects Durations

Projects
•DIP at O Beach, a Daily Resort and Spa of +35 million JOD .

à Al
  • Canada
  • décembre 2005 à mai 2007

a government project of JD7 million (10, 000m2), and one of the leaders Projects that introduces the concept of "smart building in Jordan

à Wadi AL Anbar Hotel and sp
  • avril 2004 à mai 2007

A well Known office - Established in 1950, well known of its great expertise locally and
Internationally~ it consists of 11 departments of which construction management is one of them.

à Al-Shakhsheer Company
  • avril 2004 à décembre 2005

of 7 stories (1O, 000m2) with the Total budget of JD 5 million.

Free-lance engineer
  • décembre 2003 à avril 2004

Free-lance engineer: worked as a construction manager for the JD3 million "Urban
Development project "in salt-Jordan. This project aimed to setting up, lay down and hooking
Water and sewerage systems within Al-Maghreb housing project, as well as responsible of all
Electro Mechanical work

Senior area project engineer
  • janvier 2002 à janvier 2003

In charge of follow up and supervision of major on-going Army project, in all technical, financial and contractual matters

From 1998 to 2002:

•Resident Engineer for various army projects, such as:
•Laboratory project, Royal Medical Services, 6 million USS project, acting as the owner's
•Representative, the supervising consultant was Dar Ai-.Handasah
•Swimming pool prefect in the Zarka area, a 200, 000 JD project
•Princess Muna collage of nursing, royal medical services, a 4.5 million USS project including a total built-up area of 10, 000m2 and fully equipped kitchens and all electromechanical Systems (smart building).

Head of civil engineers dept
  • janvier 1996 à janvier 1998

Giving lectures for beginning and advanced courses to engineering officers
- In charge of engineering laboratory, responsible for testing all structural materials used by JAF

Maintenance engineer à Royal Medical Services, JAF
  • janvier 1994 à janvier 1996

Supervising the maintenance of three army hospitals, according to the Medical SeNl.ces Pohc` ies and budgets.

Contracting officer
  • janvier 1992 à janvier 1994

Contract committee, in charge of preparation of contract documents and evaluating and awarding contrast.

Site Engineer
  • janvier 1988 à janvier 1992

This is a 45 million US dollar project, designed and executed by an international contractor (Federal Directorate of supply and Procurement - Yugoslavia), through several specialized sub-contractors. The projects total Area is 134, 000 rn2, and includes offices, accommodation, recreational and support facilities. Duties included:

•Quality Control Engineer and safety officer, in charge to the laboratory and testing
•procedures~
•Approval of the work progress program and its updates.
•Daily supervision and follow up of the contractors~ work, including checking and approving daily job requests
•Reviewing and approving shop drawings and details of work
•Approval of material submittals according to contract documents, and attending factory testing for major equipment.
•Approval of monthly payment to contractors according to work progress
•Monitoring and coordination the works of the various contracts and solving conflicts.
•Witnessing and approving the As- built drawings and operation and maintenance manuals
•Overseeing the final take-over of the work and the contractor's final payments
•All other contractual, financial and technical issues as they arise.

Structural Design Engineer à Jordan Armed Forces
  • Jordanie
  • janvier 1985 à janvier 1988

Preparing structural design, technical specifications and BOOS for various army projects, Including steel structures road works and infrastructures.
•Cost estimation and material take-off list preparation
•Participation in evaluation and awarding of contracts through the tendering committee.
•Completed several army projects throughout the country, such as major camp locations, :


Courses and

  • janvier 1992 à

Attended an advanced military course in the USA, concerning psychological operation
Warfare an instructor course, for a total duration of for months.

Resident Engineer à Japanese Tobacco International
  • à

Of Intelligent Industrial Project ~ Atomized from Swaziland
+100 million JOD

From 2009 -2011

- 100 million JOD Industrial Factory -Jordan Branch
- 35 million JOD- Sudan Branch

Éducation

Etudes secondaires ou équivalent, Civil Engineering
  • à University of Jordan
  • janvier 1985

Jordanian Tawjihi, Scientific Stream, Rank of 97

Specialties & Skills

BUDGETING
CONTRACT MANAGEMENT
ENGINEERING
MATERIALS MANAGEMENT
MICROSOFT OFFICE
MICROSOFT WORKS
QUALITY
SUPERVISORY SKILLS

Langues

Arabe
Expert
Anglais
Expert