إبراهيم أبوالسعود, Construction Manager

إبراهيم أبوالسعود

Construction Manager

ABV Rock Group Company

Lieu
Arabie Saoudite
Éducation
Baccalauréat, Civil Engineering
Expérience
16 years, 10 Mois

Partager Mon CV

Empêcher usager


Expériences professionnelles

Total des années d'expérience :16 years, 10 Mois

Construction Manager à ABV Rock Group Company
  • Arabie Saoudite - Riyad
  • Je travaille ici depuis novembre 2013

SFMC “Security Forces Medical Center” - Riyadh
Client: MOI “Ministry of Interior”
Project Budget: 11 Billion SAR
Position: Construction Manager
Project includes:
• Medical hospital ( G +4 Podium + 12 floor ) covered 1700 Beds
• Service Tunnel, multistory car parking
• Residential Villas with Main mosque
• Family and Single apartments Buildings G +10
• Utility buildings
• Data center
• Infrastructure including pipelines, landscape and asphalt
• Boundary wall

Senior Engineer à Fast Energy Company
  • Émirats Arabes Unis - Abu Dhabi
  • avril 2010 à septembre 2013

NBAD “National Bank of Abu Dhabi” - Western region branches
Client: National Bank of Abu Dhabi
Project Budget: 42 Million UAD
Position: Site Engineer
Project includes:
• Excavation and de-watering works
• Concrete piling works
• Building concrete works
• Bank safe rooms with special steel reinforcement
• External water tank and septic tank
• External manholes and chambers for sewerage system
• All electrical and mechanical works including BMS ( Building Management System )
• Internal and External finishing works including glass and aluminum facade
• All external works including pipelines and landscape works

Site Engineer à Ben Ghanam Group
  • Émirats Arabes Unis - Al Ain
  • septembre 2008 à mars 2010

Abu Dhabi Villas compound ( 20 Villas )
Client: First Gulf Bank
Project Budget: 50 Million UAD
Position: Site Engineer
Project includes:
• Excavation and de-watering works
• Concrete works
• External water tanks and septic tanks
• External manholes and chambers for sewerage system
• All electrical and mechanical works
• Internal and External finishing works
• All external works including pipelines and landscape works

Site Engineer à Al Thoraya Company
  • Egypte
  • juin 2007 à juillet 2008

Project includes:
* Concrete works Z-Portals foundations
* Installing electrical pipes for the machines
* Installing Z-Portals for heavy trucks
* Installing Z-Portals for passenger cars
* Building and constructing steel structure and concrete hangers
* All external works in UAE borders including pipelines, landscape and asphalt

Éducation

Baccalauréat, Civil Engineering
  • à University of Alexandria
  • mai 2007

Specialties & Skills

Microsoft Windows
Home Office
MS Project
Teamwork
Computer

Langues

Arabe
Expert
Anglais
Expert

Formation et Diplômes

PMP Fast Track (Formation)
Institut de formation:
Yanbu Technical Insitute
Date de la formation:
April 2015
Durée:
20 heures
Budgeting and Scheduling Projects (Formation)
Institut de formation:
UCI
Date de la formation:
September 2016
Durée:
40 heures
Managing Project Risks and Changes (Formation)
Institut de formation:
UCI
Date de la formation:
October 2016
Durée:
40 heures
Initiating and Planning Projects (Formation)
Institut de formation:
UCI
Date de la formation:
September 2016
Durée:
40 heures

Loisirs

  • Computer