Submitting more applications increases your chances of landing a job.

Here’s how busy the average job seeker was last month:

Opportunities viewed

Applications submitted

Keep exploring and applying to maximize your chances!

Looking for employers with a proven track record of hiring women?

Click here to explore opportunities now!
We Value Your Feedback

You are invited to participate in a survey designed to help researchers understand how best to match workers to the types of jobs they are searching for

Would You Be Likely to Participate?

If selected, we will contact you via email with further instructions and details about your participation.

You will receive a $7 payout for answering the survey.


User unblocked successfully
Hasbullah Harun, Senior Piping Designer

Hasbullah Harun

Senior Piping Designer·Wood Group Mustang (M)

Malaysia

Diploma, Mechanical Technology

Work experience

Total years of experience: 19 years, 5 months

Senior Piping Designer

January 2007 - Present

Wood Group Mustang (M)

Malaysia

January 2007 - Present

Company industry:
Modeling & Talent Agency
Job role:
Engineering

Ivar Aasen Development Project

-

-

Job role:
Other

Piping designer

-

Piping design using PDMS

-

Produce Equipment Layout
Produce/generate Piping General Arrangement Drawing using PDMS 2D Draft
Produce/generate Special Support Drawing using PDMS 2D Draft
Report using PDMS
Modeling 3D (PDMS)
2D Draft (PDMS)

Project: Provision of Engineering Design Services for Pm318 Puteri Infill Drilling

Job role:
Engineering

Project

-

-

E8k and F13k Compression Detail Design

Piping design using PDMS
Produce/generate Piping General Arrangement Drawing using PDMS 2D Draft
Produce/generate Special Support Drawing using PDMS 2D Draft
Report using PDMS
Modeling 3D (PDMS)
2D Draft (PDMS)

Client: Shell Berhad
Project: Tapis EOR pre-FEED

Study for equipment layout
Prepare safety drawing for escape route
Study for launcher and receiver for existing and new platform
Modeling using PDMS
Prepare equipment layout using PDMS 2D Draft

Client: ESSO

Project: Semarang Re-Development

Site visit for checking tie-in point (phase 1 & phase 2)
Prepare isometric sketch
Checking line as per P&ID
Mark-up P&ID as per site condition
Prepare drawing for SIPROD

Job role:
Engineering

Project

-

PETRONAS Carigali Sdn Bhd

-

AFS-004 Field wide Fire Fighting Equipment (TAPIS FIELD)

Offshore site visit for tie-in locate
Prepare isometric sketch

Client: ESSO

Project: Provision of Deep Pilot Design

Site visit for checking tie-in point BMA Platform.
Prepare isometric sketch
Checking line as per P&ID
Mark-up P&ID as per site condition

Client: Carigali Hess Operating

Company industry:
Oil & Gas
Job role:
Engineering

Project

-

-

Wellhead platform and pipeline

Site visit for checking tie-in point CKB Platform.
Prepare isometric sketch
Checking line as per P&ID
Mark-up P&ID as per site condition

Client: Carigali Hess Operating

Project: Melut Basin Phase 2 Detail Design

Prepare/incorporate equipment layout
Prepare general arrangement piping plan
Modeling 3D (PDMS)
2D Draft (PDMS)
Report using PDMS

Client: Sudan oil & gas


Project: Generic Satellite Wellhead Structure (Gases & Oil) for Petronas

Prepared equipment layout with mechanical engineer Study for major piping
Produce 6 type of equipment layout for drilling Platform Gas facility 3 layout included 4 leg and tripod
Oil facility 3 layout included 4 leg and tripod

Job role:
Engineering

Project

-

PETRONAS Carigali Sdn Bhd

-

BP Lan Tay Compression Module (As-Built) Job

Incorporate As-Built drawing
Incorporate pipe support drawing
Incorporate isometric drawing as per site condition

Company industry:
Oil & Gas
Job role:
Engineering

Project

-

Modeling 3D (PDMS)

-

Prepare/incorporate equipment layout
Prepare general arrangement piping plan
Prepare mechanical drawing using PDMS 2D draft (nozzle orientation drawing

Job role:
Engineering

-

Shell Berhad

-

Scope of Work
Piping design using PDMS
Develop equipment layout
Pipe Support (MDS) multidispline pipe support.
Assist On Updating Piping MTO (Material Take Off).
Drafting Of Piping General Arrangement
Prepared Equipment layout
Isometric Drawings.
Get involved in PDMS administrator work.
PDMS Design/Drafting
Pipe support drawing package.
Safety drawing

Company industry:
Oil & Gas
Job role:
Other

Piping Design Lead

-

WALTER CLINCH

-

Job role:
Engineering

Education

mara colloge

June 2007

June 2007

Diploma, Mechanical Technology

Malaysia

Skills

3D
Beginner
3D
Beginner
ACAD
Beginner
ACAD
Beginner
APPROACH
Beginner
APPROACH
Beginner
AUTOCAD 2000
Beginner
AUTOCAD 2000
Beginner
BASIC
Beginner
BASIC
Beginner
BRITISH MEDICAL ASSOCIATION
Beginner
BRITISH MEDICAL ASSOCIATION
Beginner
C
Beginner
C
Beginner
COM
Beginner
COM
Beginner
CONCEPTUAL DESIGN
Beginner
CONCEPTUAL DESIGN
Beginner
CUSTOMER RELATIONS
Beginner
CUSTOMER RELATIONS
Beginner

Languages

English
Expert