حيدر مجيد, Construction lead

حيدر مجيد

Construction lead

wood

البلد
العراق - البصرة
التعليم
بكالوريوس,
الخبرات
10 years, 6 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :10 years, 6 أشهر

Construction lead في wood
  • العراق - البصرة
  • أشغل هذه الوظيفة منذ يوليو 2016
Construction Supervisor في Mechanical & Piping
  • أشغل هذه الوظيفة منذ يناير 2016

WCT Wet Oil Treatment M130 by Contractor CPECC, EPC project Improvement oil to Train C in DS06 with1
capacity 50000bpd.
.Contractor CPECC, EPC

Mechanical Engineer في ANWAR SOURA FOR GENERAL CONT. CO. LTD
  • يناير 2010 إلى يناير 2011

Basra Sport City)
stadium, 8 Hotels. I responsible ofThe project consist of Main stadium, Secondary*
installation HVAC with ducting system and Firefighting pipes for all building.
Review on Drawing and specification of project.*
Check shop drawing and submitted to manufacture Co. to get approve.*
Method statement about installation equipment and construction duct with pipes.*
Identification all as per code apply from manufacture and stander for example (ASHRE, *
ACNA, ASME)SM
Inspection materials and equipment and get approve to use before start the work.*
Check all sleeve and holes with civil department according to drawing final version.*
r depart such as Electrical, Coordinate the works when begin installation with othe*
Communication, Plumbing and all of them it is call MEP.
Supervision on fabrication air duct through workshop.*
Follow work subcontractor at the site and confident it of report.*
unit, here are different system as Package unit, spiltFollow installation air condition units and t*
system.VRVAHU,
Testing & operation units.*
Keeping As Built drawing and send one copy to Maintenance Depart.*
o.)I am got on approved on hotel drawing it is show HVAC with Ducting system from (360 C*
Team Leader 2011-2013
FOW Terminal Project (client Leighton) and Majnoon oil field (Client Shell SIPD)-AlRatba’a Contracting GCC LCC
paint, In terminal area.2000m2 on three layerteam for pipeline 48"painting and blastingLead*
Quality Control for site activities with submitted inspection request.*
..Scaffolding for two types Cube lock & Tubing fitting in MajnoonOil FieldractioneSupervisor support*
with PTW.permit to work with job hazard analyses JHA and completed all certificate attachedPrepare*
in work.ness people what is a HazardTool box talk TBT every day before work and aware*
Shutdown plant, Make sure fromteam those support client supervisor duringMechanicalPrepare*
drawing.depart as the highlight place of spadeoperationsubmittedIsolation drawing
Supervision on cleaning vessel with storage tank.*
Succeed carried out cleaning Vessels and Storage tanks in DS01, 02 in Majnoon and keep client happy.*
Prepare team of the work as a listed and what are course need them.*
and Monthly reports.Responsible on write Daily*
Mange core team responsible on maintenance pipe leakage and replacement pipes in different areas*
in field.
as per scope of work.Flow line constructionSupervision on*
Follow steps construction activity these are mention in mouthed statement and approved.*
Qc. Engineer Mechanical and Welding 2013-2014
Leighton Group (HLG) subcontract withHabtoor
Weatherford in Zubair Oil Field for project (Initial production Oil IPF 200, 000P) Client ENI.
The project and consist of Storage Tank 7items and piping (open and close drain) for 4*
water pipes HDPE material.and firetrains
Follow all the mechanical documentations for project (Application stander code, Drawing*
specification for materials.and
built" drawing.-Ensure all modification are on "as*
ection & test plan inspection Checklist details of inspection requirements, Quality plan insp*
procedure & record requires.Inspection
Check and inspection materials in lay down area such as pipes and plates of tank as for*
mension etc...Thickness, Di, Direction
Check consumable materials at container that used it welding storage tank.*
Check calibration for equipment and devices that use for project.*
Check and keeping all certificate for equipment submitted from subcontractor.*
Welding procedure we have in project several WPS and PQR for pipes and tank and there is*
approved from all sides with Third party B.V.
to be Before, During, After welding as per WPSWelder qualification and that process*
approved.
sure from fabrication before welding and attached by reports.akeM*
Visual inspection for welding and fixed at reports.*
nspector.Check all reports for different NDT methods for welding and come it from i*
Coordinators for the IRF before inspection at the site*
Ensure and quickly close NCR clients this way give good thrust at the work.*
I did welders qualification for piping HDPE (destructive Test, Tensile Test).*
re of piping carbon steel and HDPE according to procedureWitness for Hydro test pressu*
apply from manufacture and method of statement.
Test package for piping in IPF.Prepare*
Checklist about installation equipment above foundation or skid.*
to Qc departmentitsubmittedSign all documentation and*
Mechanical Field Engineer 2014-2015
Unaoil JV SULZER in Rumaila Oil Field.
Clients (ROO Rumaila Operation Organization including BP, SOC, CNBC)
The work special rotating equipment GT (Gas Turbine Ruston TA1250 TA1750, MOP main oil*
pump and water injection pump that use to well injection)
Overview for our work remove GT (Turbine & pump) form south Rumaila and mobilize to*
BISH, workshop for doing REFUR
Check PTW and make sure from isolation source energy with operation depart.*
Check lifting plan for equipment and attached with PTW after get approve from ROO.*
Safety First, Requirements PPE and Gas Tester 4gas and TBT for staff.*
move and take off parts of equipment such as read the alignment and highlightCareful to re*
for each one.
Housekeeping and clean area when finish the work.*
Weekly P.M reports for all GT in SOC plants.*
for degassing stations.Maintenance for equipment’s (GT) when the clients did shutdown*
Argent job for GT and water pump as assessment error and replace the parts.*
Check surveying for new GT for example (Foundation, piping, standardization)*
WORKSHOP
(1) Dismounting parts pump and turbine as per drawing.*
by visual and PTI for internal parts as impeller shaft blade or like.(2) NDT*
(3) Notarization all impact for parts by reports.*
(4) General mechanical work as balance grinding cutting washing fabricate etc.*
mension, Gab, Fill, Dial etc…(5)Quality for parts rotating equipment such as di*

Maintenance Supervisor في LG Electronics Co
  • يناير 2008 إلى يناير 2009

refrigeration Units.Maintenance HVAC &*
Refurbish HVAC units in workshop and reinstall inside building.*
Manage spares parts workshop store.*
Installation HVAC such as Roof Air package and Ceiling & split units.*

الخلفية التعليمية

بكالوريوس,
  • في Technical Engineering college of Basr
  • يناير 2007

NDT Level II from ASNT-TC-1A for five method (VT,RT ,UT, MPT,LPT).

بكالوريوس, mechanical
  • في Technical college
  • يونيو 2006

Specialties & Skills

Team Leadership
Site Controller
Health Safety and Environment
Piping and PipeLine
GRAPHIC DESIGN
MECHANICAL
OIL PAINTING
PAINTING
QUALITY
QUALITY CONTROL
SUPERVISORY SKILLS
CUSTOMER RELATIONS

حسابات مواقع التواصل الاجتماعي

الموقع الشخصي
الموقع الشخصي

لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.

اللغات

الانجليزية
متمرّس

العضويات

نقابة المهندسين
  • مهندس برتبة مجاز
  • February 2008

التدريب و الشهادات

construction management (الشهادة)
تاريخ الدورة:
January 2023

الهوايات

  • السفر والرياضة والسباحة