Hossam Younis, •	VP, Operation Manager, Central Planning Manager,  Business Development Manager, M.R

Hossam Younis

• VP, Operation Manager, Central Planning Manager, Business Development Manager, M.R

Nile Linen Group Weaving, Bleaching, Dying and Confection of Textiles

البلد
مصر - القاهرة
التعليم
بكالوريوس, BCs
الخبرات
22 years, 8 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :22 years, 8 أشهر

• VP, Operation Manager, Central Planning Manager, Business Development Manager, M.R في Nile Linen Group Weaving, Bleaching, Dying and Confection of Textiles
  • مصر - الإسكندرية
  • أشغل هذه الوظيفة منذ يوليو 2017

• Analyzing business structures, procedures, processes, and the utilization of resources.
• Consulting with the human capital department to guide the utilization, development, or hiring of personnel.
• Leading business optimization initiatives by conducting individual or group training sessions for personnel.
• Contributing to the restructuring of departments to increase efficiency and align activities with business objectives.
• Optimizing personnel utilization by increasing cross-functionality and interdepartmental cooperation.
• Measuring the impact of interventions on staff performance, efficiency, employee retention, and job satisfaction.
• Advising executives and senior managers and recommending efficient and cost-effective solutions for identified challenges.
• Reduced manual effort required using new electronic programs
• Analyzed data, to evaluate all the team performance monthly
• Issue the monthly shipment plan to Sales team .update it weekly

• Quality Management, Quality Assurance, Quality Control Environment Manager, Social, H& Safety Audi في Nile Linen Group Weaving, Bleaching, Dying and Confection of Textiles
  • مصر - الإسكندرية
  • يوليو 2007 إلى يوليو 2017

• Administrate 400 Q- Team (Quality Control Engineers, Quality Control Inspectors, and central Lab, water treatment chemists) at 10 sites. Weaving, Finishing and Confections factories

• Instrumentation Strategies to ensure Optimum control of the all processes. (Weaving, Preparing, Dying Finishing and Confections of Textiles with Costs never been in excess of budgeted targets

• Leadership All Departments, my department (especially) to
Achieve "Signal achievement".

• Making Procedures. Manual and Work Instructions to Control all Process in machines works 24 hours at 7 Factories /13 site with Quality performance to customer is expected to be 0 PPM

• Performing analytical lab testing procedures which Support
The Control System

• GMPs, Pest Control Program, Cleaning, hygiene and
Sanitation Program

• Responsible of the maintenance program of the water treatment unit (R/O system). Treatment the wastewater to discharge in the sewer system

• Statically improvement methods and how it serves Improving
Products' quality and help each dept. to achieve its targets

• Implementing QMS, EMS , Eco-label, Oeko - tex, I-way, Q-way, SEDEX, My String System, BSCI social Audit & ISO SA8000, Fairtrade, GOTS, Egyptian cotton requirements in all Sites .

• a quarter annually audit on the plant applying the system requirements, Audit management

• Complaints complaint, Customer liaison and measurement the
Customer’s satisfaction

• Tracing for all products and CACP (Corrective Actions & Preventive Actions) for any unconformity case.

• Data Analysis:
Highlighting Of the Weak Points
Recommendation of Solving Problems...
Training & Recommendation of Qualified Persons

• Improvement Criteria:
Highlighting the Area of Improvement in Quality. Monthly Action Plans.
Weekly & Daily Meetings TO Track the Action Plan Progress.
• Reporting:
Daily, Weekly and Monthly. Performance Tracking. Charts
• Plant Visualization

Quality Managments Manager • Quality Assurance Manager • Environment Manager • FMCG • M.R. في New Marina Plast Company "Afia Multinational ".
  • غير ذلك
  • فبراير 2005 إلى يوليو 2007

Administrate 26 staff (Quality Control Inspectors, and central Lab, water treatment chemists)

• Instrumentation Strategies to ensure Optimum control of the all processes. With Costs never been in excess of budgeted targets

• Leadership All Departments, my department (especially) to Achieve "Signal achievement".

