حجازي عبد العزيز, Senior Planning Engineer

حجازي عبد العزيز

Senior Planning Engineer

Omar Abu Saad & Sons Company

البلد
الأردن - عمان
التعليم
بكالوريوس, Civil Engineering
الخبرات
14 years, 2 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :14 years, 2 أشهر

Senior Planning Engineer في Omar Abu Saad & Sons Company
  • الأردن - العقبة
  • أشغل هذه الوظيفة منذ فبراير 2016

• Understand project scope and establish planning, scheduling & reporting requirements in line with Contract Agreement.
• Review and understand all relevant project documentation including scope of works, project execution plan, proposal / project schedule (including manpower projection plan), milestones, WBS, conditions of contract and identify risks or gaps in the Project Plan.
• Preparing the baseline schedule for the project, Create and prepare logical Work Breakdown Structure (WBS) while leading project team planning sessions related to structure and activities sequencing and developing resource loading.
• Determine the critical paths required to meet the overall project
completion date, modify critical paths based on prevailing conditions, and consult with project team members to develop workarounds to overcome obstacle
• Verify & consolidate resource requirements (manpower, equipment’s, tools/ consumables) based on norms and project schedule requirements.
• Planning, organizing, scheduling the activities using primavera 6 and monitoring the progress on site and updating the baseline program accordingly on monthly and weekly basis.
• Identify the potential areas of delay, highlight the critical events & suggest / provide mitigation measures and recovery plans to management.
• Controlling costs pertaining to Project, Monitoring / controlling man- hours, capturing additional /variation jobs.
• Extract look-ahead schedules and provide to Construction team for implementation.
• Developing and distribute project curves of progress, cost and manpower, including planned, actual and forecast figures
• Visiting the site and taking the updates and progress photographs and submitting them to client/consultant in a proper way.
• Preparing projects daily, weekly, Monthly and earned value (EV) Analysis reports (schedule/cost variance), including the progress percentages and the cash flow on regular basis.
• Submitting the notice to claim, variation order, cost claim, time impact reports
• Professional in preparing and submitting time impact analysis for the purpose of submitting and supporting extension of time claim (EOT).
• Coordinating with technical department for all shop drawings submission.
• Provide scheduling support to Contract Engineer regarding any variation or change order.

Planning Engineer في ARANER L.L.C.
  • الأردن - عمان
  • أكتوبر 2014 إلى يناير 2016

• Developing project master schedule, updating, monitoring and reviewing contractor construction schedules, submittals, material delivery, procurement logs and daily follow-up in addition to the necessary productivity measurement studies and associated corrective measures.
• Reviewing and approving contractor’s work programs submissions.
• Review the updated time schedules which are issued by the Contractor regarding match with the actual progress /logical links/durations and achievement of the planned progress on regular basis.
• Planning, organizing, scheduling the activities using primavera 6 and monitoring the progress site and updating the baseline program accordingly on monthly and weekly basis.
• Support Project management with ongoing project schedule and progress analysis, reporting and forecasting activities and advise them of any potential schedule issues and provide guidance on corrective actions and measures to mitigate any adverse trend.
• Conduct Periodic meetings with the contractors to review progress/activities and report on the status of the project to management.
• Prepare the curves for cash flow, manpower histogram.
• Preparing engineering and procurement schedules at varying levels of detail
• Preparing schedules for the manufactory and delivery of the equipment after coordinating with the manufactories in order to control the delivery dates of the equipment.
• Visiting the site and taking the updates and progress photographs and submitting them to client in a proper way.
• Preparing projects daily, weekly and monthly reports including the progress percentages and the cash flow for submission to Project Management, Client, and Consultant.
• Submitting the notice to claim, variation order, cost claim, time impact reports

Planning Engineer / Project Coordinator في Arabtec Construction Company
  • قطر - الدوحة
  • أكتوبر 2011 إلى سبتمبر 2014

• Managing and controlling the structural work progress and all required activities on site.
• Planning, organizing, scheduling the activities using primavera 6 and monitoring the progress site and updating the baseline program accordingly on monthly and weekly basis
• Visiting the site and taking the updates and progress photographs and submitting them to client/consultant in a proper way
• Preparing projects daily and monthly reports for submission to Project Management, Client, and Consultant.
• Coordinating Monthly target from site team to planning department.
• Attending relevant meetings at various stages of the project such as Production meetings; Monthly Target meetings; planning meetings; Formwork suppliers technical meetings; Sub-contractor meetings and any other meetings as requested by the Project Director and Project Manager.
• Placing all projects Formwork orders from various suppliers and coordinating shop drawings and deliveries.
• Placing all projects steel orders and coordinating with factory for delivery schedules and technical support.
• Coordinating Bid summaries for various site materials with commercial department depending on site requirements.
• Coordinating with technical department for all shop drawings submission and updating them with site progress to avoid any delays with submission.

Site Engineer في Saudi Bin Laden Group
  • المملكة العربية السعودية - الرياض
  • يوليو 2009 إلى يناير 2011

• Responsible for concrete structural designs for multi-stories and high raise buildings at King Saud University Project.
• Managing and controlling the structural work progress and all required activities on site.
• Review the structural calculation from the sub-contractor.
• Leading project team with full responsibility on-site.

الخلفية التعليمية

بكالوريوس, Civil Engineering
  • في Al-Balqa’a Applied University
  • يونيو 2009

Specialties & Skills

Glazing
Aluminum
Costing
Planning
Reconstruction
AUTOCAD
STAAD Pro
Premavera

اللغات

الانجليزية
متوسط
العربية
متمرّس

العضويات

Jordan Engineers Association
  • member
  • June 2009

التدريب و الشهادات

PMI-SP (Scheduling Professional) (الشهادة)
تاريخ الدورة:
November 2020
صالحة لغاية:
November 2023
PMP-Project Management Proffesional (الشهادة)
تاريخ الدورة:
February 2020
صالحة لغاية:
February 2023
• Project Planning using primavera (تدريب)
معهد التدريب:
Jordan Engineers Association
تاريخ الدورة:
December 2010
المدة:
24 ساعة
• Primavera 6 Advanced (تدريب)
معهد التدريب:
Jordan Engineers Association
تاريخ الدورة:
February 2013
المدة:
18 ساعة
• Construction projects, Control and scheduling (تدريب)
معهد التدريب:
Jordan Engineers Association
تاريخ الدورة:
February 2015
المدة:
21 ساعة