Pipe Line Snoir Operator @ Main Control Center & Pump Stations
Petrodar Operating Company Pipe Line Department
Total years of experience :8 years, 6 Months
• Manage Site and Control Room Activities.
• Start and top pall station Equipment.
• Daily Operating and Checking for the following:
1-Pumping system (Wartsilla machine, Sulzer Pump).
2-Heating System (Bono Energy a (Heaters), Heat Exchangers.
3-Power Plant (Rollse Royce Machines, Black Start Machines.
4-Nitrogen System (nitrogen generators)
5-Air System ( instrument utilities air compressors)
6-Stroge Tanks (crude, diesel, water, thearmaloil and lubrication).
7-Control System (DCS for local station & SCADA for all pipe line station).
8-Making daily, weekly and monthly report for the station.
9-Make Reinjection for Crude oil from close drain to main line suction.
10-Sent and Receive Pig from station to station.
11- Take reading for main units like suction press, Discharge Press, flow rate of crude oil, Increase and Decrease Flow Rate for Engines, also take reading for other station Equipment like Gensets, Heaters, Comprossors and Storage tanks
Responsibilities:
Prepare the raw materials and Lap analysis
Responsibilities:
1.Supervision for production line, Quality Controller, Prepare
2.The raw materials, Lap analysis.
Master of Business Administration (MBA) in University of Sudan for Technology and since By cooperated with Centre for Engineering and Technical Studies (CETS).
BSC Honor in Chemical Engineering