Hossameldin Zayed, Projects Manager

Hossameldin Zayed

Projects Manager

Arabco Construction

Lieu
Émirats Arabes Unis - Dubaï
Éducation
Baccalauréat, Civil Engineering
Expérience
22 years, 1 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :22 years, 1 Mois

Projects Manager à Arabco Construction
  • Émirats Arabes Unis - Dubaï
  • Je travaille ici depuis mai 2021

Projects Manager

PROJECT MANAGER à Al Habbai Contracting
  • Émirats Arabes Unis - Dubaï
  • septembre 2017 à septembre 2020

Project Description: Execution, completion, maintenance of the project comprised of 4 stars Hotel Building (2B+G+8Fl. +R), shoring, pilling, de-watering, excavation, with post tension reinforced concrete skeleton, block walls, GRC cladding, Aluminum cladding, timber wall cladding, SS cladding, wall paper, Gym, SPA, swimming pool, and epoxy coating parking, including all Green Buildings requirements, with total built up area of 171, 439.4 Sq.ft.
Contract Value: AED 85, 000, 000.00

Construction Manager à Shapoorji Pallonji Qatar
  • Qatar - Doha
  • janvier 2016 à juillet 2017

Project: New Doha Port Project
Location: Mesaied
PMC: AECOM
EDC: Worley Parsons
BDC: Arab Engineering Bureau
Main Contractor: HBK-AFCONS JV
Contract No.: NPP 0032 - Commercial Terminals D&B Building
(Afcons is sister company of Shapoorji Pallonji Qatar)

Construction Manager à Urbacon Trading & Contracting
  • Qatar - Doha
  • juillet 2014 à décembre 2015

Project Description:
Sheraton Doha Resort & Convention Hotel is a luxury 5 star business
hotel in Doha, the hotel features 371 of the best hotel rooms in Doha including a select collection of 64 luxurious suites., The scope of work comprises of major renovations and refurbishments. All guest rooms, public areas, facilities, restaurants, and conference and meeting spaces had been modernized
Contract Value: QR 2.5 Billion (2, 500, 000, 000.00)

Roles and Responsibilities:
Oversaw all the corner rooms (5 Head of State + 10 Junior Suites) & majlis, dining, & kitchen areas in the floors from 1st. to 5th.
The work scope includes modification of layouts, gypsum walls, ceiling renewing & all the finishing works such as painting, wall paper, wood wall cladding, marble, carpets, curtains, sanitary wares, light fittings, furniture…etc. with a very high quality materials & application methods.
Organizing the work packages, identifying and proposing solutions to problems encountered, recorded and reported variances.

TECHNICAL MANAGER à Hassanesco Trading & Contracting
  • Qatar - Doha
  • juin 2011 à mai 2014

PROJECT: Police Training Institute.
CONSTRUCTION MANAGER.

Project Description: This project is located in Abu Nakhlah, Salwa Road, Doha, The scope of work for this contract comprises of the construction, completion, commissioning & maintenance of Police Training Institute buildings. The construction includes isolated foundation, post tension slabs, with block and plaster with painting walls, UPVC windows, Acoustic Walls & Ceiling, infrastructure works, swimming pool, Football Field, Racing Track & landscape.
Contract Value: QR 700, 000, 000.00

Roles and Responsibilities: Oversaw all critical elements of project execution right from initiation to handover and assumed responsibility for completion of projects.
Chalk out programs of daily activities showing detailed manpower and equipment allocation.
Conduct milestone checks to assure the project's completion and assumed responsibility for project performance in accordance with targets.
Rendering guidance and mentoring on work conducted by the junior staff in addition to serving as a resource for clarification on problems encountered by junior engineers.
Organizing the work packages, identifying and proposing solutions to problems encountered, recorded and reported variances.

PROJECT MANAGER à Al Habbai Contracting
  • Émirats Arabes Unis - Dubaï
  • avril 2010 à juin 2011

PROJECT: Emirates National Bank of Dubai, Al Qiyada Branch.

