Hussam Haddad, Senior Electrical Engineer

Hussam Haddad

Senior Electrical Engineer

Self Employed

Lieu
Canada - Alberta
Éducation
Master, Electrical Engineering in Power Systems
Expérience
14 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :14 years, 10 Mois

Senior Electrical Engineer à Self Employed
  • Canada - Calgary
  • Je travaille ici depuis juin 2023

• Working on various projects and activities in the electrical design of complex process units and meeting safety requirements
• Reviewing and approving vendor packages for technical adequacy and conformance with project requirements
• Generating scope of work (SOW), project bill of material (BOM), and procurement documents for vendor proposals

Reliability Engineer à Suncor
  • Etats Unis - West Hills
  • avril 2023 à juin 2023

• Working on various projects and activities in the electrical design of complex process units and meeting safety requirements
• Reviewing and approving vendor packages for technical adequacy and conformance with project requirements
• Generating scope of work (SOW), project bill of material (BOM), and procurement documents for vendor proposals

Senior Electrical Engineer à Wood plc
  • Canada - Vancouver
  • septembre 2022 à avril 2023

• Responsible for Front-End Engineering Design (FEED) support on mining projects
• Performed engineering design and related duties; including power system studies (ETAP), equipment specifications and selection, management of vendor/ equipment suppliers, power distribution layouts, grounding, cable distribution design, motor schematics, single line diagrams, lighting design and wiring diagram
• Created a load list according to electrical specifications and single-line diagram, and compiled the required documentation for the bid proposal. This included 5 KV Switchgear, motor control centers (MCCs), and load centers

Electrical Project Manager à Government of Nunavut
  • Canada - Iqaluit
  • septembre 2019 à juin 2022

Responsible for providing power generation and distribution technical support and electrical system design services for multiple projects throughout the project life cycle from conceptual design until project completion
• Created bid proposal packages, specifications, and technical contracts for new power plants
• Created a project plan and cost analysis for the Government of Nunavut budget approval
• Performed on-site electrical inspection and supervision during construction and project execution
• Managed various project schedules, ensuring adherence to budget

Reliability Engineer à Canadian Natural Resources Limited
  • Canada - Fort McMurray
  • juillet 2018 à juin 2019

Contributed to detailed design, construction, commissioning and start-up at Kirby North Phase #1 $1.4B SAGD Oil Sands in Situ project
• Provided leadership, and directions to multiple stakeholders regarding site activities, technical interfaces, and engineering work packages, to mitigate obstacles and safely expedite task execution on time
• Reviewed control schematics and drawings, providing design changes to meet the project requirement
• Prepared, approved, and managed site Instructions, Engineering Change Notice and Field Requisition

Lead Commissioning Engineer à GE Power, Newfoundland & Labrador, Nalcor Energy
  • Canada - Terre-Neuve-et-Labrador
  • mars 2016 à juin 2018

Tested, verified and inspected 800 million Lower Churchill project on five substations on a 900MW transmission line.
Key Accomplishments
• Through calm diplomacy coordinated and directed 32 engineers and technicians from multiple teams. Resolved conflict resolutions resulting in increased efficiency of day-to-day operations
• Provided leadership and directions to multiple stakeholders regarding site activities, technical interfaces and work packages, in order to mitigate obstacles and safely expedite task execution on time
• Developed and reviewed mechanical completion check sheets and specifications to ensure proper project monitoring and engineering practices are fulfilled
• Engaged executive management and key clients in problem solving negotiations
• Conducted tailboard daily meetings, to ensure continual safety, Lockout/Tagout procedure, PPE, and work permits for personnel safety & risk mitigation resulting in 1.5 years accident free record
• Supported multiple construction activities to expedite work progress through providing approved drawings and addressing materials deficiencies in a timely manner
• Guided construction team to meet client expectations, avoiding time delay and organizational political complexity, reducing lag time by 6 weeks

Lead Project Engineer à Schneider Electric Canada Inc
  • Canada - Calgary
  • juillet 2013 à décembre 2015

