إبراهيم دسوقي, Construction Manager ( Fit-out)

إبراهيم دسوقي

Construction Manager ( Fit-out)

Arabian Construction Company (ACC)

البلد
المملكة العربية السعودية - جازان
التعليم
بكالوريوس, Architecture Engineering
الخبرات
20 years, 10 أشهر

مشاركة سيرتي الذاتية

حظر المستخدم


الخبرة العملية

مجموع سنوات الخبرة :20 years, 10 أشهر

Construction Manager ( Fit-out) في Arabian Construction Company (ACC)
  • المملكة العربية السعودية - جازان
  • أشغل هذه الوظيفة منذ ديسمبر 2017

Project includes six family housing cities for Ministry of Interior in Jazan area. The capacity
of these cities varies from 200 to 1700 unit; total construction value about 8 Billion Saudi
Riyals. All cities have complete services including schools, shopping malls and recreation
facilities.
Total project value 4.2 Billion SAR
2January 15, 2019

Responsibilities and duties.

1) Schedule the project in logical steps and budget time required to meet deadlines.
2) Determine labor requirements.
3) Study job specifications to determine appropriate construction methods.
4) Direct and supervise workers.
5) Requisition supplies and materials to complete construction projects.
6) Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, complaints, and construction problems.
7) Develop and implement quality control programs.
8) Evaluate construction methods and determine cost-effectiveness of plans.
9) Plan, organize, and direct activities concerned with the construction and maintenance of structures, facilities, and systems.

Finishing Manager في Saudi Bin ladin Group
  • المملكة العربية السعودية - جدة
  • مارس 2014 إلى ديسمبر 2017

(novamber2016- novamber2017)- Prince Mohamed Bin Naif Palace (AL-Badiaah
Palace).
Job description
Finishing Construction Manager Responsible for all the finishing works.
Total project value 190 million SAR
Prince Khaled Al Faysal Palace.
Job description
Finishing Construction Manager Responsible for all the finishing works and making
handing over for the project.
Total project value 850 million SAR
Ministry Of Education
Responsible for all the finishing works and making handing over for the project.

Total project value 200 million SAR
National Guard
housing project
Information about the project: The project consists of 1250 Villas finishing with full project
infrastructure services the projects have two houses, one for officers and soldiers,

Job description
(senior site architecture engineer): Responsible for the finishing of 100 villas

Total project value 1.2 Billion SAR

Responsibilities and duties.

1) Schedule the project in logical steps and budget time required to meet deadlines.
2) Determine labor requirements.
3) Study job specifications to determine appropriate construction methods.
4) Direct and supervise workers.
5) Requisition supplies and materials to complete construction projects.
6) Confer with supervisory personnel, owners, contractors, and design professionals to discuss and resolve matters such as work procedures, complaints, and construction problems.
7) Develop and implement quality control programs.
8) Evaluate construction methods and determine cost-effectiveness of plans.
9) Plan, organize, and direct activities concerned with the construction and maintenance of structures, facilities, and systems.

Senior Architect في ECG (Engineering Consultants Group)
  • مصر - القاهرة
  • مارس 2009 إلى فبراير 2014

Information about the project: is a new town (only first and second phases) contains. 2250 Villas with Swimming Pool., 580 building consists of 7 floors, (Roads -Landscape\} between Villas and building, Administration Building, Social Building, Golf area and social club, Play Ground Building, Mosques building, Swimming pool building, Mall Building, University building and Hospitals.
Responsibilities and duties.

Maintains daily diaries of events associated work on site
• Supervises his subordinate staff members in the execution of their responsibilities.
• Monitors, reviews, comments and reports on progress payment, quality control and safety.
• Logs and monitors all contractors' submittals. (Correspondence and shop drawings) to assure timely response and process change and field orders for reviews by construction manager.
• Prepares necessary draft correspondence for final approval

Site Architect في square engineering firm
  • مصر - الإسكندرية
  • فبراير 2004 إلى مارس 2009

San Stefano (grand plaza) Alexandria

Stage (1): the retail mall and the multiplex cinemas. (june2005 -June 2006)
Stage (2): the luxury units at tower 5 & 10 (june2006 -February2009)
Information about the project (stage 1): This is one of the most important buildings in the middle east The Mall at San Stefano was designed by a Canadian "D.I. Design &
Development Consultants Ltd.", leading North American Retail consultancy firm. It
consisting of 55, 000 m2 with almost 180 shops distributed over four floors. &10- screen
multiplex cinemas

(Statge 2): Tower 5&10 2 separate cores each core consist of 30 typical floors which consists of 266 luxury units (16 different types). Designed by the world renowned French
designer Pierre -Yves Rochon, all apartments include the finest finishing details and complete fire fighting net work and HVAC system.

Owner San Stefano co. For real state investment.
Construction Manger Laing International.
Architect THE WEBB ZERAFA MENKES HOUSDEN.
Consultant Dar AL-HANDASA (Egypt)
Main contractor Square Engineering firm
Total project value 150 million US$

Maintenance engineer في Intercontinental Heliopolis, Cairo, Egypt
  • مصر - القاهرة
  • أغسطس 2003 إلى فبراير 2004

The luxurious InterContinental Cairo City Stars is situated adjacent to Cairo's largest retail
and leisure complex; InterContinental Cairo City stars offers 790 superior rooms and suites
The building includes the 3000 square-metre Lifestyles Health Club and Spa, squash and tennis courts, a large outdoor swimming pool, children's pool Casino and 18 versatile function
rooms including Al Saraya ballroom, the largest hotel banquet hall in Cairo, with a maximum
capacity of 2200 persons in a reception setting

الخلفية التعليمية

بكالوريوس, Architecture Engineering
  • في Helwan University
  • يوليو 2002

General Grade: C ▪ Graduation Project Grade: B * School: Hassan Abu Bakr language school (Primary, Preparatory & Secondary classes) * Coursework included: ▪ Engineering Fundamentals: Arch. Design of complex units, Arch design in new towns, Urban design, working drawing & details, Visual tanning, Technological installation for buildings, Plumbing, Desert Environmental design, Solar Arch., Town Planning, Building construction & materials, Soil ▪ Management Courses: Principles of management, Project management, Construction Project Specifications, Scheduling, Execution design & documents, Cost Estimation, Engineering Economy, Operation research & ▪ Graduation Project: Museum Project on contour at the highest point of

Specialties & Skills

Teamwork
Microsoft Excel
Site Plans
AutoCAD
MS Office tools
MICROSOFT OFFICE
MONITORS
PROGRESS
QUALITY CONTROL
AUTOCAD

اللغات

العربية
اللغة الأم
الانجليزية
متمرّس

التدريب و الشهادات

Arch (الشهادة)

الهوايات

  • Reading