Hassan Mokhtar, مدير جودة و صحة و سلامة مهنية

Hassan Mokhtar

مدير جودة و صحة و سلامة مهنية

Saudi company for electo mechanical services

Location
Saudi Arabia - Buraidah
Education
Bachelor's degree, الهندسة المدنية
Experience
16 years, 4 Months

Share My Profile

Block User


Work Experience

Total years of experience :16 years, 4 Months

مدير جودة و صحة و سلامة مهنية at Saudi company for electo mechanical services
  • Saudi Arabia - Buraidah
  • My current job since December 2018

Project : Tunneling - AN Naqqa Storm Water Drainage Project. (0.552, 3 Billion SAR).
Owner : Qassim Municipality
Consultant: Radian.
 Main Project activities:
• Executing 27 Deep Shafts Using Diaphragm walls & Sinking walls and Secant pile Methods with depths range between 20 to 60 m deep.
• 9.7 km of Tunneling Line using Thrust boring machine with an inner dia. of 3500mm Jacking Pipes connecting AN-Naqqa Area and other adjacent lines to Wadi Ar-Rumah.
• The execution of three Collection water Ponds stone lined, with an approximate area of 500, 000 sq. m.
• The Execution of three water pumping station
 Two of them including water collection tanks with depths of 10-14m using shoring soldier piles system ensuring 24hr of dewatering & Lifting water Stations including high Pump’s Head of 30m with a flow rate of more than 2000 L/s.
 The Third is executed using excavation inside a temporary diaphragm walls and then executing the permanent structure using the slip form system (7000 m3 in almost 14 days continues concrete pouring)
 Duties:
• Revising the Project’s standards and specs to provide accurate material selection for all civil/structural/architectural material, reviewing and preparing for submittal to client for approval.
• Preparing activities M.O.S. for approval and following up to be used in site execution.
• Daily surveillance in site activities to avoid any violation and following up ongoing violation reformations.
• Construction team support with any needed training/Clarification with materials, methods of statement and the necessary precautions to avoid violations during construction process.
• (Work Commencement Notice (WCN), Inspection Request (IR), Material Inspection Requests (MIR), Concrete Pouring Request (CPR), Internal Non-conformance Reports (NCR).
• Preparing material test schedule for the project material and following up the tests are carried out according to the scheduled plan.
• Preparing a monthly inspection - testing report showing actual work progress which help construction team to improve the productivity.

Construction Manager at Misr Engineering Development Company ( MEDCOM)
  • Egypt - Cairo
  • April 2018 to November 2018

Project : MIVIDA Housing project (1.1 Billion Egyptian pounds)
Owner : EMAR MISR.
Consultant : El Ammar Consulting.
 Main Project activities:
• Executing of 164 Double story Villa with different areas (90 to 400) sq. m.
• Executing of site infrastructure.
 Duties:
• Follow up project team, subcontractors for site activities to ensure that the work is going according to scheduled project plan within allowable limits.
• Following up Various Concrete works for the villa’s skeleton.
• Arranging all required material, Equipment and manpower requests which required to finalize the work in time.
• Following up consultant, client requirements and taking his satisfaction a necessary within allowable project cost.

Construction Manager at Shar Company
  • Saudi Arabia - Tabouk
  • October 2016 to January 2018

Project : Armed Forces Housing project. (1.2 Billion SAR)
Owner : MOD
Consultant : MOD.
 Main Project activities:
• Five Story 87 housing building (Turn Key)
• Mosque and market (Turn Key).
• Water treatment Plan.
 Duties:
• Construction Manager for all Architectural Finishing works in the Housing buildings including:
 Waterproofing, protection and epoxy works.
 Extremal & internal plastering and painting.
 Ceramic & Porcelain wall and flooring. Granite & Marble cladding. Ceiling.
 Door & window installation, painting and hardware installation.
 Electrical, Sanitary finishing Fixtures.
 All needed activities to handover the project.
• Arranging all finishing work activities to be sequentially done through all building in parallel time without any conflict with other work activities.
• Preparing material, equipment plans and requests for the finishing work to make the work going smoothly.
• Direct Managing, following up of all subcontractor’s progress and work quality.
• Preparing weekly progress report including required material and equipment.
• Reviewing invoices for the subcontractors.