Directed engineering design of $200 million project contract for Natural Gas Power Plant. Managed, designed and controlled critical delivery schedule of $3M project contract for Paper and Pulp
Key Accomplishments
• Developed project phases, work packages, and deadlines. Led 5-7 engineers on technical and supervisory level to ensure final contracts on time and within budget
• Designed area classification, Programmable Logic Controller (PLC) & HMI configuration, Remote Terminal Units, and control system architecture using Plot Plan, Piping & Instrumentation Diagrams (P&ID) and Instrument Index
• Evaluated bid packages control systems and detailed engineering design assured cohesiveness and consistency
• Waste management disposal containment. Particularly in harmful effect of oil transformer with PCB
• Organized 15-20 supervisors and technicians in the field. Concluded a 12 day assignment in a 6 day window due to time constraint

Electrical Engineer à Siemens Grid
  • Canada - Calgary
  • août 2011 à mai 2013

Designed auxiliary power systems on a 2000MW four converter stations for Eastern and Western Alberta Power and Transmission HVDC mega projects.
Key Accomplishments
• Defined bill of material, scope of work, and prepared auxiliary power system technical specifications for both projects
• Maintained fluid communication with other discipline engineers, vendors, contractors and senior management
• Directed substation design and procurement activities taking into consideration continuity of service and technical design integrity. Engineered multi-lateral products and services 30% of my time
• Studied International engineering designs, equipment sizing, single-line diagram and detailed interconnection drawings to ensure compliance with Canadian codes and standards

Commissioning Manager à Siemens Energy Canada Ltd
  • Canada - Calgary
  • janvier 2009 à août 2011

Coordinated Pipeline project site activities, inspected all equipment and materials supplied for 21 pump-stations. Over $550M contract for the mechanical and electrical equipment delivery, testing, supervision and start up activities.
Key Accomplishment
• Developed engineering deliverables and promoted closure of Nonconformity Reports (NCRs) with correct documentation that addressed customers concerns
• Participated in Factory Acceptance Tests (FAT) on substation power equipment to ensure product compliance
• Handled Site Acceptance Tests (SAT) through visual inspection and deploying PLC for monitoring and controlling states of devices in conformity with approved drawings and protection philosophy
• Established network loop communication between relays to increase reliability and supervision
• Troubleshot and oversaw testing of 4160Vac 5750HP variable frequency drive ROBICON Perfect Harmony applied approved interlocking control philosophy and safety procedure
• Supervised 8-12 service engineers. Managed large-scale and complex projects across multiple products. Ensured effective usage of project resources, cost effectiveness and timely delivery

Éducation

Master, Electrical Engineering in Power Systems
  • à Mendeleev University of Chemical Technology
  • juillet 1996

Specialties & Skills

Commissioning
Project Management
Renewable Energy
Contract Negotionations
Power Systems Engineering
Power Generation
ARC Flash Study
Transmission & Distribution Substation Design
Transmission Line Design
Ground Grid Design

Adhésions

APEGA- the Association of Professional Engineers and Geoscientists in Alberta
  • Active Member
  • April 2012
IEEE
  • Active member
  • January 2014
PMI
  • Project Management Professional-PMP
  • June 2022

Formation et Diplômes

PLS-CADD- Transmission Line Design (Formation)
Institut de formation:
Power Line Systems Inc.
Electrical Power System Analysis (Formation)
Institut de formation:
ETAP
Protective Relays Control & Protection (Formation)
Institut de formation:
Schweitzer SEL
Date de la formation:
April 2015
Workplace Electrical Safety based on CSA Z462 (Formation)
Institut de formation:
Schneider Electric
Date de la formation:
April 2016
Power Line Hazard (Formation)
Institut de formation:
GE
Date de la formation:
March 2016
Canadian PipeLine (Certificat)
Date de la formation:
April 2018

Loisirs

  • Technical Events & Networking
  • Travelling
  • Reading
  • Chess