Responsible for the QA/QC of the HVAC & Plumbing system installation, in charge in managing the following tasks:
• Ensure the project plan and procedures are activated at site. Perform inspections of installations.
• Develop and maintain inspection procedures and techniques, throughout the construction
• Report on daily inspection and testing activities and issuing non-conformance reports when the specification or procedural requirements are not met.
• Maintain inspection and testing records.
• Conduct surveillance on the inspection tests required in the technical provisions of the specification.
• Ensure that all the materials purchased and processed for the manufacturing are handled in a manner that ensures that no damage or deterioration occurs.
• Responsible for establishing the requirements for the handling of products.
• Ensure that all personnel obtain the information they need to execute production in accordance with customer requirements
• Responsible for plumbing design including water, gas, storm and waste piping sizes for buildings.
• Selected and specified plumbing equipment, water heaters, and fixtures complying with ADA requirements.
• Designed plumbing layouts for new hospitals, offices and school constructions.
• Designed Fire sprinklers system for hospitals and their parking building.
• Provide Riser diagram schematic for water and fire system.
• Reviewed and edited previous layouts for use in new buildings.
• Worked with a team of engineers and contractors to design and implement blueprints for water systems.
• Used specific guidelines set by the client to design water and drainage systems paying close attention to client requests
Senior Mechanical Engineer in charge of HVAC & Plumbing System Design and Quality Assurance
During Mr. Meshmesh’s time as Sr. Mechanical Engineer, he acted as project manager for mechanical design, in charge of managing the following tasks:
• Engineering heat & cooling load calculations to determine air conditioning and heating equipment sizing.
• Selection and specifying the Air conditioning equipment for installation on buildings.
• Adapting specifications to specific job requirements.
• Plumbing design including water, gas and waste piping sizes for buildings.
• Select and specify plumbing equipment, water heaters, fixture complying with ADA requirements.
• Undertake site survey visits for the purpose of reviewing technical compliance to the new building layout.
• Site observations and report writing for compliance of construction to plans and specifications.
• Preparing energy calculation report.
• Produce supplementary drawings and clarifications to specifications as required.
• Prepare of a punch list of incompleted items at project close out.
• Review technical submittals for compliance with the design requirements.
• Review and comment on material sample submissions.