Electrical operating Engineer
SONELGAZ (National
Total des années d'expérience :17 years, 3 Mois
distribution) in W.Ghardaïa, ALGERIA Electrical Power station, Operation phase
• Manage and ensure the HV and LV failures.
• Establish the monthly report in collaboration with methods engineer.
• Ensure compliance of safety rules.
• Participate in developing the work and maintenance program.
• Follow the evolution of the load of the transformers.
• Manage of service transformers, improve the operation efficiency power system by 32%.
• Approval of extension studies and connections in BTA network.
• Create slides decks with direction for altering designs to minimize technical issues by 37% in implementation .
• Provided recommendations to resolve 93% of issues with SCADA, Substations and systems integration failures. Testing & Pre-commissioning, startup, Construction phase Testing & commissioning of following Electrical Equipment: Testing and commissioning of all Electrical equipment from 10 volts to 30 kV System.
• Indoor and outdoor substation and substation equipments with all type of Instrumentation Transformers, Power Transformers, circuit Breakers, etc. Testing of:
• Current Transformers, Potential Transformers, Capacitance Voltage Transformers.
• Lightning Arrestors, Surge Counters, Switchyard equipment test.
• Circuit Breakers: Air Circuit Breaker(415V CB) Vacuum Circuit Breaker, (6.6KV, 11KV, 33KV, CBS), 200MVA, 160MVA, 40MVA POWER Transformer and 2000KVA, 1000KVA, 500 KVA.