A responsible Site Engineer at the following Sites :
1- Borg el Arab Airport project, Alexandria, Egypt
-Executed Projects :
- R. C. (Formwork & R. F. T.) & Casting (columns - beams) .
- Finishing of the whole buildings (masonry \{ hollow block & solid \} - cement
plaster \{ accessories\} internally and externally - porcelain - marble and granite
works - thermal bricks - paints - curtain wall, windows & doors -external
elevations - mosaics - fire rated between beams and masonry - false ceilings
\{gypsum board, alum. Panels \} & gypsum board partition- vinyl &carpet after
screed works - steel doors - raised floor) .
Total Cost = 800 millions L.E.
2- TERGA Power Plant combined cycle 3*400 MW, Algeria, OCIA
-Executed Projects :
- R. C. (Formwork & R. F. T.) & Casting (slabs - beams).
- Finishing of the whole buildings (masonry - cement plaster internally and
externally - porcelain - marble and granite works - thermal bricks - paints -
curtain wall, windows & doors (Alico) - steel doors & frames (France Metal) -
external elevations - mosaics - false ceilings - gypsum board partition &
walls - raised floor - epoxy paint floors and walls - cladding wood for wallsplumping
works (drainage & water supply)) .
3- Marassi, SidiAbd El Rahman, North Coast, Egypt
-Executed Projects :
- Finishing of the whole buildings (masonry - cement plaster internally
and externally - porcelain - paints - false ceiling - marble - …..).
| P a g e 3
4- King Abdulaziz International Airport new Project, Jeddah, K.S.A.
-Executed Projects :
- Tunnels work
Blinding concrete & screed after isolated & R. C. (Formwork & Reinforcement )
& Pouring concrete for (base slabe - walls - top slabe) .
Use scaffolding (R.M.D.) for pouring .
- Infrastructure (Utilities)
Excavation & backfilling (bidding and soil ) & isolation for manhole and catch
basin & reinforcement and formwork for manhole .
R.C. Box culvert (reinf. and formwork) two cell & isolation and backfilling .
- Finishing of the whole buildings (masonry - cement plaster internally and
externally - dry wall ( fire rated gypsum board) -porcelain - paints - install
doors -epoxy paint -…..).
-Executed Projects :
- P. C. & R. C. (Formwork & R. F. T.) & Casting (foundations - columns - Flat
slabs - stairs - Roof slabs) .
- Chemical Isolation and Curing of P. C. & R . C. (under tie beams & tie beams &
foundations & neck columns ).
- Excavation & Filling-up & Soil Compaction.
- Total Cost = 10 millions L.E.
At The B. E. C. (Bishbishy Engineer Company)
A responsible Site Engineer at the following Sites :
1- PharosUniversity in Alexandria (Campus of theoretical colleges)
- Executed Projects :
- Formwork & R. F. T. & Casting \[Foundations (isolated footings) - Skeletons
(columns - beams - stairs - slabs - classrooms)\].
- Chemical isolation and curing of reinforced concrete.
- Isolation of construction joints ( vertical& horizontal ).
- Excavation & Filling-up &Soil Compaction.
| P a g e 4
- Finishing of the whole buildings & landscape (brick work - plaster - ceramics -
marble - thermal bricks - paints - wooden works -external elevations -
mosaics - plinth) .
- Plumping works (drainage & water supply).
- Total Cost = 25 millions L.E.
2- CinemaGreenPlaza&Alaalamia mall
-Executed Projects :
- Formwork & R. F. T. & Casting \[Foundations (isolated footings) - Skeletons
(columns - beams - stairs - hollow blocks - slabs - classrooms)\].
- Construction joint between concrete and steel structure.
- Chemical isolation and curing of reinforced concrete.
- Excavation & Filling-up & Soil Compaction.
- Finishing of the whole buildings & landscaping \[ brick work - plaster -
ceramics - marble - paints - mosaics - wooden works e.g. ( beech wooden
trim - beech wooden skirting - beech panel - M.D.F. …. etc. ) - fire rated
gypsum board - rock wall of density 100 kg/m2 - decorative acoustical -
stainless steel back lighted - corian - repainted steel door - wire mesh -
handrail steel - vinyl - carpet - lighting fixture - rod light - external elevations
- plinth \] .
- Plumping works (drainage & water supply).
- Technical office (make the list, quantity survey)
- Total Cost = 5.5 millions L. E.
3- Construction of Hall of Celebrations & Conferences of pharos
International University)
-Executed Projects :
- Formwork & R. F. T. & Casting \[Foundations (isolated footings) - Skeletons
(columns - beams - stairs - slabs\].
- Construction joint between concrete and steel structure.
- Chemical isolation and curing of reinforced concrete .
- Excavation & Filling-up & Soil Compaction.
- Finishing of the whole buildings & landscaping \[ brick work - plaster -
ceramics-marble-paints-mosaics-wooden works- gypsum board -( G . R. C. &
Artificial stone ) for external elevations and internal elevations & plinth \]
- Total Cost = 12 millions L. E.
At MURRAY & ROBERTS Company.
A responsible Site Engineer in San Stefano Hotel (working in repair dept.)
-Executed Projects:
- Formwork (scaffoldings) & R. F. T.& Casting &( fountains - slabs) .
- Chemical Isolation of fountains .
- Approximate Total Cost = 6 Billions L. E.