Management Consultant في Saudi Aramco
  • المملكة العربية السعودية - الشرقية
  • يناير 2014 إلى يونيو 2020

Supervising FEED and detailed design development, preparing contractual correspondences and responses to contractual claims, reviewing and approving project key drawings and specifications, resolving design and development problems, mentor technical documentation preparation associated with risk management and assessing potential risks and mitigations, managing budgets and project resources, compiling, checking and approving reports, resolving disputes, managing changes, and guiding technical and program requirements derivation, administering LEED certification, correcting project deficiencies, conducting and evaluating technical and feasibility studies and putting business proposals, attending senior management meetings to provide subject matter technical consultancy, verification of procurement, resourcing, and payment, supervising bidding and tendering procedures and processes, troubleshooting pre-commissioning, commissioning and on stream startup.

Senior Project Manager في MUSTANG AL-HEJAILAN DAR PI (MUSTANGHDP)
  • المملكة العربية السعودية - الشرقية
  • أبريل 2011 إلى أكتوبر 2013

I assumed the responsibility for design management of major projects for Saudi ARAMCO. This includes communication with client and coordination with the respective design team. As a senior project manager, I managed various projects involving development of Pipelines, Instrumentation, Automation, Electrification, Cathodic Protection, Metering Stations, Sub-Stations, Mud Plants, GOSPs, etc.

Sr. Project Manager / Best Practice Facilitator في MUSTANG AL-HEJAILAN (MAH)
  • المملكة العربية السعودية - الشرقية
  • أبريل 2009 إلى أبريل 2011

I assumed the responsibility for design management of major projects for Saudi ARAMCO, SABIC, and other clients in Saudi Arabia. This includes communication with client and coordination with the respective design team.
As a Sr project manager, I managed various projects involving development of Office Buildings, Community Centers, Instrumentation, Electrification, etc.
As a Best Practices facilitator I conducted lots of Best Practice sessions of recommended by CII and adopted by Saudi Aramco, those best practices cover the following:-
• Planning For Start-Up.
• Constructability.
• Project Definition Rating Index.
• Project Execution Planning Workshop.

Project Manager / Project Control Supervisor / Internal Quality Auditor / Best Practice Facilitator في AL-HEJAILAN CONSULTANTS (AHC)
  • المملكة العربية السعودية - الشرقية
  • أبريل 2001 إلى أبريل 2009

I assumed the responsibility for design management of major projects for Saudi ARAMCO, SABIC, MOH, and other clients in Saudi Arabia. This includes communication with client and coordination with the respective design team.
As a project manager, I managed various projects involving development of Office Buildings, Data and Control Centers, Community Centers, Offshore Platforms Retrofit, Instrumentation, Electrification, Utilities, etc.
As a project control supervisor, I took responsibilities for maintaining a project control system for all design projects executed by the Company. Monitors project progress and budget man-hours. Reports directly to the Company Management for appropriate action as required.
As an internal quality auditor, I conducted many internal audits and participated in led many awareness sessions regarding maintaining and developing the quality management system in Al-Hejailan Consultants.
As a Best Practices facilitator I conducted lots of Best Practice sessions of recommended by CII and adopted by Saudi Aramco, those best practices cover the following:-
• Planning For Start-Up.
• Constructability.
• Project Definition Rating Index.
• Project Execution Planning Workshop.

Project Manager في SALCO CO.
  • المملكة العربية السعودية
  • سبتمبر 2000 إلى مارس 2001

Responsible the construction of the King Faisal Road Bridge; Client was Makkah Municipality. the bridge was crossing over Pedestrian Pilgrims pathway. The project included rock blasting, 32m long pre-stressed concrete beams, and 700 m approach road 6 lanes wide.

Project manager في ABDUL-RAHAMAN AL-TURKI GROUP (ATCO)
  • المملكة العربية السعودية
  • سبتمبر 1998 إلى سبتمبر 2000

Responsible for overall construction of Administration Buildings, utilities, site development at both Shedgum and Faras Power Plants for SCECO East (SEC now), consist of 6 concrete buildings with precast cladding, 2 steel warehouse Nullifire fire proofed. Also responsible for supervision of installation of utilities such as firefighting system, LAN, telecommunications, fire alarm systems, potable and raw water supply, HVAC system, etc.