Senior Civil Engineer at Saudi Oger LTD.
  • Saudi Arabia - Dammam
  • March 2014 to October 2016

Project : King Abdullah Bin Abdul-Aziz Project for development security facilities Phase1 (KAP-1), (7.5 Billion SAR).
Owner : Ministry of Interior (MOI).
Consultant : Khatib & Alami Consulting Office.
 Main Project activities:
• 305 security buildings various prototypes Kingdom wide, 27 of them are in the Eastern Area.
 Duties:
• Direct Managing two sites (civil defense squads No.95 & 220) until handing over in one day.
 Team leading & site activities / material / work quality following up, and insuring that the work is going according to specifications, conformance to specifications and IFC Drawing within allowable limits.
 Preparing, following up project material, Equipment, workmanship requests.
 Monitoring all work disciplines are going in sequence without any interference.
 Preparing needed documents (Work Commencement Notice (WCN), Inspection Request (IR), Material Inspection Requests (MIR), Concrete Pouring Request (CPR) for all civil, architectural activities.
 Following up all subcontractor’s progress and invoicing if needed.
• Managing of Eastern Area-2 sites (13 site) reporting to Area Construction manager.
 Daily basis sites surveillance.
 Weekly reporting to project area management.
 Monitoring of project progress versus scheduled plan.
 Holding meetings and discussion about the problems and requirements of the sites
 Problem solving and escalation only for top management decision needed ones.
• Managing of all eastern area snag list closer.
 Daily, weekly, when needed snag list update for the area initial handed over projects.
 Routine surveillance to sites to confirm the construction wise items and ongoing progress for the snags closing.

Site Engineer at A.S.ALSAYED & PARTNERS Contracting co.ltd
  • Saudi Arabia - Najran
  • November 2009 to February 2014

Project : Najran University Project (Phase 1)
Owner : Ministry of High Education (Najran University)
Consultant : RADAHAT Engineering Consulting Office.

 Project: Najran University:
• Site Engineer of the computer science project for 3 Month (150 Million SAR).
 Responsible for all structural work in site (Frame & steel work for: hollow core slap & double T slap systems beams & columns, precast facades)
• Site Engineer of the Stadium project for 6 Months (80 Million SAR).
 Responsible for all civil works in site (Frame Girder systems, steel shades, landscape, precast facades).
• Site Engineer at the Male medical science college for one Year (150 Million SAR).
 Responsible for all architect works in site like not all: gypsum and cement walls, plaster, ceramics, porcelain, marble, granite, paints, metal & wooden doors, certain walls, precast facades, handrails, roof proofing, cladding, all kind of false ceiling, swimming pools, water gets.
• Site Engineer of the Female College of Education project for six Months (150 Million SAR).
 Joined the project from excavation until finishing 2 floors (30.000 m3 of 33.000 m3) concrete was poured during my duty in the project; Arranging between different branches of work ( Electrical, mechanical, civil, architect ) was one of the important point that leaded the project to succeed and achieve the company goals in this project comparing to the same project in other companies; I was able to finish my duets and company goals in best time with allowable tolerance, more than 300 Labor with different professions was under my constructions in this project.

Site Engineer at Rukn AL Delta Establishment For General Contracts
  • Saudi Arabia - Buraidah
  • November 2007 to November 2009

 Qassim general police moderation Reparation.
 King Faisal Mosque Reparation.
 Female Qur’an Memorization Center Reparation.

It was my start point in the field of contracts; I was responsible for all civil and architect works including:
 Waterproofing, protection works.
 Extremal & internal plastering and painting.
 Ceramic & Porcelain wall and flooring. Granite & Marble cladding. Ceiling.
 Door & window installation, painting and hardware installation.
 Electrical, Sanitary finishing Fixtures.
 All needed activities to handover the project.
In addition to preparing all shop drawings and inspecting all works, preparation of all ongoing and final invoices.

Education

Bachelor's degree, الهندسة المدنية
  • at جامعة المنصورة
  • July 2007

 Ability to work in the most difficult conditions and according to Specifications.  The ability to create a spirit of cooperation in work which pushing the work to his best.  Good treatment with the work group.  Practical experience in most of the construction works according to drawings and Specifications.  Practical experience in architectural works and consistency with each other according to drawings and the assets of industry.  Highly experienced in the field of administrative transactions and correspondence via e-mail.  Highly experienced in the computer and AutoCAD.  Ability to make necessary shop drawings to implement some of the details.  Using (Business Software Solution).

Specialties & Skills

Construction & Property
Project Execution
General Construction
Universities
AUTOCAD
Lead civil and structural engineers
Stormwater Management

Languages

English
Expert

Memberships

نقابة المهندسين السعوديين
  • مهندس مدني
  • December 2012
نقابة المهندسين المصريين
  • مهندس مدني
  • September 2007

Training and Certifications

English To Arabic Translation Skills (Certificate)
Date Attended:
January 2016
ISO 9001:2015 (Certificate)
Date Attended:
November 2020

Hobbies

  • IT Skils
    I am skilled in IT issues solutions , i like to read & try to apply some IT skills in my free time