Project Description: Al qiyada branch is one of the ENBD projects in Dubai, which is located inside Dubai Police General Head Quarters & will have a total built-up area of 1500 m²; the proposed building is basement + ground +one floor commercial bank building, with underground car parking,
The project also includes landscaping and internal design matching with M/s. Civil Defense requirements, & M/s. Dubai Municipality instructions.
Contract Value: Dhs. 11, 800, 000.0

Roles and Responsibilities: Undertaking in line with client specifications, constraints and deadlines.
Oversaw the scheduling of major construction inspections to ensure contractual compliance with plans, specifications, materials, schedules, workmanship and safety standards.
Providing operational staff with resources and orientated them toward proficiency with specialized functional components and systems.
Conduct the weekly progress meeting with the client and all the technical meetings with consultant and operational staff.

Construction Manager à Al Habbai Contracting
  • Émirats Arabes Unis - Dubaï
  • mai 2008 à mars 2010

PROJECT: Port Saeed Project

Project Description:
This project is located near Deira City Center, Port Saeed, Dubai. The scope of work for this contract comprises of the construction, comple-tion, commissioning & maintenance of (2B+G+M+12 floors) office building & furnished apartments. The construction includes shoring system, piling foundation, pile caps, raft foundation, post tension, with block walls, aluminum cladding, swimming pool, sauna, steam, central air-conditioning & landscape.
Contract Value: Dhs. 174, 963, 000.0

PROJECT ENGINEER à Al Habbai Contracting
  • Émirats Arabes Unis - Dubaï
  • juillet 2006 à avril 2008

PROJECT: Business Bay Project

Project Description: This project is located in Business Bay, Dubai. The scope of work for this contract comprises of the construction, completion, commissioning & maintenance of (3B+G+19 floors) Hotel Tower for Mr. Abdulsalam Mohamed Saeed Al Rafi. Consist of 342 rooms, 42 suites. The construction includes shoring system, piling foundation, pile caps, raft foundation, post tension slabs, with block walls, aluminum cladding, swimming pool, sauna, restaurants, laundries, car parking, services area, central air-conditioning, and other more facilities.
Contract Value: Dhs. 175, 000, 000.0

Roles and Responsibilities: Undertaking feasibility studies, site investigations and developing detailed designs to assess the potential risks of the project.
Spearheading and integrating all efforts of engineering, planning and resource mobilization toward project execution in line with client specifications.
Implementing construction drawings and specifications, ascertain project scope with particular emphasis on contractual details in collaboration with engineering team.
Coordination between various subcontractors (Post tension, MEP ..)

PROJECT ENGINEER à AL TARMEEM CONTRACTING
  • Émirats Arabes Unis
  • août 2005 à juin 2006

Aug. 2005 - June 2006 AL TARMEEM CONTRACTING. DUBAI, UAE.

PROJECT: Compound Residential Villas
PROJECT ENGINEER.

Project Description: Category: Residential villas (G+2 Floors)
Consists of 4 villas, medical center, swimming Pools, health center, steam baths, restaurants, cafes, shops and car parking.
Contract Value: Dhs. 10, 000, 000.0

Roles and Responsibilities: Undertaking feasibility studies, site investigations and developing detailed designs to assess the potential risks of the project.
Spearheading and integrating all efforts of engineering, planning and resource mobilization toward project execution in line with client specifications.
Implementing construction drawings and specifications, ascertain project scope with particular emphasis on contractual details in collaboration with engineering team.
Coordination between various subcontractors (Post tension, MEP ..)