Project Manager في M. SAUD ALSUBAI est.
  • المملكة العربية السعودية
  • نوفمبر 1997 إلى سبتمبر 1998

Managed the construction of the Hadeed II HRM Area. Work involved pricing, sub-contracting and planning for all civil activities in the Hadeed II HRM Area. Included deep excavation, Dewatering, reinforcement corrosion protection, round the clock concrete pouring. Clients were Saudi Voist Alpine/HADEED/SABIC

Construction Manager في M. SAUD ALSUBAI est.
  • المملكة العربية السعودية
  • مارس 1996 إلى سبتمبر 1998

As a Construction Manager for ALSUBAI est. I took the duties of Pricing Supervising and Managing Resources for the following projects:
WELL SITES PREPERATIONS (ARAMCO)
MULAIHA & UMMALSAWAD LINK ROADS (MINISTRY OF COMMUNICATION).
KHAFJI EXTENSION NETWORK (SAUDI TELECOM)

Project Manager في M. SAUD ALSUBAI est.
  • المملكة العربية السعودية
  • مارس 1996 إلى نوفمبر 1997

Responsible for construction supervision of civil work for the additional Berri Gas Plant Utilities, the project was an extension of the existing plant. Duties included pricing, contracting and planning for all the civil engineering activities in area. Clients were LUMUS/ DAELIM SA /Saudi Aramco

Project Manager في ARAB UNION COMPANY FOR CONTRACTING
  • سوريا
  • يوليو 1995 إلى فبراير 1996

Responsible for the construction management of Mobil Motor Oil Production Plant. Actively involved in construction of LSTK contract 2, 000 m2 of steel structure building, 30, 000 m2 of site development and all supporting facilities for MOBIL OIL CO.

Production Branch Director في GENERAL CO. FOR BUILDING
  • سوريا
  • أبريل 1993 إلى يونيو 1995

Responsible for managing the Production Branch that had a production capacity of fabrication and erection of two complete precast apartments per day. The Production Branch also produces all the supporting material and accessories such as wood and steel doors, door frames and windows, tiles, power networks, electrical apparatus power and lighting distribution panels, etc.

Was able to reach the production and erection target of (two precast apartments/day) in a 3, 000 apartment project requested by the client General Housing Organization. and Labor Union.

Plant Manager في GENERAL CO. FOR BUILDING
  • سوريا
  • يونيو 1991 إلى مايو 1993

Worked as Plant Manager for the Precast Building Production Plant, with a workforce of 400 staff, three concrete patching plants, vertical pouring batteries for concrete panels, tilting-table production system, steel form workshop, spot welded wire-mesh plant, steam curing, gigantic transporting squadron and QA/QC Lab. Duties included; trouble shooting in the production lines, stream line the production system, implementing corrective actions and maximize output.

I was able to rectify and revise all the production system and tools for the PRECAST BUILDING PRODUCTION PLANT and bring it back to productive state.

Plant Manager في JABAL KASSIOUN CO
  • سوريا
  • يناير 1983 إلى مارس 1991

Responsible for managing a plant for producing pre-stressed concrete members for bridges and buildings, utilizing steam curing of concreter members to assure earlier strength required for pre-stressing. The plants is complete production facility started from steel form production to reinforcement bar bending and mesh formation, two 35 ton overhead cranes for transportation, loading and offloading. Hydraulic system for operating the steel forms, production of conduits for housing the pre-stressing tendons, two concrete patching plants, steam boilers and piping system networks, digital instrumentation for control and monitoring of steam system operation and concrete members status, a dedicated fleet for pre-stressed pre-cast concrete members that reach to 150 tons each and 36 m length.

Supervised the production unit for pre-stressed concrete members and erection of the same at the patching plant.

Worked as Construction supervisor of 20 KM long Road in a steep hilly terrain at Al-Baridah.

الخلفية التعليمية

بكالوريوس, CIVIL ENGINEERING
  • في Damascus University
  • أغسطس 1982

Structural engineering was my major.

Specialties & Skills

Project Collaboration
Practice Management
Cost Control
Internal Audit
Value Engineering
PRIMAVERA & MICROSOFT PROJECT Planner
MICROSTATION 95 & AutoCAD
SURE- TRACK & SUCCESS

اللغات

الانجليزية
متمرّس
العربية
متمرّس

العضويات

Project Management Institute (PMI)
  • Member
  • June 1999
Syrian engineers union
  • member
  • September 1982
American Concrete Institute (ACI)
  • Member
  • January 2005
American Institute of Steel Constructing Inc (AISC)
  • Member
  • January 2008
Saudi Council of Engineers (SCE)
  • Member
  • January 2007
Saudi Society for Civil Engineering (SSCE)
  • Member
  • January 2006

التدريب و الشهادات

PMP (الشهادة)
تاريخ الدورة:
August 2006
صالحة لغاية:
August 2006
Accredited Value Specialist. 200804124 (الشهادة)
تاريخ الدورة:
December 2007
صالحة لغاية:
December 2007
QMS (الشهادة)
تاريخ الدورة:
December 2006
صالحة لغاية:
December 2006