QA/QC Engineer
Bojamhoor Trading and Contracting
Total years of experience :30 years, 8 Months
Attended and facilitated Preconstruction conferences, utility coordination meetings, and weekly meetings to discuss progress or concerns on projects.
• Made decisions on and processed change orders for alterations or for additional work on projects.
• Created a schedule for the construction levels of manpower, materials, and equipment, including work with suppliers, subcontractors, while also conducting and supervising work inspections.
• Evaluated field problems, arranged project meetings and coordinate timely review and resolution of on-site issues.
• Perform daily inspection & test materials to achieve quality of construction required in the drawing & specification for all work under the contract document.
•Coordinate with consultant representative for inspection & meeting about quality problem.
•Taking care QA/QC documents include certificate certificate, calibration, test results, inspection request, NCR and site inspections.
•Responsible in quality & workmanship of every activities through knowledge of all phase of engineering ( Civil, Structure & Architecture).
•Monitor, review and approved Quality control Documentation progressively compiled during the project to ensure that all activities are recorded and reported as required.
.
• Detailed study of project drawings, specification, procedure, method of statement and QA/QC requirement.
• Supervised and monitor Sub-Contractor daily activities and ensure that work procedure are followed as specified in ITP.
• Demonstrate and conduct weekly meeting to all the people under my group including the subcontractor regarding progress status and how to perform job efficiently to make everybody aware in our target schedule.
• Scheduling and planning of any interfacing activity occurred during implementation and ensure proper site control for best HSE management.
• Identify and resolve immediately any technical problem not fulfilled by project requirement and actual site condition. Assist site engineering to match project specification and highlight critical problems like drawing mismatch, various management of change.
• Ensure that all materials, tools and equipment are available as per plan and schedule.
• Raised a job queries for a non-conformity occur ether through drawings, procedures, specifications and site condition.
• Conduct site inspection and prepare punch list to provide information and guidance to all discipline and make sure that punched items are being complied.
45 hectares US Embassy compound project as
58 Storey twin tower Golden Empire Condominium building project as
bill of materials prior to the start of every project.
•Prepare work scheduling.
•Review and checking of aluminium framing on site prior to the measurement for cutting list of aluminium composite panel.
•Making sure all installed panel are in proper alignment and in accordance in plans and specifications.
•Responsible for the completion of 21 projects as far as aluminium composite panel is concerned.
Manila Water System/On-Off Ramp and road/Sewerage system projects as
54 Storey Citiland Tower project as Civil/Architectural supervisor.
•Prepare weekly schedule to attain the target of one floor per week for structural works.
•Technical and logistic support to Foremen and charge hand.
•Conduct weekly coordination meeting to foremen and subcontractors representative so that everybody must aware of the target schedule as per phase of work
some 40 manpower in constructing the rock room and pipe rack structure.
•In charge in materials take-off and cutting list of rebar.
•Responsible for the endorsement and monitoring of all newly fabricated pipes/spools for radiographic test, brinell hardness test, stress relieving and penetrating test.
•Assist the production supervisor in the control of the production In field and fabrication shop.
•Work supervision from fabrication up to pipe erection which includes hydro testing and other service test needed/flushing of all new pipelines installed.
•Fabrication and installation of pre-cast pipe slippers and erection of pipe racks.
•Raised a job queries for a non-conformity of a specified requirements where anomalies occur ether through drawings, procedures, specifications if found detrimental to project.
•Ensure that all materials, spools & equipment are available as per plan and schedule.
•Proper coordination to various discipline in the field of construction regarding design changes on installed items due to site conditions.
•Preparation of test package, marked up test limit to P&ID, and review test package attachment.
•Performed line check and inspection on installed piping system using latest revision drawing.
30 Megawatts Mini-Hydro plant project as