Construction Manager
Saudi Arabian Baytur
مجموع سنوات الخبرة :20 years, 9 أشهر
Construction Manager for MISK project. • Managing the assignments of manpower, material, and equipment’s to maximum efficiency, maintain schedules and to meet budgets goals. Keep alerts to possible problems area and taking prevention action to ensure that critical milestones are met for each of the project.
• Prepare periodic reports summarizing progress activities for higher managements.
• Ensure the use of construction practice to attain required quality control as well as safety.
Project: construction of 306 villa Client: National Housing Projects Project Budget: 105 M.SAR Position: Project Manager Assignments
Construction Manager for SECURITY FORCES MEDICAL CENTER 2016 until 2019.
Medical complex with hospital building contains (basement Spurs, 4 podiums, and 12 typical
floors) a covered 1700 Beds.
• underground service tunnel connects services building with main hospital building.
• 70 guest Villa for senior staff with Main Mosque.
• 24 apartments Buildings G + 10
Construction Manager for Yasref Project - Aramco 2013 until 2016 .
Main Administration complex built over 7000 m2 detailed into four crossed building (CEO office, operation offices, kitchen and restaurant, administration offices, Auditorium, emergency clinics and Data center)
• Operation buildings (Lab buildings, fire and safety, central control, operation BLDG)
• maintenance Buildings and data center, in addition to 8 operational shelters)
• Industrial showrooms (Warehouse and workshop)
• 21 sewerage lift stations
• Infra structure works for the entire MC5 package includes open storm water ditches and culverts.
• Security fences and passing gates with mechanical barriers and their electronic devices
Construction Manager at Western Housing Project - Silah . from 2011 until 2013 .
• Emirates Community under the Urban Planning Council (UPC), which consists of 448 Villa with
Infrastructure facilities
SECTION ENGINEER at GOLF GARDEN 2 - Abu Dhabi from 2009 until 2011 .
.• project contains 33 Residential Buildings (1, 600 apartments) with different height buildings (G+10
, and G+5).
• Community center attached with main Mosque
• Infra structure and hardscape.
Senior Engineer at Jumeirah Heights Project
• The project comprises from 3 Zones called the fronds and Clusters.
• The fronds include 2 Midrise building (G+11) in addition to 17 townhouses.
• The Clusters have 6 low rise building (Basements +G +2) the apartments duplex
Site Engineer at Executive Height Project.
• Commercial office Tower build over 1750 m2 for 24 typical floors.
• 3 underground Basements and five podiums built up over entire area 5500 m2.
• Landscape and GYM and jogging track constructed over last podium.
Site Engineer at MG construction group .
Underground drainage pipeline for agriculture lands extended for seven kilometers.
• Project included three lift stations and drainage piping
• Pipe culverts each 40 m length for pedestrian purpose as well as cars.
لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.