Assistant Resident Engineer (Instrumentation & Control)
DAR AL HANDASAH, PMCM, DOHA – QATAR
مجموع سنوات الخبرة :33 years, 0 أشهر
(For Project details, refer to Appendix#1)
• Reviewal / Approval of Contractors Design and Engineering Documents for Instrumentation & Control, BMS, Process (P&IDs), Fuel Leak Detection.
• System (HACNA) and some other Electrical Drawings. These documents include Shop drawings, Material Submittals, Method Statements, FAT/SAT Procedures, SCRs, Manuals, etc.
• Focal Point from PMCM for all I&C and BMS related works.
• Attending Local Factory Tests.
• Involvement in Mechanical Systems Testing and Commissioning, including Pipelines tests (Flushing, Hydrotests and system operations), Fueler and Refueler skids, Fire Fighting System, etc.)
• Close Coordination with Employer Project Team, Employer Facilities, Project Designer, Contractors, and Subcontractors.
• Weekly Progress Meetings with Contractors, Employer and Project Designer Teams.
• Daily follow up and approval for Construction and Testing & Commissioning works related to I&C and BMS.
• Red Line Marked up and As Built Drawings review/approval.
• Taking part in the approval of Contractors Sectional Completion Certificates.
Project Details: Operation and Maintenance for MEW (KUWAIT Ministry of Electricity & Water) GIS Project (Geographic Information System)
• Leading and follow up the implementation of the Projects Scope in coordination with the MEW Project Manager.
• Senior Specialist for Electrical GIS Database, Updates Implementations, Training MEW Personnel, Online Support, Site Verifications (Surveys), etc..
• Follow up with MEW for Project Invoices and new Proposals/Services.
• Administrational Management for the Project Team.
RIYADH PP10 Power Plant, Two Stages Sept 2009 - Nov. 2017
• Stage#1: RIYADH PP10 Simple Cycle Power Plant
• Stage#2: RIYADH PP10 Combined Cycle Power Plant (conversion from SC to CC)
(For Project details, refer to Appendix#1)
• For Stage#1 Managing and controlling the I&C and DCS construction and commissioning works for all the above Project Scope, in line with Quality and under Safety concepts.
• For Stage#2 Managing and controlling the I&C and DCS construction and Pre-commissioning works for all the above Project Scope, in line with Quality and under Safety concepts.
• For Stage#2 Responsible for Site Engineering works, preparing and submitting to clients all Design or Field Changes and obtaining Clients approvals.
• Responsible for the Execution of I&C Scopes in line with the Project Time Schedule and Budget, coordinating with the Owners and Clients for any changes due to site conditions.
• Administrative and Technical Leadership for all I&C Manpower including the Vendors.
• Close coordination and Meetings with the Clients and Owners during all stages of the project.
• Daily Reporting to the Project Management for the Status and achievements.
• Closing and clearing all raised Punch lists and NCRs.
Achievements:
• Completing and closing the Project within the agreed Time Schedule and under controlled Budget.
• Further Experience in the Project Scheduling, Budget, Cost Control and Man-hours allocations.
• Good Experience in the Combined Cycle System and HRSGs
• Additional Experience in Instrumentation Works and Instruments Calibration
• Additional Experience in Networks and Control Systems
• Additional Experience in Design and Engineering Works.
Worked for the company at two projects:
1. Najran Power Plant: my tile was Site Manager
2. PP10 Riyadh Power Plant: My title was I&C Manager
NAJRAN PP Extension Project June 2007 -
Sept 2009
(For Project details, refer to Appendix#1)
• Managing and controlling the construction and commissioning works for all the above Project Scope, in line with Quality and under Safety concepts.
• Responsible for the Execution in line with the Project Time Schedule and Budget, coordinating with the Owners and Clients for any changes due to site conditions.
• Administrative and Technical Leadership for all Project Manpower including the Vendors.
• Close coordination and Meetings with the Clients and Owners during all stages of the project.
• Daily Reporting to the Project Management for the Status and achievements.
• Direct Leadership for the DCS system implementation and commissioning.
• Closing and clearing all raised Punch lists and Warranty Claims in very short time Achievements:
• Completing and closing the Project within the agreed Time Schedule and under controlled Budget.
• Project Leadership Experience with Multi Discipline scopes
• Gained new Experience with GE Control Systems (MARK IVe), DCS systems and SCADA.
• Building strong Relationship with the Clients and the Owners and meeting the Projects Milestones under their full Satisfactory.
Project Name : Azer-energy JSC Natural Gas Power Plants project Project Details : The project is a fast track, turnkey project to construct and operate 5 Gas Power Plants (100 MW each), at 5 diferent cities of Azerbaijan.
• Leading the site meetings with the diferent Subcontractors and AZERENERGY
• Preparing and following up a time schedule for all construction works.
• Managing and controlling all site construction works at the Powerhouse and the Substation (Electrical, Mechanical, I&C and Civil Works).
and controlling the diferent sections and units in the EDL (Électricité Du Liban), Municipal Beirut district
• Auditing the EDL SECTIONS: Substation Maintenance, New MTBT(s) (substations), Design & Installation and Overhead-Networks
• Auditing and controlling the Violations Inspection section by preparing and controlling their daily work and campaigns
• Energy Correlation Process: Installation of Energy Meters at the Output Feeders of Distribution Transformers to compare its reading with the Billed Energy and calculate the Loses and allocate it for Further Inspections.
• Inspect and test damaged machine parts, and mark defective areas or advise supervisors of repair needs.
• Read work orders and specifications to determine machines and equipment requiring repair or maintenance.
• Install, replace, or change machine parts and attachments, according to production specifications.
• Conduct field surveys and study maps, graphs, diagrams, and other data to identify and correct power system problems.
• Supervise and train project team members as necessary.
• Prepare and study technical drawings, specifications of electrical systems, and topographical maps to ensure that installation and operations conform to standards and customer requirements.
• Inspect completed installations and observe operations to ensure conformance to design and equipment specifications and compliance with operational and safety standards.
• Oversee project production eforts to assure projects are completed satisfactorily, on time and within budget.
• Preparing Sketches for the MV/LV network showing the land base information with the planed distribution of the fittings (towers)
• Step-down power transformers Installation
• Supervising the construction teams
• MV transmission Network installation
• Following up with the consultant for Progress and Execution Works
لقد تم حذف الرابط بسبب انتهاكه لسياسة الموقع. يرجى التواصل مع قسم الدعم لمزيد من المعلومات.