• Making Procedures and Work Instructions to Control injection - molding products produces in 35 injection machines works 24 hours in 4 sections with Quality performance to customer is expected to be 0 PPM

• Performing analytical lab testing procedures which Support the Control System
• Calibration of all requirements in central lab or in production sections

• Testing all Raw Material received from suppliers .and evaluate each supplier every 6 months

• GMPs, Pest Control Program, Cleaning, hygiene and Sanitation Program

• Preparing the quality plan on yearly basis. Compliance FDA & ISO System and updating Environmental Manual

• Responsible of the maintenance program of the water treatment unit (R/O system) .

• Statical improvement methods and how it serves Improving products' quality and help each dept. to achieve its targets

• helping all departments apply Company QMS, EMS and FMS to TS 16949 and ISO 9000:2000 in all Operations .

• a quarter annually audit on the plant applying the system requirements, Audit management

• making all Systems Procedures forms and training each department be capable to use it easy and daily .

• Training quality engineers and new comers. Evaluate their capability to ensure Optimum Control Requirements.

• Complaints complaint, Customer liaison and measurement the customer's satisfaction

• job orders (materials and master batches types and addition %) to agree the product's Specification, customer requirements.
• Tracing for all products and CACP (Corrective Actions & Preventive Actions) for any unconformity case.
\• written C.O.A for all products has all tests results, Approved specifications has my signature too
• Data Analysis:
highlighting Of The Weak Points
Recommendation Of Solving Problems..
Training & Recommendation Of Qualified Persons

• Improvement Criteria:
Highlighting The Area Of Improvement in Quality.
Monthly Action Plans.
Weekly & Daily Meetings TO Track The Action Plan Progress.

• Reporting:
Daily, Weekly And Monthly.
Performance Tracking.
Charts
• Plant Visualization

Quality Assurance Supervisor , Central Lab , water treatments units and the syrup units supervisor, في PEPSI- COLA
  • مصر - الإسكندرية
  • مايو 2002 إلى يوليو 2004

Instrumentation Strategies to ensure Optimum control of the processes. and apply PCI Standards.
• Leadership the team to Achieve "Signal achievement".
• Making all lines' charts which include Quality line testing.
• make S.P.C for every production and every operation after decade its target.
• Performing analytical lab testing procedures which Support the Control System Eng.
• Calibration of all lab equipment.
• Testing all Raw Materials.
• Preparing all chemicals & Indicators.
• Supervising Pest Control Program.
• Preparing the quality plan on yearly basis.
• Responsible of the maintenance program of the water treatment room and the syrup room. Controlling water treatment process with Ion Exchange or R/O system.
• Performing a quarter annually audit on the plant applying the system requirements.
• Controlling Lines Production. According to the principles of M&W System.
Charts
• Plant Visualization

• Quality Engineer (Raw Material - Tablet /Capsule Production Lines). في Al-Ameria for Industrial Pharm.Co
  • مصر - الإسكندرية
  • يناير 2001 إلى فبراير 2002

• Training as Quality Engineer in :
• Checking all Raw Materials.
• Controlling Production Process (Tablets/ Capsule Section).
• Controlling Packages Tablets (Production Area)

الخلفية التعليمية

بكالوريوس, BCs
  • في Faculty of Science
  • مايو 2000

Chemistry -Botany

Specialties & Skills

Environmental Control
Quality Auditing
Inspection
Quality Assurance
الصحة المهنية
managements
leadrship,auditing, develop
computer skills
AUDITING
Strategic management
Business Development

اللغات

الانجليزية
متمرّس

التدريب و الشهادات

Lead Auditor Social Accountability S.A 8000 (الشهادة)
تاريخ الدورة:
May 2009
صالحة لغاية:
May 2012
SEDEX SYSTEM 0.2 MEMBER (الشهادة)
تاريخ الدورة:
May 2009
صالحة لغاية:
May 2012
Lead Auditor Environment Manager ISO 14001:2004 (الشهادة)
تاريخ الدورة:
January 2009
صالحة لغاية:
January 2012
Lead Auditor Health and Safety ISO 18001:2007 (الشهادة)
تاريخ الدورة:
May 2009
صالحة لغاية:
May 2012
Lead Auditor Quality Management SO 9001:2008 (الشهادة)
تاريخ الدورة:
May 2009
صالحة لغاية:
May 2012

الهوايات

  • chess, swimming , marchal Arts and carry weights