PROJECT ENGINEER à Trans Emirates Trading & Contracting
  • Qatar - Doha
  • novembre 2004 à juillet 2005

PROJECT: Al Saad Residence

Project Description: Category: Residential Building (B+G+8 Floors)
The scope of work for this contract comprises of the construction, completion, commissioning & maintenance of the building which includes shops, car parking, swimming pool, and residential flats.
Contract Value: QR. 10, 000, 000.0

Roles and Responsibilities: Undertaking feasibility studies, site investigations and developing detailed designs to assess the potential risks of the project.
Spearheading and integrating all efforts of engineering, planning and resource mobilization toward project execution in line with client specifications.
Implementing construction drawings and specifications, ascertain project scope with particular emphasis on contractual details in collaboration with engineering team.
Coordination between various subcontractors (Post tension, MEP ..)

PROJECT ENGINEER à Abo Shabana Contracting Company
  • Egypte - Alexandrie
  • décembre 2003 à octobre 2004

PROJECT: Hilton Hotel Cafeteria

Project Description: This project is located in Ragab Ranch, King Maryout, and Alexandria, Egypt. The scope of work for this contract comprises of the construction, completion, commissioning & maintenance of Hilton Hotel Cafeterias with full finishes. Also includes 48 horses houses (Boxes), swimming pool, pool deck, and other more facilities.
Contract Value: L.E. 7, 000, 000.0

Roles and Responsibilities: Undertaking feasibility studies, site investigations and developing detailed designs to assess the potential risks of the project.
Spearheading and integrating all efforts of engineering, planning and resource mobilization toward project execution in line with client specifications.
Implementing construction drawings and specifications, ascertain project scope with particular emphasis on contractual details in collaboration with engineering team.
Coordination between various subcontractors (Post tension, MEP ..)

SITE ENGINEER à Abo Shabana Contracting Company
  • Egypte - Alexandrie
  • septembre 2002 à novembre 2003

PROJECT: Factory for M/S. Steel Trade Company

Project Description: This project is located in Omm Zeghaw, Kilo21, Alexandria, Egypt. The scope of work for this contract comprises of the construction, completion, commissioning & maintenance of steel structure factory with piles foundation, pile caps, & reinforced concrete slab on grade with hardener chemical additives.
Contract Value: L.E. 3, 000, 000.0

SITE ENGINEER à Abo Shabana Contracting Company
  • Egypte - Alexandrie
  • août 2001 à septembre 2002

PROJECT: Mena Green House

Project Description: This project is located in Al Montazah, Alexandria, Egypt. The scope of work for this contract comprises of the construction, completion, commissioning & maintenance of 2 buildings (B+G+8 floors), with raft foundation, reinforced concrete hurdy slabs, block walls, plaster, paint, & ceramic tiles finishes.
Contract Value: L.E. 1, 800, 000.0


Thanks & regards.

Éducation

Baccalauréat, Civil Engineering
  • à Alexandria University
  • juin 2001

Jun 2001 Bachelor of Science in Civil Engineering Alexandria University, Egypt.

Specialties & Skills

Budget Negotiation
Quantity Surveying
Resource Management
Site Supervision
Construction Management
ACOUSTIC
CONSTRUCTION DRAWINGS
ENGINEER
PAINTING
PROJECT ENGINEER
SITE INVESTIGATIONS
operation
procurement
project planning
materials
project execution

Langues

Arabe
Expert
Anglais
Expert
Urdu
Débutant

Adhésions

Egyptian Engineers Syndicates EGYPT
  • Member
  • July 2001
Society of Engineers UAE
  • Member
  • August 2006
Dubai Municipality
  • Unlimited
  • January 2018

Formation et Diplômes

MSAP – Trakhees Accreditation Program (Formation)
Institut de formation:
Trakhees - Dubai
Date de la formation:
January 2018
OSHA – Safety Training Course of Construction Industry (29 CFR 1926) (Certificat)
Date de la formation:
November 2010
LEED Green Associate & LEED AP. (Certificat)
Date de la formation:
April 2014
CPW Training Certificate (Formation)
Institut de formation:
Qatar Petroleum
Date de la formation:
August 2016

Loisirs

  • Chess , Reading