Hussam Alhasan, Zone Manager

Hussam Alhasan

Zone Manager

KSA

Location
United Kingdom
Education
High school or equivalent, Electrical Engineering
Experience
29 years, 5 Months

Share My Profile

Block User


Work Experience

Total years of experience :29 years, 5 Months

Zone Manager at KSA
  • Iraq
  • My current job since January 2010

 MV (13.8) Cable Pulling between Shamya 1 (66/13.8) Substation and Main Haram Switch station
(12 Switch gears).
 Installation and testing and commissioning of 12 Switch gears and 23 Transformers Distributed at
Haram site.
 Attending Regular Meetings with the Construction Manager (C.M) and Project
 Attending Regular Meetings with Main Contractor (M/s. SBG -ABCD) and the
 Consultant (M/s. DAR) to solve the issues at site.

Consultant at Khatib & Alami ,
  • Saudi Arabia
  • January 2006 to January 2010
Contractor at electricity
  • January 1995 to January 2006
Consultant at ADVANCED VISION ( SAUDI BIN LADIN GROUP )
  • to

Having around 21+ years of experience in Saudi Arabia & Syria countries in the areas like
Project Execution and Coordination related to Electromechanical works.
Extensive experience to lead team of Engineers for several specific projects conducting
technical and contractual meetings.
 Tendring projects
 Planning Site .
 Monitoring of site activities and provide guidance to site Engineers.
 Reviewing and approving project monitoring reports, chart, etc.
 Interacting/coordinating with Electrical and mechanical design & contract groups.

Project at Abh
  • to

1. water treatment plants.
2. sewage pumping station and water network in the city of southern Dhahrane.
Responsibilities :
 installation of (HV, MV & LV). .
 Installation Testing, Commissioning and transformer oil replacement of High Voltage
substation ABB.
 Installation and testing and commissioning of Switch gears and Transformers.
 Testing and Commissioning.
* water company for drinking water projects, Syria .

operation & maintenance manager
  • to

water company for drinking water projects

Project Planning
  • to

 Reviewing the Last Electrical drawings at site technical office
 MEP coordination
 Supervision the Site Electrical works by arranging with Zone Managers and
 his team.
 Follow-up Materials availability at site and raise the Material Request as
 per site requirement.
 Ensuring the Execution work at site following last design drawings (sketch
 Drawing).
 Issue the R.F.I as required for site work.
 Follow-up site engineers to raise I.Rs for the work been carried out at Site.

  • to

 Design and supervision all electrical services for any type of projects.
 Prepare a (Shop drawing & Material) Submittal and all other documents.
Eng.Hussam PAGE 3
RESUME
 Review and issue approval for the materials submittals and shop drawings by ensuring that they
comply with the project specifications & design.
 Able to manage, coordinate all site activities and project management aspects.
 Prepare the following (Material log sheet, Shop drawing log sheet, weekly ahead program, Site
progress, Monthly payment)…..etc.
 Attending Site Progress, Technical & Co-ordination meetings, and the preparation of minutes of

Education

High school or equivalent, Electrical Engineering
  • at Teshreen University
  • May 1995

-

Specialties & Skills

AUTOCAD
CABLEADO
CONSULTING
GRAPHIC DESIGN
MATERIALS MANAGEMENT
MECHANICAL DESIGN
MEETING FACILITATION
MICROSOFT PROJECT
SWITCHES

Languages

Arabic
Expert
English
Expert