Preparations the tender documents of EPC(Engineering Procurement Construction) contract of the rehabilitation project of 20 transformers as follow:
1. No. of 13 transformers 15.75/500 KV, 235 MVA, in ASWAN HIGH DAM.
2. No. of 5 transformers 11/132 KV, 51, MVA in ASWAN DAM No.I.
3. No. of 2 transformers 11/11/132KV, 160 MVA, in ASWAN DAM No.II.
Preparations the tender documents of EPC contract of the rehabilitation project of 4 generation units in ASWAN DAM No.II
Very knowledgeable about FIDIC contracts.
Very knowledgeable about scheduling, budgeting, and resource allocation.
Participation in the evaluation of the applicants to get the prequalified contractors.
Preparations the tender documents of implementation consultant of the rehabilitation project of 20 transformers.
Participation in the evaluation of the technical and financial offers of the implementation consultant.
Preparation of the technical and contractual replies for the clarifications submitted from the contractors during the bidding period.
Preparations the tender documents of EPC contract of the rehabilitation project of automatic voltage regulator of the generation units of Aswan-1 Hydro Power Plant.
Preparation of the pre bid meeting and site visit of the pre-qualified contractors.
Participation in the pre award negotiations with the consultants and contractors.
2
I gained the following experiences in the field of project management:
Communication Skills:
Working with a team of professionals, as well as communicating with clients and stakeholders. as well as your ability to present technical information in a clear and concise manner.
Problem-Solving Skills:
Getting a proven track record of identifying and resolving project issues and problems. Analyzing problems, identifying root causes, and developing effective solutions.
Leadership Skills: Ability to lead, inspire and motivate a team towards achieving a common goal.
Time Management:
Manage deadlines and handle multiple tasks at once, developing and maintaining project schedules and ensuring project milestones are met.
“I have completed a 40-hour training course on project management at the Egyptian Engineers Syndicate, and I am currently preparing to take the PMP certification exam offered by the American Institute for Project Management”
Work in the following projects :
DUBA GREEN 380/ 132kV SUBSTATION.
TABUK 380/132/33 KV BSP.
ALWAHA 380/110/13.8Kv BSP.
MODON-2 110/33/13.8kV S/S.
TABUK-11 132/13.8kV S/S.
The detailed activities:-
110 KV GIS Full Test, and scheme check.
132 KV GIS Full Test, and scheme check.
380 KV GIS Full Test, and scheme check.
33 KV & 13.8 KV SWG Full test & Scheme check.
Transformer Stability Test, AVR Configuration & Scheme check,
ABTS & ACCS Scheme check,
380 KV BUS BAR System configuration, Test and Stability
110 KV BUS BAR System configuration, Test and Stability.
33 KV, 13.8 KV BUS BAR System configuration, Test and Stability
33 KV, 13.8 KV BUSBAR & Cables High Voltage Test .
Scheme Check for Line Feeders, Transformers, Capacitors protection paneles.
Line Differential Protection Relays Test (MICOM & SIEMENS) .
Sub Station Trip Tests.
Sub Station Grounding Test.
Sub Station Services Test (ACDB & DCDB, Lighting panels ….ets)
High knowledge for the optimized schematic drawings .
High knowledge for safety procedure of Saudi Electricity Company.
High knowledge for the projects filling system and hand over to SEC.
* Installing, pre-commissioning and commissioning, testing and maintenance of the electromechanical, static, digital and numerical protective relays (ABB, BBC, SIEMENS, , ..) for power generation station, HV substation and HV transmission networks.
Installing, pre-commissioning and commissioning, testing and maintenance of the synchronization digital devices for generation units and transmission lines (15.75, 220, 500 kV).
Installing, pre-commissioning and commissioning, testing and maintenance the control and protection circuits for LV and HV Circuit Breakers (15.75, 220, 500 kV).
Installing, pre-commissioning and commissioning, testing and maintenance protection equipments for AC & DC station services (11 kV, 6.6 kV, 0.4 kV AC, 220 V DC).
Installing, pre-commissioning and commissioning and testing voltage & current transformers.
Use Hi-tech tools such, OMICRON CMC 356 test set and Double F6150 test set.
Power system analysis and fault studies.
Operating & supervision of 2220 MW (12) generation units (12 × 185 MW), 12 step up transformers (12×206 MVA, 15.75/500 kV), with their protective relays. In addition, operating and supervision their AVRs and the speed governors.
Controlling and Adjustment the frequency & voltage of Egyptian network.
Operating & supervision of 500& 220 kV switchyards including bus bars,
Operating & supervision transmission lines (500& 220 kV), CBs (500& 220 kV), reactors (500 kV, 165 MVA), transformers (15.75/500 kV), and double autotransformers (500/220/11 kV, 501MVA).
Monitoring, controlling & operating securely and economically the power station.
Installing, pre-commissioning and commissioning, testing and maintenance of the electromechanical and static protective relays (ABB, BBC) for HV substation and HV transmission lines.
Installing, pre\commissioning and commissioning, testing and maintenance the control and protection circuits for MV and HV Circuit Breakers (66, 132 kV).
testing and maintenance of 132 kV switchyards including bus bars and transmission lines.
Installing, pre-commissioning and commissioning, testing and maintenance of step down transformers (5×55 MVA, 132/30 kV), (3 × 32 MVA, 132/6 KV) with their protective relays.
Installing, pre-commissioning and commissioning, testing and maintenance of step down transformers ( 36× 6.4 MVA, 30KV/700V). feeding electrolysis cells.
Installing, pre-commissioning and commissioning, testing and maintenance of step down transformers (1×15 MVA, 132/30 KV), (1×12.5MVA, 30KV/180V) for Ferrosilicon furnace.
Installing, pre-commissioning and commissioning, testing and maintenance of Synchronous motors (5 × 4.3 MW, 6KV) and (5 × 662 KW, 6KV) with their protective relays.
Maintenance and testing low voltage control panels, 6 kV electrical panels and transformers
(5 × 500KVA, 6KV / 0.4 KV).
Academic Qualification FACULTY OF ENGINEERING; SOUTH VALLEY UNIVERSITY 1998– 2003 * Bachelor of Science (B.Sc.) degree in Electrical Power Engineering. * Project : Design of 132/33/11 kV substation. * Graduate degree: Very good