Lead Project Engineer
Al Munif Pipes
Total years of experience :6 years, 6 Months
• Planning, setting deadlines, and monitoring project progress to develop the project idea into actionable plan (Projects in NEOM, Red Sea, Al Ula, and Jeddah… etc).
• Integrating the new sustainable material (Fiber Glass) as a substitute for concrete and steel which preserve the strength while being ecofriendly and doing optimization for installation.
• Tracking the team use of funds, hours and resources to create a breakdown of costs of each part of the project to be delivered and communicated to the stakeholders.
• Communicating with Stakeholders and keeping them informed about the progress and adapting to their inputs( Al Fanar, ROSHN, Nesma & Partners, AECOM, Al Mabani, SAP, Louis Berger, DAR, PARSONS…etc)
• Creating and monitoring key performance indicators (KPIs) - establish the milestones of each phase - evaluate the metrics established to determine the success of the project on Primavera.
• Creating LCA and LCCA for projects using special materials and assessing the environmental impact on a long life Span.
Jeddah, KSA
Apr 2021
• Present
*Creating the electrical systems for solar power plants, which involves creating a study plan
and meeting customer demands, within standards on EPLAN and Sketchup.
* Checking and confirming on the mechanical drawings and software Simulation for projects to
check load conditions on ROBOT, Helioscope, and AUTOCAD.
* Final Assessment and Commissioning for the inverters such as Fronius, Goodwe,
Victron, SMA as well as water pumping inverters before delivery.
* Develop schedules, budget reports, contracts, QA/QC reports and work on estimation projects
using BOMA, and getting energy consumption assumptions from EQUEST.
* Creating Energy Efficiency Reports for HVAC and Energy losses in buildings to find
effective methods for energy saving on HAP, ANSYS, EnergyStar, EQuest, Blast.. etc.
Internship
* Design photovoltaic (PV) and solar thermal systems, including system components,
for Residential and commercial uses.
* Monitoring of large turbines in Piacenza Desalination plant, and creating optimization
techniques on Software.
* Provide technical direction and support to installation teams during installation of water
turbines, start-up, testing and system commissioning.
Internship
• Sizing HVAC system for the whole airport, and got approvals on the designs
• Planning drafts for electrical systems in planes and Power distribution systems for small and medium voltage.
• Working on the assembly of heating and cooling equipment, including air ducts, pipes, valves, engines, turbines, and compressors
• Designing and testing energy systems through computer simulation and practical labs experiments under supervision
• Creating draft Budgets and cost estimates
• HVAC technical skills
• Project development
• Cost estimates
• Computer modelling and testing
• Sustainability skills
• Google Docs, Sheets and Slides
Distinction Student
Honor Listed
Minor in Mathmatics Honor list Student
URL removed due to policy violation. Please contact support for further information.