مهندس مكتب فني
NEM Energy Egypt
مجموع سنوات الخبرة :18 years, 10 أشهر
1- CHECK JOINTA FIT UP AND MATERIAL TO ENSURE THAT BASE META AND FILLER METRIALS ARE ACCEPTED TO W.P.S
2- VISUAL CHECK BEFORE DURRING AND AFTER WELDING
3- Responsibilities: review drawing, visual inspector, check dimension
4- MAKE CUTTING PLANE-CUTTING LIST-WELDING MAP-AS BUILT FOR D.W.G.
CHECK JOINTA FIT UP AND MATERIAL TO ENSURE THAT BASE
META AND FILLER METRIALS ARE ACCEPTED TO W.P.S
VISUAL CHECK BEFORE DURRING AND AFTER WELDING
Responsibilities: review drawing, visual inspector, check dimension
MAKE CUTTING PLANE-CUTTING LIST-WELDING MAP-AS BUILT
FOR D.W.G.
CHECK JOINTA FIT UP AND MATERIAL TO ENSURE THAT BASE
META AND FILLER METRIALS ARE ACCEPTED TO W.P.S
VISUAL CHECK BEFORE DURRING AND AFTER WELDING
Responsibilities: review drawing, visual inspector, check dimension
MAKE CUTTING PLANE-CUTTING LIST-WELDING MAP-AS BUILT
FOR D.W.G.
CHECK JOINTA FIT UP AND MATERIAL TO ENSURE THAT BASE
META AND FILLER METRIALS ARE ACCEPTED TO W.P.S
VISUAL CHECK BEFORE DURRING AND AFTER WELDING
Responsibilities: review drawing, visual inspector, check dimension
MAKE CUTTING PLANE-CUTTING LIST-WELDING MAP-AS BUILT FOR D.W.G.
CHECK JOINTA FIT UP AND MATERIAL TO ENSURE THAT BASE
META AND FILLER METRIALS ARE ACCEPTED TO W.P.S
VISUAL CHECK BEFORE DURRING AND AFTER WELDING
Responsibilities: review drawing, visual inspector, check dimension
MAKE CUTTING PLANE-CUTTING LIST-WELDING MAP-AS BUILT FOR D.W.G.
1- From: 12/4/2005 to 22/2/2006
Ganaklis Airport Creation 2nd Tip
2- From: 10/3/2006 to 21/4/2006
Cairo North Power Plant Phase II.
• WELDING INSPECTOR IN WORKSHOP AND SITE ACTIVITIES PIPING - PRESSER VESSELS - BOILER AND EQUIPMENTS
1- CHECK JOINTA FIT UP AND MATERIAL TO ENSURE THAT BASE META AND FILLER METRIALS ARE ACCEPTED TO W.P.S
2- VISUAL CHECK BEFORE DURRING AND AFTER WELDING
3- Responsibilities: review drawing, visual inspector, check dimension
4- MAKE CUTTING PLANE-CUTTING LIST-WELDING MAP-AS BUILT FOR D.W.G.
• WELDING INSPECTOR IN WORKSHOP AND SITE ACTIVITIES PIPING - PRESSER VESSELS - BOILER AND EQUIPMENTS
1- CHECK JOINTA FIT UP AND MATERIAL TO ENSURE THAT BASE META AND FILLER METRIALS ARE ACCEPTED TO W.P.S
2- VISUAL CHECK BEFORE DURRING AND AFTER WELDING
3- Responsibilities: review drawing, visual inspector, check dimension
4- MAKE CUTTING PLANE-CUTTING LIST-WELDING MAP-AS BUILT FOR D.W.G.
8- from 20/12/2008 to 15/10/2009
Sidi Krir & Al-Aft (Egypt)
Position: QA/QC INSPECTOR
Client: nem
Responsibilities: review drawing, visual inspector, check dimension
3- From: 25/4/2007 to 15/7/2007
GM Painting Line. (Egypt)
Leceince of Translation& Languages