Commissioning Manager
SAS
مجموع سنوات الخبرة :10 years, 10 أشهر
Design of system configuration.
➢ System analysis and preparation of I/O list.
➢ Preparation for project submittals
➢ Hardware configuration of RTUs & BCUs.
➢ Designing system database.
➢ Design substation automation system visualization
➢ Carrying out IEDs configuration (ABB, GE, Siemens, Arcteq & Vamp).
➢ Supervise wiring interface installation between bay level and process level.
➢ Performing FAT and SAT procedures with customer.
➢ Configuring communications link to NECC “National Energy Control Center”
➢ Configuring communications link to CRCC “Cairo Regional Control Center”
Including the following projects
• Barket Ghelion Conventional (66/11 KV) \{Sprecher System\}
• El Obour Substation Automation System (220/66/22 KV) \{Sprecher System\}
• Al Mattar Substation Automation System (220/66/11 KV) \{Sprecher System\}
• MOSTKBAL City Substation Automation System (220/22 Kv). \{ ABB System\}
• Zahraa ElMokattam Substation Automation System (220/22 Kv). \{ ABB System