مهندس كهربائى à Zuhair Fayez Partnership Consultants
  • Arabie Saoudite - Jeddah
  • janvier 2011 à mai 2013

Zuhair Fayez Partnership Consultants Riyadh - Saudi Arabia (January 2011 - present) the profession of electrical engineer and work has been assigned to me as follows

Supervising the implementation of electrical works project care center Jeddah Interior Ministry (switsh gear, ring main unit, transformers, Low voltage switchboards MDB's, generators, ups _ lighting works and poweres - low current systems (fire alarm _ TelePhone _ Data _ Public Address System _ Audio Visual System _MATV _ Access control systems_ security systems _ Intercom Access Control System _ intrusion alarm system_ nurse call system _ CCTV) _ grounding system and lightning protection _ electrical work for Swimming pool, kitchens and laundries central _ electrical work for ( R.O plant _ sewage treatment plant _ irrigation _ wells electric _ water and fire pumps)

Director à Qusour Bilady Contracting company
  • Arabie Saoudite - Riyad
  • janvier 2008 à janvier 2011

Qusour Bilady Contracting company Riyadh - Saudi Arabia (January 2008 - January 2011) Director of the project work has been assigned to me as follows

1- Follow up the implementation of the rehabilitation project and renovation of the Holiday Inn in Riyadh
2- Preparation of shop drawings and implementing and monitoring the implementation of the electrical work to the draft Community College - University of Jazan \[sub-stations including MV&LV Swithgears, MV&Lv Cables laying, testing&Commissioning as per specification, Lighting and power, low current systems (fire alarm _Telephone, DATA network, Sound, BMS, system Grounding&lightining protection system) layouting, testing, commissioning &provide asbuilt drawing.
3_ Follow up the implementation of electrical main gates - Jazan University.

4- Continuing the implementation of the electrical work of the Chamber of counters and Nutrition, Faculty of Science and Community at the University of Jazan (lighting circuits and power _ to extend the medium voltage cables)
5- Monitor the implementation of the electrical work for building supervision in University (lighting and power - low current systems (fire alarm _ telephone)
6- Follow up the implementation of the electrical work for building the Promotion of Virtue and Prevention of Vice in Jizan ( lighting and power - low current systems (fire alarm, DATA, telephone, matv)
7- Follow up the implementation of the electrical work for an infrastructure project in University (Stations compact - external lighting)

مهندس كهربائى à Al Rajhi Contracting company
  • Arabie Saoudite - Buraydah
  • juillet 2007 à janvier 2008

Al Rajhi Contracting company - Riyadh - Saudi Arabia (July 2007 - January 2008) the profession of electrical engineer and work has been assigned to me as follows.
Preparation of shop drawings and follow up the implementation of electrical work Sohar project Buraydah (Villa 460 130 building + Tower 56 floors) of the cost of 3 billion Saudi Riyal

مهندس كهربائى à شركة مداد للتطوير العمرانى
  • Arabie Saoudite - Riyad
  • janvier 2007 à juin 2007

Work for a company Midad urban development - Riyadh - Saudi Arabia (January 2007 - June 2007) the profession of electrical engineer and work has been assigned to me as follows.

* Follow-up implementation of the electrical work the company projects (schools for girls in Riyadh)
* A study of the cost of electrical work ( royal palaces _ Building inventory control at the Ministry of Health)

مدير مشروع à AL - Rafgha Contracting Est. Dammam - Saudi Arabia
  • Arabie Saoudite
  • mars 2006 à septembre 2006

AL - Rafgha Contracting Est. Dammam - Saudi Arabia (June 2004 - September 2006) and the work was entrusted to me as follows.

Project Manager à مؤسسة الرفقة للمقاولات
  • Arabie Saoudite - Dammam
  • juin 2004 à mars 2006

electrical engineer port Raqa'i (June 2004 - March 2006
1-Follow up the operation and maintenance (lowvoltage and the MV circuits - cables and overhead lines, low voltage, Switch gear and medium power transformers _ R.O plant, - sewag treatment plants, electrical control circuits _ electric wells)

electrical engineer à American of the Egyptian Company for Dyeing and processing
  • Egypte - Damietta
  • juin 2003 à avril 2004

American of the Egyptian Company for Dyeing and processing of new Damietta - Arab Republic of Egypt profession an electrical engineer, was the work assigned to me.
Monitoring the operation and maintenance of all machinery and electrical circuits (control circuits - low voltage circuits - circuits MV) campany

Éducation

Baccalauréat, Engineering & Power
  • à جامعة المنصورة - كلية الهندسة
  • juin 2001

B. SC. Engineering & Power and electrical Machines University: ALMansoura- - - Year of Graduation: June 2001 - Graduation Project: power factor improvement by using PLC ( programmable Logic Control) with grade excellent Profession Electrical engineer-

Baccalauréat, هندسة قوى والات كهربائية
  • à جامعة المنصورة كلية الهندسة
  • juin 2001

Specialties & Skills

Electrical Engineering
Team Management
CIRCUITS
DRAWING
ENGINEER
FIRE ALARM
LIGHTING
LOW VOLTAGE
MEDIUM VOLTAGE
SHOP DRAWINGS
TELEPHONE
TESTING
تحمل العمل تحت الضغوط

Langues

Arabe
Expert
Anglais
Expert

Adhésions

الهيئة السعودية للمهندسين
  • مهندس كهربائى
  • March 2011

Formation et Diplômes

تدريب بمحطة سماد طلخا (Formation)
Institut de formation:
محطة سماد طلخا
Date de la formation:
June 1997
تدريب بمحطة كهرباء طلخا (Formation)
Institut de formation:
محطة كهرباء طلخا
Date de la formation:
June 1996